An Asian Dilemma Modernising the electricity sector in China and India in the context of rapid economic growth and the concern for climate change

Lead Authors and Editors:

Joyeeta Gupta, Jaklien Vlasblom, and Carolien Kroeze

Contributing Authors:

Kornelis Blok, Jan-Willem Bode, Christiaan Boudri, Kees Dorland, Matthijs Hissche-möller

Reviewers:

From China: Li Junfeng, Energy Research Institute, Beijing

From India:

Tata Energy Research Institute, New Delhi R.K. Ghosh, Federation of Indian Chamber of Commerce and Industry, New Delhi

From Netherlands: Jan-Willem Bode, Ecofis, Utrecht Matthijs Hisschemöller, Institute for Environmental Studies, Amsterdam Bert-Jan Heij, Netherlands Research Programme on Global Air Pollution and Climate Change, Bilthoven Jaap de Ridder, Shell Netherlands, The Hague

Report number E-01/04

June 2001

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (2)

iii

Contents

Acknowledgements vii

Executive Summary xi

1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change problem 2 1.3 The dilemma for China and India 7 1.4 The research problem and focus 8 1.5 Summary 9

2. Methodology: An Integrated Framework 11 2.1 Introduction 11 2.2 Links to International Research Programmes and Approaches 11 2.3 An Integrated Assessment Framework 12

2.3.1 The Scenario approach 13 2.3.2 The technological approach 14 2.3.3 Institutions and stakeholder approaches 15 2.3.4 The Approaches Integrated in a Framework Model 17

2.4 An assessment of the methodology 18 2.5 Summary 20

3. China 21 3.1 Introduction 21

3.1.1 Geo-political background 21 3.1.2 China and GHG emissions 22 3.1.3 China’s environment 24 3.1.4 The Legal and organisational framework 24

3.2 Electricity supply 31 3.2.1 Introduction 31 3.2.2 Policy 31 3.2.3 Key Issues 36

3.3 Electricity demand 39 3.3.1 Demand 39 3.3.2 Policy 39 3.3.3 Key Issues 40

3.4 Rural issues 42 3.5 Future policy options 42

3.5.1 Economic reform 43 3.5.2 Reforms in the electricity sector 43 3.5.3 Energy efficiency policy 45 3.5.4 Renewable energy 45 3.5.5 Electricity pricing 46

3.6 Analysis: First round of institutional policy options 47 3.6.1 The Pre-1990 period 47 3.6.2 Transition solutions 48 3.6.3 New problems 49 3.6.4 Policy Options 50

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (3)

iv

3.7 Conclusions 53

4. India: The Institutional and Organisational Context 55 4.1 Geo-political background and relation to greenhouse gas emissions 55 4.2 Electricity supply 56

4.2.1 Resources 56 4.2.2 Institutions 57 4.2.3 Key issues 65 4.2.4 Privatisation and foreign companies 69

4.3 Electricity demand 73 4.3.1 Introduction 73 4.3.2 Households and Lighting 81 4.3.3 Water pumps for Irrigation 82 4.3.4 Co-generation 83 4.3.5 Motors and drives 86 4.3.6 Analysis 86

4.4 Rural Issues 87 4.5 Analysis: First round of institutional policy options 90 4.6 Summary 94

5. Business-as-Usual Scenario 95 5.1 Introduction 95 5.2 Business-as-Usual scenario: total energy use in China and India 96

5.2.1 Introduction 96 5.3 Socio-economic developments 98

5.3.1 Population 98 5.3.2 Gross Domestic Product 99 5.3.3 Regional differences 100 5.3.4 Total fuel use in the RAINS-Asia BAU scenario 101 5.3.5 Greenhouse gas emissions 104

5.4 The Business-as-Usual scenario for the power sector 108 5.4.1 Description of the BAU scenario 108 5.4.2 Electricity production in the BAU scenario 110 5.4.3 Emissions of air pollutants in the BAU scenario 111

5.5 Summary 111

6. Technological analysis of end-use energy efficiency 137 6.1 Introduction 137 6.2 Cement Industry 138

6.2.1 Current situation (1990-2000) 138 6.2.2 Technological Options for Energy Conservation 141 6.2.3 Scenarios and Saving Potential up to 2020 145 6.2.4 Overview 146

6.3 Iron and Steel Industry 150 6.3.1 Current situation (1990-2000) 150 6.3.2 Sectoral Energy Consumption 151 6.3.3 Technology options for Energy Conservation 152 6.3.4 Scenarios and Saving Potential up to 2020 157 6.3.5 Overview 158

6.4 Aluminium Industry 161 6.4.1 Current situation (1990-2000) 161

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (4)

v

6.4.2 Technology options for Energy Conservation 163 6.4.3 Scenarios and Saving Potential up to 2020 166 6.4.4 Overview 167

6.5 Domestic Sector: Households, Commerce and Agriculture 171 6.5.1 Current situation (1990-2000) 171 6.5.2 Technology options for Energy Conservation 172 6.5.3 Scenarios and savings potential up to 2020 176 6.5.4 Overview 177

6.6 Irrigation Water Pumps (INDIA only) 178 6.6.1 Current Situation (1990-2000) 178 6.6.2 Technological Energy Conservation options 179 6.6.3 Scenarios and Saving Potential up to 2020 180 6.6.4 Overview 181

6.7 Cogeneration of Heat & Power 181 6.7.1 Current Situation (1990-2000) 181 6.7.2 Maximum potential electricity generation via cogeneration 182 6.7.3 Overview 185

6.8 Motors & Drives 185 6.8.1 Current Situation (1990-2000) 185 6.8.2 Technology options for Energy Conservation 186 6.8.3 Scenarios and Saving Potential up to 2020 188 6.8.4 Overview 189

6.9 Integrated sector analysis of end-use BPT savings potential 189 6.10 Bottlenecks (general barriers) 194 6.11 Conclusions 196

7. Potential Reduction of Emissions by Demand and Supply Side Options in 2020 In China and India 199

7.1 Introduction 199 7.2 China 199

7.2.1 The impact of end-use efficiency improvement (EEI) on electricity supply199 7.2.2 Replacement of coal by renewables (REN) 200 7.2.3 Replacement of coal by natural gas (GAS) 202 7.2.4 Replacement of coal by nuclear power (NUC) 204 7.2.5 Closing small power plants (CSP) 206 7.2.6 Efficiency improvement in power plants (EFF) 207 7.2.7 Increased use of cogeneration (COG) 209 7.2.8 Reducing transmission and distribution losses (T&D) 209 7.2.9 Technologies to reduce sulphur emissions (SR) 210 7.2.10 Overview of options for China 211

7.3 India 212 7.3.1 The impact of end-use efficiency improvement (EEI) on electricity supply212 7.3.2 Replacement of coal by renewables (REN) 212 7.3.3 Replacement of coal by natural gas (GAS) 214 7.3.4 Replacement of coal by nuclear power (NUC) 215 7.3.5 Efficiency improvement in power plants (EFF) 217 7.3.6 Increased use of cogeneration (COG) 219 7.3.7 Reducing transmission and distribution losses (T&D) 220 7.3.8 Technologies to reduce sulphur emissions (SR) 221 7.3.9 Overview of options for India 221

7.4 Summary 222

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (5)

vi

8. Stakeholder Analysis of the Electricity Options for China and India 243 8.1 Introduction 243 8.2 China 243

8.2.1 The process 243 8.2.2 Supply side options 244 8.2.3 End-use efficiency options 250 8.2.4 Institutional Context 254 8.2.5 Analysis for China 258

8.3 India 264 8.3.1 The process 264 8.3.2 Supply side options 266 8.3.3 End-use efficiency options 277 8.3.4 Institutional context 283 8.3.5 Rural issues 288 8.3.6 Analysis of the options for India 289

8.4 Conclusion 296

9. Best Practice Technology Scenarios 303 9.1 Introduction 303 9.2 Description of BPT scenarios 303 9.3 A “Mixed Options” Scenario (BPT1) 304

9.3.1 BPT Options included 304 9.3.2 Emissions in 2020 305

9.4 Other scenarios 306 9.4.1 Options included in the Efficiency Improvement Scenario (BPT2) 306 9.4.2 Options included in the Fuel switch Scenario (BPT3) 306 9.4.3 Options included in the Theoretical Maximum Scenario (BPT4) 307 9.4.4 Emissions in 2020 307

9.5 Discussion and conclusions 308

10. Climate Change and International Instruments 321 10.1 Introduction 321 10.2 China 321

10.2.1 Foreign policy on climate change 321 10.2.2 Analysis of the policy and its domestic foundations 324 10.2.3 Issue-linkages 326 10.2.4 Reaction to the Flexibility Mechanisms 327

10.3 India 329 10.3.1 Foreign policy on climate change 329 10.3.2 Analysis of the policy and its domestic foundations 331 10.3.3 The foreign policy aspects 334 10.3.4 Current perceptions of the flexibility mechanisms and technologies 336

10.4 Analysis in relation to international cooperation 341 10.5 Conclusions 349 10.6 Summary 351

11. An Asian Dilemma: Conclusions and Recommendations 353 11.1 The research question revisited 353 11.2 Conclusions 353 11.3 Epilogue 364

Bibliography and References 367 Abbreviations 388

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (6)

vii

Acknowledgements

The project team thanks the following people for their insights and time in relation to the Asian Dilemma Project. We thank professors Kornelis Blok, Leen Hordijk, and Pier Vel-linga for their advice in relation to this project. We thank T. Schneider, S. Schone, J.A. de Ridder, G.J. Heij, and M. Kok, the active members of our advisory board. We thank the Energy Research Institute (ERI) in China and the TATA Energy Research Institute (TERI) in India, as well as Dr Markus Amann and Dr Janusz Cofala of the International Institute for Applied System Analysis (IIASA) in Austria, for the tremendous support in relation to the parallel EU project Potential for Use of Renewable Sources of Energy in Asia and their Cost-Effectiveness in Air Pollution Abatement and their support in the Asian Dilemma project. We thank the Netherlands National Research Programme on Air Pollution and Global Change for their support in this project. We thank in particular Matthijs Hisschemöller and Ernst Worrell for their intellectual contribution to the con-ception of this project and for their contribution to Chapter 2.

From India, we would like to thank:

Dr T K Bandyopadhyay, Mr P P Bhatnagar, Mr V Srinivas Chary, Prof R P Dahiya, Mr H. V. Dayal, Dr Kalyan Kumar Guin, Prof. Leen Hordijk, Dr Li Junfeng, Dr Naval Kar-rir, Mr Amit Kumar, Ms. Dai Lin, Dr M K Mathur, Mr A K Mittal, Dr Manju Mohan, Dr G K Pandey, Dr T.S. Panwar, Dr D C Parashar, Mr N S Prasad, Dr.P. Sanjeeva Rao, Dr Leena Srivastava, Mr Ajay Dua, Mr Ajit Gupta, Mr R K Narang, and Mr Amitabh Kedia (Participants at the workshop on "Modernising the energy sector in India and China and environmental concerns", Dec. 17-18, 1997 at TERI, New Delhi).

Prosanto Pal, Alok Goyal, Amit Kumar, HV Dayal, M S Bhalla, TC Kandpal, Anjana Das Venkata Raman, Nisha Menon, N H Ravindranath, Somashekhar, P S Nagendra, Rao, V. Ramanarayanan, R. Partha Sarathy, N P Subramanian, Omesh Garga, A K Dembla, Potapragada V R Murthy, S Nand, I.H. Rehman, D.K. Goel, J.J. Bhagat (Inter-viewees who shared their time with Jan-Willem Bode in the periods December 1996 - January 1997, and October 1997 - January 1998)

Mr. Gurmit Singh Palahi, Mr. R.N. Malik, Dr. Timothy Forsyth, Jyoti Prasad Painuly, Raymond Myles, K. Chatterjee, Mr. Ramnik Singh, Dr. Raghbendra Jha, Dr. S.N. Chary, Dr. N. Parthiban, Dr. Abdhesh, Gangwar, Prof. dr. P.S. Ramakrishnan, Mr. R.K.Srivastava, Dr. Ashok J. Gadgil, Seth Dunn, Dr. C.R.Bhattacharjee, Dr. Maithili Iyer, Dr. Bhaskar Natarajan, Dr. V. Bakthavatsalam, M. Ashok Kuman, Shri. K.V. Doshi, Prof. N.C. Saxena, Dr. S.K. Husain, Madhavi Joshi, G.G. Dalal, Dr. Naval Karrir, Charanjit Singh, A.N. Singh, M.K. Sambamorti, and Shri Jagdish Sagar (stakeholders who participated in the internet questionnaire of Michelle Honkanen, 1999). Thanks to Michelle for her support in this project.

Pinaki Ranjan Sen, Mr. Shekhar Singh, Mr. Balaji C. Mouli, Mr. Shoeb Ahmed, Mr. Di-vakar Dev, Mr. Vinay Pande, Mr. R. Parthasarthy, Mr. Ved Mitra, Mr. Dilip Singh, Mr. Anand Shukla, Mr. Ananda Mohan De, Mr. Mahesh Bharadwaj, Mr. Sandeep Aggarwal, Mr. Vinod C. Agarwal, Mr. D.K. Das, Mr. C. Bhatnagar, Ms. Shoma Dutta, Ms. Nisha Menon, Dr. Debashish Bandyopadhyay, B. Ravi Kumar, Mr. Anand M. Gorey, Mr. Vijay Raghavan, Mr. Ramesh Kumar, Mr. Sanjeev S. Ahluwalia, Mr. P.A. Abraham, Dr. Y.K. Alagh, Mr. Sharad Pawar, Mr. S.V.R. Rao, Mr. V.S. Saxena, Mr. Rahul Chetrapal, Mr. Shikhar Jain, Mr. Pradeep Dadhich, Mr. Aditya Trivedi, Mr. D.K. Goel, Mr. A.K. Basu, Mr. S.S. Saha, Mr. Mukul Khanduri, Mr. Subhash R. Sethi, Mr. Dipankar Mukher-

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (7)

viii

jee, Mr. S.T. Nair, Mr. P. Neogi, Mr. M.N. Rao, A.L. Soni, Mr. L.P. Sonkar, Mr. A.K. Asthana, Mr. Bhaskar Natarajan, Mr. K.N. Sinha, Mr. M.E. Madhusudan, Mr. K. Ashok Rao, Mr. P.R. Kumaramangalam, Mr. Sompal Shastri, Mr. Vikram Roy (Interviewees who shared their time with Joyeeta Gupta, March 2000).

We also thank interviewees met in February 2001 Sanjeev S Ahluwalia, K.P. Nyati, Vijai Sharma, A.K. Asthana, R.K. Ghosh, Sonkar, Rahul Kshetrapal, Jhamtani Ramesh, Mr Sompal, Shashi Shekhar, Mr Mukherjee, K.N. Sinha, Kalipada Chatterjee (and Abhi-jit Chatterjee, Kuheli Dutt, Vivek Kumar), S Ramaswamy, KK Chakarvati, MC Luther, Chanakya Chaudhary, Suresh K. Prabhu, J. Vasudevan, (Interviewees who shared their time with Joyeeta Gupta and/or Jaklien Vlasblom in February 2001).

From China, we would like to thank:

Gao Shixian, Han Ming, Geng Zhicheng, Li Bao Shan, Prof. Wang Yanjia, Yuan Gujun, Lui Zi, Song Jian Jun, Prof. Ye Rongsi, Wei Bin, Gao Guangsheng, Xing Zhuang, Prof. Xie Shaoxiong, Zhang Yonggui, Wang Jiacheng, Lui Xiaofeng, Hu Xiulian, Hao Xiao-hui, Chen Su Ning, Jiang Kejun, Sun Cuihua, Zheng Shuang, Zhou Aiming, Dai Lin, Li Wei Zheng, Liu Fuyuan, Hu Runqing, and Yang Hongwei (participants in Asian Di-lemma workshop, May 1999)

Liu Ling, Prof. Jinnan Chen, Prof. Gyangyu Fan, Prof. Li Yuping, Prof. Chen Quinyung, Prof. Zhou Zhiren, Yang Song, Prof. Wang Xuejun, Assistant profesor Zhang Shiquia (Susan), Dr. Chen Wenying, Dr. Zhao Xiusheng, Liu Bin, Su Mingshan, Hu Xiulian, Zheng Shuang, Dr. Yang Hongwei, Gao Shixian, Prof. Xie Shaoxiong, Dr. Wang Jin, Yu Fang, Prof. Li Yavfang, Tian Mang She, Prof. Gong Rengren (interviewees who shared their time with Kees Dorland and Joyeeta Gupta, May 1999).

Prof. Zhou Fenqi, Prof. Li Junfeng, Dr. Amit Kumar, Ge Zhengxiang, Xiao Ging Ren, Wang Fang, Hu Chuan Yu, Lei Tijun, Xie Ze, Tang Chunchao, Bert Jan Heij, Zhu Jun, Chen Heping, Li Jing, Zhu Jun, Li Baoshan, Hang Ming, Xu Zhiqiang, Zhanglianbing, Yang Qing, Yu Xianmin, Han Ming, Lei Shuxuan, Li Jingjing, Wan Zhengxin, Yang Zhirong, Lang Yanwen, Tang Chunchao, Zhang Leping, Guo Jiang, Han Yinghua, Li Jingcheng, Wang Guofu, Wang Shuxiao, Tian Hezong, Wang Qingyi, Zhu Chengzhang, Xiao Gongren, Wang Bancheng, Hu Xiulian, Lei Tijun, Liu Xueyi, Xu Huaqing, Lou Huiying, Hu Chuanyi, Zhai Kejun, Zhang Leping, Hu Runqing, Zhuang Xing, Miao Hong, Zheng Shuang, Yang Ning, and Wei Jigang (participants at the EU and NOP Workshop on the Potential of Emission Reduction of increased use of renewable energy and improvement of the electricity sector: technology & policy options in China and In-dia, Beijing, 9-10 May 2000).

Yinghua Han, Miao Hing, Prof. Xiao Gongren, Guo Jiang, Prof. Zhu Cheng Zhang, Zheng Dong, Prof. Lei Shu-Xuan, Li Lian Gang,Tang Hui, Ren Jiyang, Wu Yejun, Feng Anming, Zhang Xu,Tang Shuiyuan, Gao Huai, Prof. Tian Zhilling, Prof. Shao Daqin Prof. Pan Yun Gang, Zhang Yanhong, Zhueng Xin, Prof. Liu Xueyi, Chen Heping, Mrs Zhang Ruiying, (interviewees that gave time to the project team in May 2000).

Chen Heping, Chen Min, Dai Yande, Dong Lie, Dou Lin Ping, Gan Zi Guang, Guo Ji-ang, Guo Yuan, Jiang Hanhua, Li Lian Gang, Li Shi Ping, Liu Hong, Lin Gan, Liu Zhip-ing, Liu Jingru, Qu Su Hui, Song Shang Ming, Su Minshan, Tang Chunchao, Wang Wanxing, Wang Wen Lai, Xie Ze, Xiao Hui, Xin Dingguo, Xu Huaqing, Yang Fuqiang, Yang Zeshi, Yu Cong, Zhao Yuejin, Zhou Fuqiu, Zhou Dadi (interviewees who shared their time with Jaklien Vlasblom during the field study March-May 2000)

From the US, we would like to thank:

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (8)

ix

Jonathan Sinton, David Fridley, Ernst Worrell, Lynn Price, Lin Jiang and Yang Fuqiang at Lawrence Berkeley National Laboratory; Jeffrey Logan at Pacific Northwest National Laboratory (Washington DC); Joe Loper at Alliance to Save Energy, (Washington DC) (Interviewees who shared their time and documentation with Jaklien Vlasblom during her working trip in November 1999).

We also thank Irma Jurriens, Martijn van Groen, and Shirish Sinha for their case studies on the water pump sector, sugar cogeneration in India and commercialisation of solar energy in India.

We would like to thank the reviewers of this project: Li Junfeng (Energy Research Insti-tute, Beijing), Tata Energy Research Institute (New Delhi), R.K. Ghosh (Federation of Indian Chamber of Commerce and Industry, New Delhi), Jan-Willem Bode (Ecofis, Utrecht), Matthijs Hisschemöller (Institute for Environmental Studies, Amsterdam), Bert-Jan Heij (Netherlands Research Programme on Global Air Pollution and Climate Change, Bilthoven), and Jaap de Ridder (Shell Netherlands, The Hague); and Frédéric Gagnon-Lebrun who has greatly helped with the final editing of this document.

Last but not least, we would like to thank those who participated in our concluding workshop held in May 2001: Erik Arkesteijn, A.K. Goswami, Cor Graveland, Bertjan Heij, K.A. Kannan, S. Schöne, Sjaak Slanina, Pier Vellinga, Chris Westra, H.J. Wijnants and A. Zomers.

Joyeeta Gupta, on behalf of the project team.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (9)

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (10)

xi

Executive Summary

Countries aspiring towards high economic development these days face, on the one hand, the accumulated knowledge of the negative impacts of certain developmental trajectories while, on the other hand, the conflicting information as to whether the alternative and, in general, more expensive, developmental trajectories are more feasible. The ‘mistake optimism’ argument is that avoiding mistakes made by the developed countries in their economic growth process will be cheaper for the developing countries in the long term. According to this argument, “developing countries should not go through the evolutionary process of previous industrialisation, but must rather ‘leap frog’ ahead directly from a state of under-development, through to efficient, environmentally benign technologies” (SWCC 1990). The ‘mistake pessimism’ argument is that ‘leap frogging’ may not always be affordable in the short-term for developing countries, and that those countries that have benefited from the dirty technologies have been able to accumulate wealth precisely by cutting corners. This has helped them to reach the stage of take-off.

Clearly, the vision of leap-frogging ahead is an attractive vision for developing countries like China and India. Some recent experiences are also promising. For example, China appears to have successfully de-coupled energy related greenhouse gas emissions from its national gross development product (Zhang 1999: 55). There are also indications that if the efficiency of generation, transmission, distribution and end-use can be improved, the electricity generated could lead to higher industrial output at lower environmental pollution. China has thus already taken many measures to increase national productivity while reducing the environmental pressure. In a similar vein, recent measures taken in the electricity sector in India have also led to reduced emissions. Although this all sounds very promising, continuing to de-couple emissions from economic growth will remain a critical challenge for China and India, as it is for many of the industrialised countries.

Against this background, this research explores the dilemma for China and India in relation to the electricity problem. It argues that the option for these two countries is to either adopt a ‘business-as-usual’ approach or to adopt approaches ranging from alternative development to industrial transformation. These options are not easy choices. At the specific level of electricity generation, the emission reduction options are certainly not easy given that the choice between nuclear energy, large hydro and coal-fired plants appear to be choices that are reminiscent of the proverb ‘between the devil and the deep-blue sea’. The alternative energy choices exist, but the critical issue is to what extent they can reliably and affordably meet the demands of two such giant countries. At the specific level of electricity consumption, a key dilemma is that while on the one hand there are several socio-economic reasons to support small-scale production units, these units tend to be relatively inefficient, have lower quality products and have higher greenhouse gas emissions per unit of production. In relation to technology cooperation, there are occasions where although foreign technologies could help to increase the efficiency of the plants, they are not economically viable. At the same time, there are opposite occasions where despite the availability of local good quality resources and appropriate technologies, technologies are imported. Given that international pressure to take action to reduce greenhouse gas emissions is gradually increasing, these countries will need to consider whether they will adopt a defensive or a constructive, proactive role in the international climate change negotiations and in

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (11)

xii

domestic climate change and energy policy. Thus, the overall goal of this project is to analyse the feasibility of policy options to modernise the electricity sector in China and India and to stimulate the use of such policy options by the relevant agencies. This will be done through an integrated approach. The research question is: What are the feasible policy and technology options to modernise the electricity sector in China and India taking into account the supply and demand for electricity and given the conflict between the need for economic growth and the need to anticipate future developments in relation to the reduction of greenhouse gas emissions?

This project investigates the way in which the demand and supply side of the electricity sector in China and India might develop. It identifies the potential for using technologies to modernise electricity generation and end-use sectors. Ultimately the project identifies themes in which technology co-operation between developed and developing countries can be most fruitful. The underlying philosophy is that such co-operation will be best undertaken on the basis of the perceived needs of the key decision makers and stake-holders in the developing countries.

Chapter 2 of this report describes our research methodology. The integrated methodol-ogy used in this research is necessary in order to study the multi-disciplinary and com-plicated issue of the potential of emission reduction in China and India. The project es-sentially integrates three methodological approaches, a scenario approach, a bottom-up technology approach and an institutional cum stakeholder approach. These approaches were combined in an integrated research framework as shown in Figure 1. Following an initial appraisal of the ‘business-as-usual’ scenario for the electricity sector for both countries, a range of policy and technology options was identified, as well as their poten-tial and technical, economic and political feasibility. These options were combined and compared to the business-as-usual scenario to develop emission reduction scenarios for China and India and were tested with stakeholders to identify their feasibility and to as-sess the potential of using instruments at national and international level to facilitate their implementation.

Chapter 3 analyses the institutional context in China. It concluded that the organisational and institutional frameworks relevant for the electricity sector are in a state of structural reform though based on short-term perspectives. The organisations are still only partly decentralised and there is strong bureaucratic inertia, large vested interests and a lack of information and communication. It showed that a large number of policies have been de-veloped to make the supply and demand sectors more efficient. However, although many policies have been developed the administrative rules, the financial climate and the lack of financial resources stand in the way of large investments. The reforms towards a mar-ket economy and the need to deal with local air pollution problems are a driving force for energy efficiency improvements. However, the current oversupply in many of the sectors and the non-rational electricity prices prohibits large private investments in en-ergy efficiency improvements, which depend heavily on foreign investments. There are only a few foreign investors that want to invest in China under the current setting. Fi-nally, it argues that local governments do not always support the national government policy and are not strong enforcers of such policy. They are afraid of the resulting em-ployment and social unrest as a result of, for example, closing small, inefficient plants.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (12)

xiii

Problem description,research questions

Problem description,research questions

Literature survey ofcurrent situation andBAU developments

Inventory of technical and policy options

Interviews and workshops

Rains Asiamodel:BAU

scenario

Selection of options

Field work, interviews, workshop, lit. survey

Selection of options

Field work, interviews, workshop, lit. survey

Technical assessmentdemand side

Technical assessmentsupply side

Best Practice Technology Scenario development

Win-win policy options

Reviews andworkshops

Integrated assessment

Figure 1. The integrated research framework based on the three methodological approaches (Chapter 2).

Chapter 4 analyses the institutional context in India and concludes that the organisational, institutional, legal, policy and market framework relevant for the electricity sector is in a state of structural change. At the same time, the changes are being resisted by the people whose livelihoods are affected and are being hampered by the constantly changing governments in power in the last decade. This change amidst the continuity makes it difficult to predict how soon or fast actual change will be visible in the sector. It also shows that a large number of measures have been taken in the energy supply side to rationalise the sector, to make it more cost-effective and efficient, which will help to reduce the greenhouse gas emissions per unit of generation since 1990. These measures include new laws such as the Coal Beneficiation Rules in 1996, the amendments to the Indian Electricity Act, the establishment of the Electricity Regulatory Commissions Ordinance, the Electricity 2000 Bill, the Renewable Energy Bill, policy

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (13)

xiv

measures like the liberalisation of generation and distribution, the unbundling of the State Electricity Boards and the liberalisation of the investment rules and banking regulations. The decision to connect the regional grids will also lead to improvements in efficiency of electricity use. There are also a number of measures in the end-use sectors which include the liberalisation of the cement, aluminium and iron and steel sectors, the de-licensing rules, the modified pricing policy, the establishment of management information systems, conservation and environmental guidelines, the possible adoption of the Energy Conservation Bill, and the promotion of cogeneration. This indicates major structural upheaval in the consuming sector. The increasing desire of large scale industry to conform to ISO standards and the pressure from the consumers means that in this sector too the efficiency of electricity use is being actively promoted and this will have an impact on greenhouse gas emissions. The chapter also presented some of the key concerns in rural electrification and argued that although non-grid renewable electricity may be competitive in remote rural areas it may not be affordable. The development of the rural areas may lead to an inevitable increase in electricity: the challenge is to find affordable ways of developing an environmentally and economically viable source of electricity. The driving force for efficiency improvements in India is the process of liberalisation and the need to take local and regional pollutants into account.

Chapter 5 investigates Business-as-Usual (BAU) trends in electricity use and associated emissions of air pollutants. To this end, it uses the RAINS-Asia 2000 BAU scenario (Boudri et al. 2000a; TERI et al. 1999), and interprets its data in such a way that the sce-nario can be used as a starting point for the analysis of options to reduce greenhouse gases. From our analysis of the BAU scenario for the period 1990-2020, we can draw the following conclusions. For China, the BAU scenario assumes a 30% growth of popula-tion and a 7.5-fold increase in GDP, while total primary energy demand is expected to increase by 125%. As a result of this energy-related emissions of CO2 are by 2020 calcu-lated to be more than twice the 1990 level. Emissions from the power sector contribute by about 30% to total greenhouse gas emissions. The total greenhouse gas emissions from electricity production are calculated to increase from 510 Mton CO2-equivalents in 1990 to 1554 Mton CO2-equivalents in 2020. More than 90% of these emissions are CO2 emissions, while CH4 and N2O contribute less than 10%. Emissions of greenhouse gases from the power sector increase by a factor of three, while total electricity production in-creases by a factor of five, illustrating that total emissions per unit of electricity are ex-pected to decrease considerably over time.

For India, the BAU scenario assumes a more than 50% growth of population and a 5.8-fold increase in GDP, while total primary energy demand is expected to increase by 150%. As a result of this, energy-related emissions of CO2 are calculated to be more than three times the 1990 level by 2020. Emissions from the power sector contribute by about 40% to total greenhouse gas emissions. The total greenhouse gas emissions from electricity production are calculated to increase from 256 Mton CO2-equivalents to 978 Mton CO2-equivalents. Like for China, more than 90% of these emissions are CO2 emissions, while CH4 and N2O contribute less than 10%. Emissions of greenhouse gases from the power sector increase by a factor of four between 1990 and 2020, while total electricity production increases by a factor of five, illustrating that total emissions per unit of electricity are expected to decrease considerably over time.

Chapter 6 examines the Best Practice Technology options in the end-use sectors. In the end-use energy efficiency study, we saw that many technical options exist in various demand sectors. Generally, it is important to close down plants with old technologies, or retrofit them if closure is not possible for institutional reasons, to use the newest technologies when capacity addition or new construction takes place, to increase the use

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (14)

xv

of energy efficient lighting and appliances and, to improve electrical motors/pumps and increase the share of cogeneration in the cross-cutting sectors. To a limited extent, these options are expected to be adopted under the BAU scenario, since both China and India have shown significant progress in the period before 2000. Maximum potential energy savings on top of the BAU scenario are around 30% for 2020 for both countries. Various barriers to implementation exist, such as financial, institutional (including knowledge and technology availability), and geographical bottlenecks (see Chapter and 8).

Chapter 7 analyses the potential effect of a number of strategies to reduce emissions of greenhouse gases (CO2, CH4 and N2O) and sulphur dioxide from the power sector in China and India (see Table 1). From our analysis we may draw the following conclusions with respect to emissions of greenhouse gases. For China, we calculated that the options analysed may reduce 2020 emissions of air pollutants relative to the BAU scenario between 1 and 43%. The options that have the largest potential in reducing emissions include end-use efficiency improvement (43% lower than BAU), replacement of coal by renewables (23%) and natural gas (11%). Reducing electricity losses during transmission and distribution would reduce emissions by 7% and efficiency improvement of power plants by 9%. Closing small power plants has a small effect on emissions (1%), as does replacement of coal by nuclear power (2%). For increased cogeneration we calculate an emission reduction of 2%, but it should be noted that this estimate may underestimate the total potential for cogeneration, as discussed in Chapter 6. For India, the reduction options are calculated to reduce emissions in 2020 relative to the BAU scenario by 4 to 45% for greenhouse gases. The options with relatively large emission reduction potentials include end-use efficiency improvement (45% lower than BAU), replacement of coal by renewables (14%) and natural gas (14%) and efficiency improvement of power plants (9%). Emission reductions are also calculated for improved transmission and distribution of electricity (6%), and replacing coal by nuclear power (6%). Increased cogeneration is calculated to have a moderate effects on emissions from the electricity sector (4%) but it should be noted that this estimate may underestimate the total potential for cogeneration, as discussed in Chapter 6.

Table 1. The potential to reduce emissions CO2, CH4 and N2O (GHG) and SO2 from the power sec-tor in China and India in 2020, by selected Best Practice Technology options relative to the Business-as-Usual scenario.

Reduction in 2020 GHG emis-sions (% relative to BAU)

Best Practice Technology Option

China India End-use efficiency improvement (EEI) in - cement, iron & steel, aluminium industry 4 3 - other industrial sectors 25 14 - residential sector 8 12 - commerce 5 11 - agriculture 1 5 Total EEI 43 45 Replacement of coal by renewables (REN) 23 14 Replacement of coal by natural gas (GAS low, no cogen) 11 14 Replacement of coal by nuclear power (NUC) 2 6 Closing Small power plants (CSP) 1 - Efficiency improvement in power plants (EFF) 9 9 Increased use of cogeneration (COG-coal) 2 4 Reduction of losses during transmission and distribution (T&D) 7 6 [Note that the effects of the various options cannot be added in a straightforward way.]

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (15)

xvi

The options that have the largest technical potential to reduce emissions, are not neces-sarily viewed by stakeholders as the most promising options for modernising the electricity sector, as discussed in Chapter 8. Chapter 8 concludes that there is no shortage of ideas and policies to deal with the issue of energy policy and efficiency. However, there is lack of public support for these ideas (because it is not solicited in China), and there is an institutional inertia that makes it difficult for governments and society to adapt to the changing circ*mstances. Table 2 and 3 identify the political and economic feasibility of institutional and technological options for slowing the rate of growth of greenhouse gas emissions for China and India respectively. These are based on interviews and workshops with stakeholders (see Acknowledgements for details).

Table 2. Identifying the political and economic feasibility of technological and other options to re-duce the rate of growth of greenhouse gas emissions: China.

Options Barriers Existing support Policies to improve feasibility of the option

1. Rationalise pricing - System of cross subsidies;

- Variable tariffs for different sectors;

- High prices for ru-ral households;

- Industry, commerce will support such changes because it may reduce costs and increase profits for them;

- Domestic political will;

- Support from inter-national commu-nity;

- Article 2 of the Kyoto Protocol;

- Support for rational pricing combined with price support/ ration system for the poorest sectors of society;

2. Improve legitimacy of decision-making and reduce the implementa-tion deficit

- The government decentralises and centralises out of the angst of losing control, this does not make the role of centre and state clear; this com-pounds the problem of institutional iner-tia;

- The stakeholders and provinces are not actively in-volved in the deci-sion-making proc-ess; but as China liberalises the sup-port of these stake-holders is necessary for policy and law implementation;

- Vested interests want large fossil-fuel, nuclear and hydro projects; but there may be latent social opposition

- In principle the Government wants a peaceful transition and does not want to shake society by sudden changes;

- Government wants large projects and no retrofitting espe-cially because cur-rent electricity sup-ply is higher than demand; large pro-jects can be con-trolled or directed by the state;

- To develop a step-by-step approach to decentralisation in which good rela-tions between the centre and state are fostered;

- To develop a step-by step approach to involve stake-holders and prov-inces so that tailor-made, not uniform policies for differ-ent regions can be made;

- To develop a step-by-step approach to monitor and enforce legislation;

- To translate this into guidelines for CDM projects in electricity;

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (16)

xvii

Options Barriers Existing support Policies to improve feasibility of the option

3. Improving the transi-tion from state owned to corporatised bodies and privatisation

- The bulk of the electricity produc-ers and distributors and large end-users were state entities; the transition to pri-vatisation is proving difficult;

- The process of de-veloping power purchase agree-ments not well de-veloped;

- The domestic pri-vate sector is still in a nascent stage and has to learn the rules of privatisa-tion;

- The government is also trying to find a peaceful and grad-ual method to en-courage privatisa-tion;

- Companies do not have much equity, so securing loans is difficult especially as the financial market is also try-ing to liberalise;

- Government sup-port for privatisa-tion;

- Growing awareness of the risks of fast privatisation;

- Awareness of risks of increasing unem-ployment as a result of privatisation;

- Separate generators from distributors ;

- Create power ‘pur-chasing pools’ and support existing ex-periments in the field;

- Develop a frame-work for the priva-tisation process on the basis of the ex-isting challenges faced;

- Reduce the red tape and the need for many licenses (sim-plified investment procedures), instead encourage transpar-ency and the public and press can moni-tor developments;

- Make simple rules for loans to starting companies

4. End-use efficiency improvement (EEI) a. Cement b. Iron and steel c. Aluminium d. Households and

commercial equipment;

e. Motors and drives

4. a. Inadequate informa-

tion and high cost of technology and inputs for small-scale industry; resistance to closure from small industry;

b. capital shortage; dip in international market; lack of scrap; institutional inertia;

c. lack of resources in small-scale sector; difficulties in cor-poratisation proc-ess;

d. cost of equipment to households and commerce;

e. lack of information and the price of VSD; tendency to

4. a. Technologies avail-

able internationally; and large scale sec-tor supports mod-ernisation; govern-ment policy to close down small produc-ers;

b. Technologies avail-able nationally and internationally; Government sup-port for increasing quality of steel and not quantity; clo-sure of small plants;

c. Government sup-port for closure of small plants;

d. Technologies and products available domestically;

e. -

4 For all options: - rules for participa-

tion in CDM and technology transfer;

- guidelines to sup-port small-scale projects; plants and products via subsi-dies/ GEF/CDM

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (17)

xviii

Options Barriers Existing support Policies to improve feasibility of the option

rewind motors rather than buy new motors

6. Fuel switch (REN, NUC, GAS) a. Large hydro b. Small hydro c. Wind d. Gas e. Nuclear f. Biomass

a. (Latent) social, en-vironmental and seismic risks;

b. Technical difficul-ties;

c. Cost of wind power; difficulty of storing wind en-ergy; difficulties in transmitting from wind rich to wind poor areas;

d. Location of local gas resources; aging gas pipes; distance from demand; costs of generation;

e. Lack of technology and capital; (latent) social and environ-mental risks;

f. Lack of awareness; g. High costs

a. Strong political will;

b. Technical potential c. Large technical po-

tential and political will;

d. International inter-est and willingness to invest in modern technologies;

e. Political will high; low risk perception of social and envi-ronmental risks;

f. Availability of bio-mass and potential

g. Some solar pro-grammes encour-aged

a. Explore options for small hydro in large hydro regions in an-ticipation of major potential social problems in the fu-ture;

b. Develop start subsi-dies for small hy-dro;

c. “ d. Explore opportuni-

ties to replace coal by available gas

e. Explore opportuni-ties (to take into ac-count nuclear waste and risks)

f. Make focused bio-mass policies

For all options: - Develop rules for

inclusion and exclu-sion for GEF/ CDM projects on the basis of above discussion;

g. Develop start sub-sidies for solar.

7. Efficiency Im-provement in coal plants (EFF) a. Existing plants b. New plants (IGCC,

super critical boil-ers)

a. Lack of resources in the few remaining small plants;

b. Joint venture re-strictions and lack of capital; foreign technologies not forthcoming, inap-propriate or expen-sive;

a. Political support for closing small plants; some sup-port for retrofitting large plants as long as supply exceeds demand

b. Political support for efficient coal tech-nologies and IGCC.

- Develop rules for CDM and for exist-ing investments of the World Bank, ADB and make dif-ferent baselines for the two options;

8. Increasing Cogeneration (COG)

- Difficulty in selling to grid, administra-tive inertia;

- Lack of knowledge in some sectors;

- Increasing govern-ment support;

- Simple rules for power purchase agreements;

- Recommendations for CDM/ GEF.

9. Reduction of techni-cal losses in transmis-sion and distribution (T&D)

- Lack of capital; - A number of remote

rural areas to be connected to the grid

- Technologies avail-able in domestic and international market;

- Political willing-ness;

- Recommendations for GEF and tech-nology cooperation;

- Explore non-central grid options;

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (18)

xix

Table 3. Identifying the political and economic feasibility of technological and other options to re-duce the rate of growth of greenhouse gas emissions: India

Options Barriers Existing support Policies to improve feasibility of the option

1. Decrease economic distribution losses (theft): Billing, meter-ing, and collection

- Loss of bribes for the billers, lines-men, metre readers;

- Cost of tamper-proof and/or remote control meters;

- Technology is available;

- Political will is visible;

- Tamper-proof me-ters to profit mak-ing local distribu-tion centres; and/or

- Remote metering in combination with demanding ac-countability from the distribution cen-tres

2. Rationalise power pricing

- social resistance from agriculture and households;

- incentive to in-crease electricity theft;

- populism policy of politicians

- industry, commerce and railways will support such changes because it may reduce costs and increase profits for them;

- support from inter-national commu-nity;

- Article 2 of the Kyoto Protocol;

- Support for rational pricing combined with price support/ ration system for the poorest sectors of society

- Convince agricul-ture and households that the quality of supply will improve and they will save on voltage stabilis-ers, diesel genera-tors, mechanical failure and loss of income and comfort because of power shortage.

3. Improving economic efficiency in govern-ment spending

- Vested interests want large fossil-fuel and hydro pro-jects;

- Foreign investors want to promote technology transfer on the basis of their interests

- Realisation at Plan-ning Commission and Parliamentary level that it is cheapest to retrofit existing plants and use the savings for state of the art plants;

- Social and political support for renew-ables;

- To translate this into guidelines for CDM projects in electricity;

- To demand trans-parency in making and contracts with large companies;

4. Reducing other bot-tlenecks in investing in energy efficient tech-nologies: improving the financial health of the SEBs, accountability in government, and through corporatisa-tion, privatisation, and other means; cheaper loans;

- The electricity boards and some public sector under-takings were bank-rupt and could not invest in energy ef-ficiency and opera-tion and mainte-nance; it was diffi-cult to evaluate their value when they were priva-tised;

- Loss of employ-

- Political will to-wards privatisation;

- Growing awareness of the risks and challenges of priva-tisation;

- Liberalisation pro-vides incentive for reducing interest rates on loans and investing in energy efficient technolo-gies;

- By developing rules for evaluating a formally bankrupt company and for the bidding process; or send a dedicated team to rebuild the organisation on commercial terms combined with rules of accountability;

- Simplify the power purchase rules but do not go out of the

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (19)

xx

Options Barriers Existing support Policies to improve feasibility of the option

ment for laid off workers;

- Private companies were not interested in low revenue sec-tors (e.g. coal wash-ing; distribution to rural consumers;)

- Private sector wants guarantees that electricity is pur-chased from them and Government does not want to give counter-guarantees.

- Loans and technol-ogy expensive;

- Power purchase agreements diffi-cult, bureaucratic red tape;

way to get the elec-tricity; For exam-ple, wind power in-vestors should in-vest in lines to the grid and not the other way around.

6. End-use efficiency improvement (EEI) a. Cement b. Iron and steel c. Aluminium d. Water pumps e. Households and

commercial equipment;

f. Motors and drives

6. a. Inadequate

information and high cost of technology and inputs for small-scale industry;

b. Current capital shortage; dip in in-ternational market; lack of scrap; insti-tutional inertia; cap-tive generation;

c. “ d. lack of regular tim-

ing and quality of supply; cost of technology; subsidy on electricity;

e. costs of equip-ment; low electric-ity prices and theft

f. lack of incentives in small-scale units and poor quality electricity

6. a. expected economic

growth with in-creasing demand; technologies avail-able and accessible for large-scale sec-tor; motivates sec-tor; small-scale sec-tor facing pressure from market;

b. liberalisation, pri-vatisation, company self-image and ex-port demand;

c. “ d. farmers want qual-

ity power; e. high cost of energy

to commercial sec-tor and industry;

f. -

6. - revisit the policies

for the small-scale sectors and encour-age energy effi-ciency through in-centives;

- rules for participa-tion in CDM and technology transfer;

- guidelines to sup-port small-scale projects; plants and products via subsi-dies/ GEF/CDM/

7. Fuel switch (REN, NUC, GAS) a. Large hydro b. Small hydro c. Wind d. Gas e. Nuclear f. Biomass

a. Social, environ-mental and seismic risks; long gestation time

b. Few entrepreneurs willing to take on this kind of project; lack of political

a. Huge technical po-tential available in North-East India; some political inter-est;

b. Potential in the Hi-malayas;

c. Political support

a. Explore options for small hydro in large hydro regions;

b. Develop start subsi-dies for small hy-dro;

c. Link subsidies to generation not ca-

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (20)

xxi

Options Barriers Existing support Policies to improve feasibility of the option

g. Solar

support c. Subsidies linked to

generation capacity encouraged do-it-yourself people who made mistakes;

d. Limited domestic gas available; high cost of imported gas and limitations be-cause of regional peace politics; is a lock-in technology;

e. Social and envi-ronmental risks; costs high if waste disposal is taken into account; is a lock-in technology;

f. Lack of incentives g. High costs

and investors avail-able;

d. International inter-est and willingness to invest in modern technologies

e. Politicians argue that this may be necessary;

f. Some programmes in place

g. Some programmes encouraged through policy

pacity and then phase out subsidies;

d. Explore opportuni-ties to import re-gionally available gas

e. Examine the safety and waste issue carefully;

f. Increase incentives; g. Develop start subsi-

dies for solar. For all options 7 Develop rules for

inclusion and exclu-sion for GEF/ CDM projects on the basis of above discussion;

8. Efficiency Im-provement in coal plants (EFF) a. Existing plants b. New plants (IGCC,

super critical boil-ers)

a. Lack of resources at the State Electricity Boards and disin-terest in captive power plants;

b. Lack of capital for modern state of the art technologies and lack of investors; poor quality of coal

a. Political support for retrofitting existing plants; see point 3 above; policy on power purchase agreements;

b. Political support for super critical boilers and IGCC.

- Develop rules for CDM and for exist-ing investments of the World Bank, ADB and make dif-ferent baselines for the two options;

9. Increasing Cogene-ration (COG)

- Lack of support through PPAs (see point 5);

- Lack of knowledge in some sectors;

- Lack of payment by distribution sector;

- Increasing govern-ment support;

- Support in sugar sector

- Simple rules for PPA; and regular payments by SEBs;

- Recommendations for CDM/ GEF.

10. Reduction of tech-nical losses in trans-mission and distribu-tion (T&D)

- Lack of investment and loans expen-sive;

- Separate grids

- Technologies avail-able in domestic and international market;

- Political willingness to integrate grids

- Liberalise the bank-ing sector to reduce interest rates (also necessary for other options);

- Recommendations for GEF and tech-nology cooperation.

Table 4 combines information from the previous chapters and the stakeholder views to indicate the (lack of) gap between the technical feasibility of reducing emissions and the priorities of society in reducing emissions.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (21)

xxii

Table 4. Feasibility of options.

Options Technical potential to reduce emis-sions

Stakeholder priority China

Stakeholder priority India

Rationalise pricing Indirectly high, since this helps to yield savings that can be used for reinvesting in energy efficiency

High for govern-ment

High for government, industry and com-merce

Improve legitimacy of de-cision-making and reduce the implementation deficit

Indirect high, by improv-ing the implementation of government policy

High for stake-holders; but to be implemented step by step

Although important, not a key issue from this research

Improving the transition from state owned to corpo-ratised bodies and privati-sation; improving account-ability and the financial health of utilities

Indirect high, by improv-ing accountability and profits and increasing re-sources for investment in energy efficiency

High for govern-ment and industry

High

Decrease distribution losses from theft

Indirect high, by increas-ing the revenues that can be reinvested in energy ef-ficient technologies

N/A High

Improve economic effi-ciency in government spending

Indirect high, by focusing resources in an economic way on electricity sectors

N/A; possibly an important issue; but did not emerge as such

High; hence the need to focus on retrofit-ting

End-use efficiency im-provement (EEI)

Very high Low Low in small scale sectors

Replacement of coal by renewables (REN)

High Large hydro high, other renewables low

Large hydro controversial, other renewables high

Replacement of coal by natural gas (GAS low, no cogen)

High High Low

Replacement of coal by nuclear power (NUC)

Low For government high

Controversial

Closing Small power plants (CSP)

Low For government high

Low

Efficiency improvement in power plants (EFF)

High Low High

Increased use of cogenera-tion (COG-coal)

Low Low Although seen as im-portant, policies are slow

Reduction of losses during transmission and distribu-tion (T&D)

Medium Low High

Note: The technical potential evaluated as high, low, etc. are derived from the quantitative analysis done in Chapter 7.

The above table reveals that:

­ For China, the end-use energy efficiency improvement option, the efficiency im-provement in power plants option and the (technical) losses in transmission and dis-tribution have very high technical potential to reduce emissions. The government may wish to give these options due consideration and see if they cannot be priori-

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (22)

xxiii

tised given their high potential for reducing emissions and their relatively non-controversial nature.

­ For India, energy efficiency improvement in the end-use sector could benefit from greater prioritisation.

­ Since gas is a cleaner source of energy, the government may wish to examine the po-tential of better social relations with its neighbouring countries.

Chapter 9 develops four “Best Practice Technology” scenarios for emissions from the power sector in 2020. These scenarios illustrate the combined technical potential of se-lected options to reduce emissions, and vary in their extent to which possible economic and political limitations are accounted for. From our analysis, we can draw the following conclusions. First, as with many of the developed countries in the world, it is technically possible for China and India to reduce their greenhouse gas emissions very substantially by adopting a highly energy efficient and renewable energy pathway (scenario BPT4). This scenario, however, must be considered unrealistic because it completely ignores the practical, economic and political feasibility of reduction options. Given that most devel-oped countries themselves find such a pathway too expensive for them, it is arguably in-conceivable that China and India could adopt new technologies to the extent typically as-sumed in theoretical maximum emission reduction scenarios. Second, our calculations of three different scenarios (BPT1, BPT 2 and BPT 3) for emissions in the year 2020 indi-cate that there are many different strategies for realising relatively large emissions reduc-tions (to about half the level of the BAU scenario by 2020) for China and India. In each strategy we focus on different combinations of policies and we show that in the medium-term there are several possibilities for achieving emission reductions. Third, one of the most promising combinations of policies is reflected in the Mixed Options Scenario (BPT 1). This scenario includes reduction options that have a relatively large technical potential and are given priority by stakeholders and are in general non-controversial in one or the other country. One of the most promising options is energy efficiency im-provement in the end-use sectors, which is calculated to have a considerable technical potential to reduce emissions (see Chapters 6 and 7) and which appears to get an increas-ing degree of priority in India, but less so in China (see Chapter 8). Fourth, we find that even in scenarios reflecting ambitious assumptions on energy efficiency improvement and fuel switch, a substantial portion of the electricity in China and India in 2020 is gen-erated from coal fired power plants. Feasible options for end-use efficiency improvement combined with feasible fuel switch options may not be sufficient to avoid building new coal-fired plants after the year 2000.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (23)

xxiv

Emissions of CO2, CH4 and N2O from power sector in India in 1990 and 2020

200

400

600

800

1000

1200

1990 BAU BPT1 BPT2 BPT3 BPT4

BPT Scenario

Em

issi

ons

(Tg

CO

2-eq

)

Natural Gas

Nuclear

Other renewables

Large hydro

Bagasse

Oil

Cogeneration

Coal, LPS, >2000

Coal, LPS, <2000

Coal, other, >2000

Coal, other, <2000

Figure 2. Emissions of CO2, CH4 and N2O from the power sector in China and India in 2020. Emis-sions of greenhouse gases (CO2, CH4 and N2O). Results are shown for 1990 and for 2020 for the Business-as-Usual scenario (BAU) and for the Best Practice Technology scenar-ios: BPT1 (“Mixed Options”), BPT2 (“Efficiency Improvement”), BPT3 (“Fuel Switch”) and BPT4 (“Theoretical Maximum”).

Emissions of CO2, CH4 and N2O from power sector in China in 1990 and 2020

200

400

600

800

1000

1200

1400

1600

1800

1990 BAU BPT1 BPT2 BPT3 BPT4

BPT Scenario

Em

issi

ons

(Tg

CO

2-eq

)

Natural Gas

Nuclear

Other renewables

Large hydro

Biomass

Cogeneration

Coal > 200 MW

Coal 125-200 MW

Coal 50-125 MW

Coal < 50 MW

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (24)

xxv

Chapters 10 and 11 examine the perspectives of the two countries in relation to the cli-mate change politics and relations and in particular in relation to the flexible mecha-nisms.

The report concludes that:

­ Climate change is not a critical priority for China and India as it competes with other more urgent issues.

­ As long as the governments do not have a complete statistical picture of their emis-sions and sinks, and until the transition process stabilises, they are unlikely to wish to take on any quantitative commitments under the international climate change regime.

­ However, the measures taken since 1990 are likely to lead to greater electricity effi-ciency and increased investments in renewables, which in turn would result in the reduction of greenhouse gas emissions. This shows that both countries are now de-coupling their emissions from their output. Our study shows that for both countries, in fact, the energy (but not necessarily electricity) consumption per tonne of product in the end-use sectors has reduced significantly between 1990 and 2000. The Busi-ness-as-usual (BAU) (2000) scenarios used in this project are also lower than earlier versions, indicating that the projections made by researchers about the future had to be revised. Although there may be other reasons for these downwards revisions, they are in line with the adoption of these policies. Thus although the countries are un-willing de jure to take on commitments, they are de facto making progress. The driv-ing forces behind such decoupling are liberalization and the increasing pressure to address local pollution.

­ The Business-As-Usual scenario for the electricity sector shows that emissions of greenhouse gases from the power sector in China and India are calculated to increase by a factor of three to four respectively between 1990 and 2020 in the BAU scenario, while total electricity production increases by a factor of five, illustrating that total emissions per unit of electricity are expected to decrease considerably over time.

­ The maximum potential energy savings on top of the energy savings already in-cluded in the BAU scenario is around 30% for the two countries in 2020. This im-plies a reduction in the rate of growth of demand for electricity which means that a total reduction of up to 45% of greenhouse gas and sulphur dioxide emissions rela-tive to the BAU scenario is possible by making maximum use of the possibilities to improve energy efficiency in the end-use sector.

­ We identified a range of options to reduce emissions of greenhouse gases (CO2, CH4 and N2O) and sulphur dioxide from the power sector in China and India. Our analy-sis indicates that the technical potentials of these options to reduce emissions range between 1 and 45% relative to the BAU emissions in 2020. Relatively large emission reductions were calculated for efficiency improvement (both in the end-use and in electricity production sector) and fuel switch to renewables or natural gas.

­ Our analysis of the effect of combinations of reduction technologies in “Best Prac-tice Technology” scenarios indicates the following: (a) The theoretical maximum po-tential to reduce emissions by 2020 is very large, but it is unrealistic to assume that achieving this potential is feasible. The feasibility of ambituous options could, how-ever, increase if the developed countries adopted a transition towards highly efficient and renewable electricity sectors (away from fossil fuels); (b) There are different strategies for China and India that may result in relatively large emission reductions (to about half the 2020 BAU level) that are more feasible than the theoretical maxi-mum potential. Strategies focusing on efficiency improvement may be as effective in reducing emissions as strategies focusing on fuel switch. (c) End-use efficiency im-provement may be one of the most effective ways to reduce emissions in China and

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (25)

xxvi

India. However, mobilising all organised and unorganised sectors can be challeng-ing; (d) We envisaged that part of the electricity in China and India used in 2020 is from coal fired power plants, because feasible options to reduce coal use are not suf-ficient to avoid building of new coal-fired power plants. This may be a reason to in-clude clean coal technologies in climate policy for the coming decades.

­ Although some measures have a high technical potential for reducing greenhouse gas emissions in both countries, these are not seen as particularly feasible by the stake-holders (see Table 4). For example, end-use efficiency has a very high technical emission to reduce emissions but is not given much priority in China and India (es-pecially in the small-scale sector). Efficiency improvement in power plants and in transmission and distribution can also yield results in terms of emission reductions but are not seen as important in China.

­ The implementation of policy options depends to a large extent on foreign invest-ment and help. However, in the last decade both countries have had only partial suc-cess in accessing foreign assistance and investment and foreign companies claim that they have had to cope with bureaucratic problems and political risks. Both countries are also not very satisfied with the extent of technology cooperation offered under the climate change regime. Thus far very few climate change projects have been de-veloped in both countries and the experiences are limited though stakeholders have not been able to formulate conditions for accepting projects.

Strategic Issues:

For the National Governments

The governments of China and India may wish to take the following strategic issues into account, especially if they wish to take a proactive approach in relation to the international climate change negotiations and to the enormous pressure on them to demonstrate their willingness to participate meaningfully in international negotiations.

­ Public relations: First, if they wish to relieve the pressure on themselves, they may want to develop an international public awareness campaign of how much de facto is being undertaken within their countries, and to explain why de jure, it is not a re-sponsible undertaking to accept quantitative commitments during the period of trans-formation.

­ Stakeholder consultation on industrial transformation: Second, if the govern-ments wish to proactively carve out a sustainable development trajectory for them-selves, they may consider engaging in discussions with domestic and foreign experts from ENGOs, business, government and international organisations who are willing to openly discuss, without being dogmatic about ideological concerns, what steps can lead to industrial and institutional transformation that is compatible with financial, economic, ecologic and social gain for the society. This means that at an abstract level, the governments may wish to revisit the modernisation processes in their coun-tries and see if that will lead to the changes needed. Our research shows that there are significant opportunities for modernisation that can yield a number of side-benefits. The best practice technology scenarios indicates that emissions can technically be reduced by more than 50% of the BAU scenario. This calls for more active discus-sion on how feasible these options are and whether the two countries are in a position to leap-frog to modern technologies or not and under what conditions. We have made an attempt at analysing the key bottlenecks and opportunities for each of these options, and broad based social discussions of such options may increase their politi-cal and practical feasibility. Our research concludes that the end-use options are

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (26)

xxvii

for the coming twenty years as important as the supply side options. This im-plies that both governments may need to establish strong, empowered institu-tional structure to provide sector specific policies, standards and incentives to encourage the adoption of appropriate energy efficient technologies. This also implies, that both governments may benefit from engaging in and encouraging the development of scenarios in relation to the supply and demand side for the future and how the countries could develop in relation to different conditions. Such scenarios could be based on visions of sustainable development and the way these countries perceive themselves in the context of the global environment. They could also be the result of back casting from a desirable future to analyse what kinds of steps need to be taken now in order to reach the desirable future.

­ Domestic policy: Third, at a more specific level, our analysis shows that if China and India would like to accelerate development in the electricity sector, they may wish to adopt the following measures: § For China, this includes (a) support for rational pricing system and gradual re-

moval of subsidies coupled with price support for the poorest people; (b) devel-oping a step-by-step approach to decentralisation, involvement of provinces and stakeholders in decision-making to develop tailor made policies for each prov-ince as opposed to uniform policies with a system for monitoring and enforce-ment. In relation to increasing the accountability of generators, transmitors and distributors, this means that the government needs to (c) separate power genera-tors from distributors and make simple rules for power purchase agreements; (d) develop simple rules for companies experimenting with corporatisation and pri-vatisation; and encourage transparency so that the press and public can monitor developments. In relation to fuel-switch, (e) policies to promote short-term start subsidies for small-scale renewables need to be promoted. (f) There is need to examine the natural gas alternative in greater detail but taking into account the long-term technological lock-in aspects. (g) Taking into account the risk issues and the nuclear waste issue, the government may wish to re-examine the feasibil-ity of nuclear power. (h) It may also be important to explore the potential for small hydro in place of large hydro as a way to anticipate and prevent future problems with respect to large hydro. (i) The government may wish to prepare a list of priority areas for technology cooperation. Our research indicates that stakeholders have identified the following technologies as critical in the follow-ing sectors: cement (pre-calciner, preheater cement plants, roller press and roller grinders), iron and steel (improved steel casting), aluminium (pre-baked anodes), motors and drives (large-scale high efficiency motors and drives, variable speed drives), renewables (wind turbines), gas (modern gas technologies), nuclear (safe and advanced technologies),1 biomass (cheap and appropriate biomass gasifica-tion; combined hybrid systems), solar (cells, etc.), efficiency improvement in coal plants (retrofitting technologies, coal gasification, IGCC, super critical boil-ers), cogeneration technologies, transmission and distribution and desulphurisa-tion technologies (technologies for coal washing). A previous list submitted by China to the second Conference of the Parties may wish to take these items into account.

§ For India, the range of policy measures includes: (a) Promotion of tamper-proof/ remote control power metering along with accountable/ profit making local power distribution centres to guarantee collection of accurate electricity dues; (b)

1 This does not mean that this research promotes nuclear technologies; we are merely reflecting

what the stakeholders communicated to us during the interviews.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (27)

xxviii

spport for rational power pricing combined with price support for the poorest in society and subsidies for renewable energy; (c) a public relations campaign to convince agriculture and households that the price increase in power will be ac-companied with better quality of services making voltage stabilisers, inverters, diesel generators, loss of income and comfort a problem of the past. (d) The gov-ernment may wish to make guidelines as to when the privatisation process is really necessary and economically viable such that it does not lead to a devalua-tion of government resources, to a concentration of private projects in lucrative areas leaving government with the non-economically viable areas, and only when it is necessary to improve the functioning of the company. (e) It may also be useful to develop policies to ensure that contracts with large investors in criti-cal areas are subject to public scrutiny so that corruption in contracts is mini-mised. In the area of fuel-switching, (f) the government may wish to further de-velop short-term start subsidies for small renewables (in accordance with the goals set out in the new renewable energy bill); (g) examine the gas alternative in greater detail but taking into account the long-term technological lock-in aspects; (h) take into account the risk issues and the nuclear waste issue in revisiting the feasibility of nuclear power, (i) explore the potential for small hydro in place of large hydro as a way to anticipate and prevent future problems with respect to large hydro.

­ Technologies needed: Fourth, if the governments of China and India wish to access new and modern technologies, they may wish to develop a menu of choices for the projects that need priority in technology transfer accompanied with concessions (GEF/CDM/bilateral aid/ technology transfer at concessional terms). Interviewees and the research indicate that the following technologies could be of use in the fol-lowing sectors: cement (technologies for the small-scale sector), iron and steel (im-proved steel casting, EAF), aluminium, motors and drives (large-scale high effi-ciency motors and variable speed drives), renewables (wind turbines), gas (modern gas technologies), biomass (cheap and appropriate biomass gasification; combined hybrid systems), solar (cells, etc.), efficiency improvement in coal plants (retrofitting technologies, IGCC, super critical boilers; high conversion efficiency technologies; better combustion technologies for high ash content coal), cogeneration technolo-gies, transmission and distribution and desulphurisation technologies (technologies for coal washing).

­ Encouraging foreign investments: Although both countries are already exploring a number of policy options, many of these options may remain merely on paper since the resources are limited. If both countries believe that they need financial support and investment in order to make the transition to a greenhouse friendly world, they can invite foreign investment through a simple legal framework requiring limited li-cense and a foreign investment code that states that contracts will be honoured as long as there is no corruption involved and procedures are followed and a fair system of repatriation of funds. They may wish to protect themselves from foreign invest-ment by (a) examining the foreign debt potential and the capital investment implica-tions for financing foreign imports as a criteria in advance; (b) preparing a national technology cooperation policy so that the technologies bought fit in within the long-term development plans of the country; (c) scrutinising the costs and benefits for host government/investor and allowing public scrutiny of projects, (d) checking the skills needed for operating the technology and whether it is available in the country or is part of the investment package, (e) checking that the projects are compatible with lo-

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (28)

xxix

cal resources and customs and (f) checking the degree of maintenance and operation needed and whether this is possible under the circ*mstances.

­ Low stakeholder priority but high technical feasibility options: If both countries wish to optimise electricity generation and consumption, they may wish to re-examine the following relatively non-controversial options for their high GHG emis-sion reduction potential and also because these options can be relatively cheap. China tends to focus on fuel switch rather than on energy efficiency improvement. However, efficiency improvement may have a large potential to reduce emissions in China. It may be relevant for China to re-consider the importance of the energy effi-ciency improvement in end-use sectors, energy efficiency improvement in existing coal-fired plants and reducing technical losses in transmission and distribution. Our calculations indicate that a combination of these three options for China could poten-tially reduce emission to about 50% of their 2020 BAU level. In India, energy effi-ciency in existing plants and transmission and distribution are presently being given as much political importance as the limited resources permit. There is, however, op-portunity for a much more focused policy on energy efficiency improvement in end-use sectors (notably industry), which may potentially reduce emissions by 45% rela-tive to the BAU level. Some stakeholders seem to focus more on efficiency im-provement than on fuel switch in India, while the latter may potentially reduce emis-sions to a considerable extent. Therefore, exploring fuel switch options including the potential for gas can offer short-term relief to Indian energy policies. The options for importing gas to the mutual satisfaction of India and Bangladesh needs to be more actively explored.

­ Criteria for CDM projects: Stakeholders in both countries indicate that the follow-ing criteria are critical for the acceptance of CDM projects: (a) that the projects are joint ventures and/or allow for indigenisation of the technology over time; (b) that baselines in relation to retrofit projects are actual baselines and for new plants, the best technology available in the country in that sector so that the best and most ap-propriate technologies are sold via CDM; (c) that the projects should be non-commercial; (d) that there should be no new local environmental and social impact; (e) that the project should be appropriate for the context; and (f) that there should be seller or joint seller-buyer liability. To the extent that CDM is permitted for small projects and products that are locally available, the credits should be fixed in relation to each project or product and should be at lower than normal interest rates. CDM could be used to promote any of the technologies listed above. This report thus ad-vises caution in relation to the development of nuclear and coal powered plants within CDM. There are indications that existing technology transfers may be re-named as CDM projects which will not benefit the host country. It makes more sense to use CDM for long-term GHG friendly projects; that do not have negative local side effects. This may also reduce the risk of liability from problems in project im-plementation arising from social unrest.

­ From reactive to proactive negotiating strategy: Finally, if both governments wish to take on a proactive role in the international negotiations, they need to develop concepts and policies for the implementation of the regime. Our research shows that both countries are seriously engaging in structural change and that they are attempting at developing long-term sustainable development policies in the energy sector. A proactive strategy that would state the specific kinds of assistance needed by the countries to make certain energy transitions possible in their countries and in specific time-frames could not only indicate the seriousness of the domestic governments on the issues, but could also put pressure on the developed world to

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (29)

xxx

assist them accordingly. This means a clear identification of the sorts of technologies and financial assistance needed, a clear specification of the criteria and conditions under which the country is willing to participate in the cooperative process, a clear identification of what types of projects need to be supported by the GEF, bilateral help, development bank lending and the CDM, and a series of domestic targets and timetables within which the foreign assistance can be planned so as to have optimal results in the next twelve years. If the ground work done by the Clinton administration in at least India is not followed up by the new Bush regime, there is an opportunity to further develop the ties with the European Union within the framework of the EU-India summit.

Foreign investors may wish to draw insights for themselves from the above strategic is-sues, especially those in relation to technologies needed, the role of foreign investments and criteria for CDM projects. For developed country governments:

First, if the purpose of the developed countries is to encourage China and India to seriously take part in the negotiation (rather than assume that they are not implementing their obligations to avoid taking measures themselves), they could consider taking cognisance of what is actually happening in the countries (i.e. the de facto implementation). They may also wish to understand the reasons for defensive strategies (i.e. the need to avoid de jure quantitative obligations) and the sustainability dilemmas faced by both countries.

Second, we believe that it would make more sense for the developed countries – the USA in particular and for those who implicitly support it - to encourage the development of a menu of options by developing countries from which they could adopt some; and consider the measures taken from 1990 onwards as a meaningful contribution to the climate change discussions. This would make more sense than to try and impose legally binding quantitative restrictions linked to incomplete data on existing emissions and speculations about the future, which would have very little basis for countries in transformation.

Third, if the developed countries would like the developing countries to reduce their greenhouse gas emissions, this inevitably implies that the developed countries too have to adopt drastic measures domestically. This would make the cost of renewable energy cheaper and hence affordable for everybody.

Fourth, if the developed countries would like the developing countries to reduce their emissions substantially, this calls for increased cooperation between countries in terms of technical and financial assistance.

Fifth, we would recommend that developed country governments be careful about what is exported to developing countries and whether this will lock not just the developing country into a technological trajectory, but the world into an emission trajectory. By encouraging industry to participate actively in the regime, it is not ruled out that such industry will wish to please its share holders in the short-term rather than meet the long-term environmental goals. This means that the rules for export need to be clearly devised. Lessons from the Ozone Layer Protection regime have shown that exports of HCFCs, a greenhouse gas, financed by the Global Environment Facility or otherwise, did not serve the cause of the environment or the developing countries, although it did benefit the exporting companies. The adoption of renewable energy in the developing countries is at present less affordable that the adoption of the same path by the developed

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (30)

xxxi

countries. Large-scale adoption of renewable energy in the first world, coupled by restricting the use of the flexible mechanisms to supporting renewable energy and end-use efficiency could set the ball rolling towards a greenhouse friendly world. However, in this the developed countries need to set an example themselves.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (31)

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (32)

1

1. The Asian Dilemma

Author: Joyeeta Gupta2

1.1 Background

The newest scientific data (IPCC 2001) confirms that the climate change problem is a se-rious challenges to humankind, and that the threat of irreversible climate change may bring with it major consequences for all countries. This reconfirms the need for suitable action by all countries. Initially, the international community had decided that the devel-oped countries should lead and reduce their greenhouse gas emissions. However, in re-cent years, many in the developed world argue that this might have very major conse-quences for their domestic economies, while being ineffective environmentally, if the developing countries themselves did not commit themselves to taking some action. In the meanwhile, the developing countries face not only the high risk of climate change given their lower financial and technical ability to respond to such changes; they are also afraid that their opportunities for development may be seriously curtailed. This is especially so, since a major cause of the problem is greenhouse gas emissions; and a major source of greenhouse gas emissions is the use of fossil fuels for generating energy, including elec-tricity.

Against this background, this research explores the dilemma for China and India in relation to the electricity problem. It argues that the two countries may either adopt a ‘business-as-usual’ approach or approaches ranging from alternative development to industrial transformation. These options are not easy choices. At the specific level of electricity generation, the emission reduction options are not easy given that the choice between nuclear energy, large hydro and coal-fired plants are reminiscent of the proverb ‘between the devil and the deep-blue sea’. The alternative energy choices exist, but the critical issue is to what extent these can reliably and affordably meet the demands of two such giant countries. At the specific level of electricity consumption, a key dilemma is that while, on the one hand, there are several socio-economic reasons to support small-scale production units, these units tend to be relatively inefficient, have lower quality products and have higher greenhouse gas emissions per unit of production. In relation to technology cooperation, there are occasions where although foreign technologies could help to increase the efficiency of the plants, they are not economically viable. At the same time, there are opposite occasions when despite the availability of local good quality resources and appropriate technologies, technologies are imported. Given that international pressure to reduce greenhouse gas emissions is gradually increasing, these countries will need to consider whether they will adopt a defensive or a constructive, proactive role in the international climate change negotiations and in domestic climate and energy policy.

The potential environmental consequences of the growth in energy use and of the choices made regarding energy sources raises questions regarding the production and consumption patterns of countries worldwide. Countries aspiring to significantly increase their development face major challenges. They want to “modernise without westernising”; but defining this is not easy. They want development without pollution;

2 With comments from the entire team.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (33)

2

but operationalising this is not easy. They want to generate electricity without emissions; but options appear limited.

Against this background, this book aims to examine the potential up to the year 2020 for modernising the electricity sector in China and India in the context of rapid economic growth in these countries and the challenge of climate change. This chapter will first briefly introduce the climate change problem and the latest scientific developments in the field; and will present a brief history of the climate change negotiations. Against this background, it will explain the dilemma for countries like China and India. This is followed by a description of the research question, focus and a brief introduction to how the book is structured.

1.2 The climate change problem

This brings us to a discussion of the problem of climate change. Scientists fear that the combustion of fossil fuels world wide, among other reasons, is leading to a growing concentration of greenhouse gases such as carbon dioxide (CO2), methane (CH4) and nitrogen oxide (N2O) in the atmosphere. These accumulated gases are absorbing heat and it is expected that this may lead to the problem of climate change and destabilisation of the global climate system (Houghton et al 1996). The recently published report of the Intergovernmental Panel on Climate Change (2001) clearly states that the atmospheric concentrations of CO2 have increased by 31 % since 1750, and such a high level of concentration has not been experienced in the last 420,000 years and perhaps not in the last 20 million years. The concentrations of CH4 have increased by 151% since 1750 and such concentrations have not been exceeded in the last 420,000 years. The concentrations of N20 have gone up by 17% and these have not been exceeded in the last 1000 years. Furthermore, there is evidence to show that in the 20th century average temperatures have risen by 0.6 + 2 degrees centigrade. Records reveal that the 1990s were the warmest decade in 1000 years in the Northern Hemisphere. (For the Southern Hemisphere records are not available). Snow cover worldwide has decreased by 10% since the 1960s and there is evidence to show that the sea level has risen by 0.1 – 0.2 metres during the 20th century. Records show increasing rainfall in the mid and high latitudes of the Northern hemisphere, while a fall in the low latitudes of the Northern Hemisphere with a rise in the frequency and intensity of droughts in parts of Asia and Africa. It is further expected that global temperatures may increase from 1.4-5.8 degrees Centigrade by 2100. At high latitudes rainfall is expected to increase considerably; at low latitudes this may vary from place to place and there is likelihood of greater variability in the monsoons. The sea level rise is expected to be between 0.09 to 0.88 metres by 2100. The report concludes that: “There is new and stronger evidence that most of the warming observed over the last 50 years is attributable to human activities”.

About three-fourths of the CO2 emissions come from fossil fuel burning and the rest from deforestation. More than half of the CH4 emissions come from fossil fuels, cattle, wet rice cultivation and landfills (IPCC 2001). Hence, it is imperative to deal with the sources of these emissions. However, since energy use and food habits are intrinsically linked to human lifestyle and consumption, production and trade patterns and economic and political systems; it may not be adequate to only focus on the problem of technological solutions, but to look beyond to the institutional approaches to dealing with the problem of climate change (see Chapter 2).

Concerns in relation to this problem led to the first world climate conference in 1979, the establishment of the Intergovernmental Panel on Climate Change in 1988, the second World Climate Conference in 1989 and regular scientific conferences since then.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (34)

3

Growing scientific concern led to political negotiations that resulted in the adoption of the United Nations Framework Convention on Climate Change in 1992 (FCCC 1992). The ultimate aim of this Convention is to stabilise the global concentrations of greenhouse gases at a level that would prevent dangerous anthropogenic interference with the climate system. This has implications for all countries. As a first step, the Convention calls on the developed countries to take the lead in reducing emissions of greenhouse gases. The preamble states: “Recognizing that all countries, especially developing countries, need access to resources required to achieve sustainable social and economic development and that, in order for developing countries to progress towards that goal, their energy consumption will need to grow taking into account the possibilities for achieving greater energy efficiency and for controlling greenhouse gas emissions in general, including through the application of new technologies on terms which make such an application economically and socially beneficial.” Other articles in the Convention highlight the need to take the ‘common but differentiated’ responsibilities of countries into account while assigning responsibilities to countries.

In 1997, the Kyoto Protocol on the Framework Convention on Climate Change (KPFCCC 1997) adopted legally binding commitments for the developed countries and they have to reduce their emissions by 5.2% in 2008-2012. In doing so they are permitted to trade emissions and undertake joint implementation projects with other countries with binding emission related commitments, and to undertake Clean Development Mechanism projects in developing countries. Both the Convention and the Protocol call on developing countries to take action to reduce the growth of the emissions of their greenhouse gases. However, Article 4.7 of the FCCC makes action by developing countries dependent on assistance from developed countries.

Under the climate change regime, there are in particular five flexible instruments to facilitate the cooperation between countries. These are the:

­ Global Environment Facility (GEF). The Global Environment Facility was established in 1991 by the World Bank, UNDP and UNEP, following a recommendation of the World Commission on Environment and Development (Brundtland et al. 1987). Its purpose was to provide financial incremental support for environmental projects in developing countries and in the countries with economies in transition (East and Central Europe) in relation to four issue areas including climate change. In 1992, the GEF was named as the operating entity of the financial mechanism in the climate convention (Article 11, Article 21; see Gupta 1995, 1997). The Independent Evaluation of the GEF (GEF 1994) criticised the GEF and several measures were taken since to make GEF projects more relevant to the developing countries. The GEF generally supports capacity building projects and projects that are reproducible in other countries. China and India have benefited substantially from GEF projects.

­ Joint Implementation (JI), Activities Implemented Jointly (AIJ) and the Clean Development Mechanism (CDM): Joint Implementation, a concept not defined, although included in the Climate Change Convention was meant to imply that in return for financial investments in projects in other countries that led to a reduction of greenhouse gas emissions, the investor could credit itself with some of the reductions. This concept was adopted as a pilot project at the first meeting of the Parties to the Convention in 1995 and was referred to as Activities Implemented Jointly (AIJ). As of January 2001, 176 projects have been undertaken worldwide, the bulk of which are in East and central Europe and Central America. In 1997, the developing countries were reluctant to accept the end of the pilot phase and the start of actual crediting, and so Joint Implementation was adopted as a mechanism

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (35)

4

between the developed and east and central European countries (Article 6 of the KPFCCC). In the mean while the developing countries were arguing in favour of a non-compliance fine on developed countries (the Clean Development Fund), which through the negotiations metamorphosed into the Clean Development Mechanism (CDM), which allows developed countries to invest in sustainable development projects in developing countries in return for emission credits. Furthermore, a small proportion of the proceeds of the project were to be reserved for adaptation projects. In fact, the developing countries perhaps got a worse deal than the east and central Europeans because sustainable development is an elusive term, and cooperation between North and South is now taxed making CDM projects more expensive than JI projects. This did not also serve the interests of the vulnerable countries, because if CDM is relatively small, so will the resources raised for them. The developing countries have tried to argue this in the recent negotiations, but there have as yet been no decisions on the issue.

­ Technology Transfer: Part of the reluctance of the developing countries in relation to the JI/AIJ/CDM discussion is because they see that the technology transfer provisions in the convention (Article 4.5) and protocol (Article 10) have not been implemented. They had initially expected that the developed countries would reduce their own emissions and transfer technologies and provide financial assistance. They now argue that instead the developed countries want to reduce their emissions partly via technology transfer and assistance.

­ Emission trading: Another instrument in the protocol is emission trading (Article 17) allowed between countries with quantitative commitments. This allows for efficient reduction of emissions at the lowest costs. This has also annoyed the developing countries because they argue that emission trading has de facto assigned property rights to the atmosphere to the developed countries. The rules and modalities in relation to this instrument have yet to decided.

­ In addition there are the ongoing instrument of cooperation; i.e. Foreign Direct Investment and aid.

Table 1.1 highlights the goals of each of these instruments and compares and contrasts the characteristics of these instruments. Table 1.2 presents the pros and cons of the instruments for developed and developing country governments.

The rules and regulations for the flexibility mechanisms have still to be determined and both countries still have an opportunity to influence these rules.

The initial optimism in the system has been followed by pessimistic realisations that reducing emissions in the developed countries is likely to be very expensive. This has led to a situation in which the United States claims that it is unlikely to ratify the Kyoto Protocol until and unless key developing countries are prepared to take ‘meaningful’ action (Clinton 1997; Albright 1998; Gupta 1998). This has led to increased pressure on the developing countries to state how they are going to participate more effectively in the negotiation process. With Argentina and Kazakhstan indicating that they would be willing to consider adopting serious emission related measures, the pressure has increased on the other developing countries. However, other developing countries argue that it is the responsibility of the developed countries to take action first. This has been used as an excuse for the US to delay ratification. Inevitably this delay has had ramifications with many other developed countries unwilling to ratify the Kyoto Protocol because of the fear of the free-rider effect. However, the European Union (EU) has taken a number of measures in 2000 to try and promote a political atmosphere which will stimulate ratification to ensure that the Protocol will enter into effect by 2002 (Gupta and Ringius 2001). With President George W. Bush taking charge in January 2001, the

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (36)

5

pessimism has increased regarding US ratification and this may have implications for European ratification. This has brought the negotiating process to a partial deadlock although there are many efforts at operationalising the various flexibility mechanisms. The key problem is that as long as there is uncertainty about the entry into force of the Protocol, industry, business and governments are unlikely to push for large-scale climate change measures because the financial risks are high.

Table 1.1. The instruments of cooperation.

Instrument Purpose Some details GEF Incremental funding for

technical assistance and projects on, inter alia, climate change

Mentioned in Art. 11/21 of the FCCC; Total grants between 1991-1998: $610 million; Total projects: 80 energy efficiency and renewable energy projects in 40 countries;

AIJ Pilot phase projects in developing countries and East Europe; no crediting allowed during pilot phase

Decided at the first meeting of the Conference of the Parties to the FCCC in 1995; 176 projects as of 1/1/01 mostly in Central and Eastern Europe and Central America;

JI Mechanism to allow investment in projects in East and Central Europe in return for emission crediting

Mentioned in FCCC in 1992; Started in December 1997; Crediting allowed from 2008; no projects thus far, some AIJ projects may become JI projects; allowed between countries with a total emission allowance; Capacity building projects to facilitate JI begun;

CDM Mechanism to allow investment in developing countries in return for emission crediting

Mentioned in KPFCCC in 1997; Crediting allowed from 2001; Projects must meet sustainable development criteria; Projects must be approved by multilateral body; Part of the proceeds must be reserved to finance adaptation projects and administrative costs;

Technology transfer

Mechanism to allow for technology transfer; but no quantitative or specific targets

Mentioned in Article 4.5 of FCCC and Art 10 of KPFCCC. Has not really taken off; problems are that governments are not often owners of technologies; there are difficulties in financing such technology transfer;

ET Mechanism to allow for trading of emission allowances between countries with targets

Mentioned in Article 17 of the KPFCCC, Allowed from 2008 for countries with quantitative commitments;

FDI Existing mechanism of foreign investment in other countries

An existing mechanism for commercial transactions between countries and the amount of resources in FDI is increasing;

Aid Existing mechanism of providing financial support to developing countries

Official development assistance (ODA) from the developed to the developing countries has been on the decline since 1990; though the resources devoted to the environment have increased.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (37)

6

Table 1.2. The advantages and disadvantages of the instruments for parties.

Instruments Investor governments Host (developing country governments) GEF Pros: projects may lead to changes in Bank

policies and developing country policies and lead to higher emission reductions than paid for; Cons: it costs resources and the governments have less control over which technologies (belonging to which countries) are transferred;

Pros: Provides incremental costs of climate change projects; Cons: defining incremental costs problematic, difficult to secure GEF funding;

AIJ Pros: Projects are expected to lead to emission reductions in developing countries; Cons: Industry does not get credits during pilot phase;

Pros: Projects are expected to lead to emission reductions in developing countries; Cons: Not many projects in developing countries and no full evaluation;

CDM Pros: Projects are expected to lead to emission reductions in developing countries in return for credits; Cons: The transaction costs may be high; the adaptation and administrative cost levy may be high;

Pros: Climate change sustainable projects will receive financing; Cons: CDM more expensive than JI and credit giving may be politically and legally problematic; risk in case of project failure;

While it may be understandable that the developing countries blame the developed countries for this deadlock, it is clear that none of the countries worldwide see any easy options before them. The initial optimism in the regime was to some extent linked to the so-called ‘inverted U curve’, i.e. that a permanent de-coupling between greenhouse gas emissions and economic growth is possible after a certain initial development is reached. However, recent research reveals that while the inverted U curve theory holds for single, local air pollutants, there in no compelling evidence that it might hold also in relation to global air pollutants (de Brujn 1998). The fear of loss of economic growth and increasing unemployment have thus become dominant in the European and the U.S. agenda even though at this moment unemployment has reached all time low levels in Europe and the US has enjoyed high economic growth. Ultimately it is those economic and political entities that can identify the way out of this labyrinth that will be able to make economic profits while achieving sustainable development. This is thus, just as much a challenge to the developing countries as it is to the developed countries. But, climate change is not the only motivating factor for re-examining the energy system in countries. The issue of fuel security is becoming increasingly more important for many Western countries, and this is another reason that may motivate changes in policy in these countries (IEA 2000).

This is all the more evident, when discussed in relation to the issue of technology transfer. While developing countries have consistently asked for technology transfer from the developed countries as a way to short-circuit emissions, and while provisions to this effect have been included in several international treaties including the Climate Change Treaties, the developed countries in general are not owners of the technologies and thus are not in a position to actually ‘give’ these technologies (IPCC 2000). Furthermore, it is difficult to identify technologies that are non-controversial in the short-and long-term except in the areas of renewable energy. Nevertheless, there are opportunities explored in this book.

Having said that, development is not experienced hom*ogeneously worldwide. The increase in energy demand is expected to be disproportionately higher in the developed countries and in a handful of developing countries like China and India. China and India

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (38)

7

had a population of 1146 million and 850 in 1990 and this is expected to grow to 1500 and 1297 in 2020 respectively (Boudri et al. 2000a). The fuel input for electricity generation is likely to increase fourfold for China from 7.7 in 1990 to 28.3 (EJ) in 2020. The fuel input for electricity in India may increase five fold from 3.6 to 14.6 EJ in 2020. The related CO2 and SO2 emissions are also likely to increase substantially. For these reasons we have decided to focus on China and India, and we have decided to focus on one specific issue – the production and use of electricity.

1.3 The dilemma for China and India

If we move from the abstract global to the concrete national scale, what does this mean for China and India. Both countries have substantial populations and are on a medium to fast economic growth track. At this point in their development, energy (with electricity as an important component) is a vital causal element of their development. They need large jumps in energy supply to meet the large latent demand (although this is not entirely true for China since there is an industrial recession currently). This brings them to the choice between for example, large hydro (e.g. the Sardar Sarovar dam on the Narmada and the Three Gorges Dam on the Yangze), nuclear and coal-fired thermal power stations. Choosing between the three is not easy since none of these options is environmentally sustainable. This is a complicated issue for these developing countries, especially when one takes into account that the bulk of the large hydro potential in mainland Europe has been utilised, and most of the developed world has benefited from thermal and nuclear power stations. Simultaneously, there is potential for reducing the energy consumption (per unit of product) in order to decrease the need for new power plants. Energy consumption is to some extent high in these countries because of poor housekeeping and maintenance and the processes used are outdated. On the other hand, even though in theory the efficiency of certain production processes can be improved, there are reasons why this is not feasible. Thus, while it is conceivable that an efficient water pump can reduce the amount of energy consumption per gallon of water pumped; if the pump is unable to function in a situation of fluctuating voltages; then the existing pump may be the most efficient under the circ*mstances. Thus, some of the technical potential for improvement may not be easily implemented because of the inter-linkages and context within which the technology operates. At the same time, better technologies generally bring a high price with them, which may be unaffordable for the consumer. Thus the technical feasibility is only part of the story.

This raises the issue of the implications of the global climate change problem for the development paths to be chosen by these two countries and all “late-comers” to development. The dilemma is how to modernise the national economy with less compromises on environmental issues, and how to use imported technologies and lessons without becoming economically and technologically dependent. There are no easy answers to how the energy producing and consuming sectors should develop, although it appears a foregone conclusion that without continuously upgrading the different production and consumption sectors, growth is not possible. At the same time, choosing any one of these options may lead to technological lock-in and countries may get bound up in a technological trajectory the consequences of which they may have to face for several decades.

Countries aspiring towards high economic development these days face, on the one hand, the accumulated knowledge of the negative impacts of certain developmental trajectories while, on the other hand, it is unclear if the alternative and, in general, more expensive, developmental trajectories are more feasible. The ‘mistake optimism’

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (39)

8

argument is that avoiding mistakes made by the developed countries in their economic growth process will be cheaper for the developing countries in the long term. According to this argument, “developing countries should not go through the evolutionary process of previous industrialisation, but must rather ‘leap frog’ ahead directly from a state of under-development, through to efficient, environmentally benign technologies” (SWCC 1990). The ‘mistake pessimism’ argument is that ‘leap frogging’ may not always be affordable in the short-term for developing countries, and that those countries that have benefited from the dirty technologies have been able to accumulate wealth precisely by cutting corners. This has helped them to reach the stage of economic take-off (Gupta 1997).

Clearly, the vision of leap-frogging ahead is an attractive vision for developing countries like China and India. Some recent experiences are also promising. For example, China has successfully decoupled energy related greenhouse gas emissions from its national gross development product. Zhang (1999: 55) argues that “China has cut its energy consumption per unit of consumption in half since 1980. In other words, without these efforts, China’s CO2 emissions in 1997 would have been more than 50% higher than its actual emissions”. There are also indications that if the efficiency of generation, transmission, distribution and end-use can be improved, the electricity generated could lead to higher industrial output at lower environmental pollution. China has thus already taken many measures to increase national productivity while reducing the environmental pressure. In a similar vein, recent measures taken in the electricity sector in India have also led to reduced emissions. However, continuing indefinitely to de-couple emissions from economic growth will remain a critical challenge for China and India. This will also be a challenge for the developed countries; and even begs the question: Are the rich more ‘locked-in’ into technological and economic trajectories than the poor?

Against this background of the increasing global emissions, the (ratification) bottleneck in the international negotiating process and the need and or desire to develop of all countries, the options for China and India appear to be two-fold. They can either insist that the North should lead and that they will follow once the North has demonstrated a commitment to reduce its emissions substantially; or they can argue that there is need for a concerted effort to analyse the problem and to see if there is a way for the “late comers” to join the fore-runners in dealing with the problem. This may call for a strategic combination of using “leap-frog” technology adapted to local circ*mstances and for developing research plans to develop country specific solutions. This book examines some of these issues at a technological, economic and political level to see if it can contribute to the analysis

1.4 The research problem and focus

We have thus far examined the climate change problem, the challenges in the international negotiating process, the specific challenges for China and India and have briefly examined the electricity sector, both from a demand and a supply side. This brings us to the goal of this research project which is to analyse the feasibility of policy and technological options to modernise the electricity sector in China and India and to stimulate the use of such policy options by the relevant agencies. This will be done by developing an integrated approach. In this context, the research question is: what are the feasible policy and technological options to modernise the electricity sector in China and India taking into account the supply and demand for electricity and given the conflict between the need for economic growth and the need to anticipate future developments in relation to the reduction of GHG emissions?

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (40)

9

Let us also emphasise that we are not looking for ways to impose additional conditions on the developing countries. We are instead trying to make an analysis of what these countries actually want, what issue-linkages they make, and what their concerns are. We then examine the technologies that are available and/or used within the electricity sector through a combination of top-down and bottom-up methods and through interactions with stakeholder views in order to ascertain the political, economic and technological feasibility of making improvements to the system either incrementally or through movement to an alternative development trajectory.

As can be clearly seen, although the issue concerns most countries in the world, we have chosen China and India as the area of the research focus of this book. We also focus only on the electricity sector (both in terms of generation and in terms of consumption). We focus on the national level and have occasionally drawn on the experiences at the regional level and the rural level. These limits to the focus are primarily to ensure that the research is manageable, especially given the size of the two countries concerned.

The book is structured as follows. Chapter 2 presents the theoretical and methodological aspects of the research. Chapters 3 and 4 examine and analyse the institutional context of energy and electricity policy in China and India. Chapter 5 presents the business-as-usual scenario for China and India for the period 1990 to 2020. Chapters 6 and 7 examine the demand and supply side technological options for both countries and calculate the potential of emission reduction in different sectors. Chapter 8 analyses the feasibility of these options on the basis of the interviews and workshops. Chapter 9 presents a series of Best Practice Technology Practice Scenarios and also evaluates qualitatively the implications of the feasible options. Chapter 10 examines the domestic concern for climate change in China and India, as well as the domestic policies and perceptions in relation to the flexibility mechanisms. It looks at the potential for using these mechanisms in relation to the feasible options identified in the report. Chapter 11 draws conclusions and makes recommendations.

1.5 Summary

Chapter 1 explores the dilemma for China and India in relation to the electricity problem. It argues that the options for these two countries is to adopt a ‘business-as-usual’ approach or to adopt approaches ranging from alternative development to industrial transformation. These options are not easy choices. At the specific level of electricity generation, the options are certainly not easy given that the choice between nuclear energy, large hydro and coal-fired plants appear to be reminiscent of the proverb ‘between the devil and the deep-blue sea’. The alternative energy choices exist, but the critical issue is to what extent can they reliably and affordably meet the demands of two such giant countries. At the specific level of electricity consumption, choices have to be made between large and small-scale, domestic and imported technologies, closure and retrofit. Given that international pressure to take action to reduce greenhouse gas emissions is gradually increasing, these countries will need to consider whether a defensive or a constructive, proactive role in the international climate change negotiations and in domestic climate change and energy policy. Thus, the overall goal of this book is to develop an integrated approach for analysing the feasibility of policy and technological options to modernise the electricity sector in China and India and to stimulate the use of such policy options by the relevant agencies. The research question is: What are the feasible policy options to modernise the electricity sector in China and India taking into account the supply and demand for electricity and given the conflict between the need for economic growth and the need to anticipate future developments in relation to

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (41)

10

the reduction of greenhouse gas emissions? This chapter also provides a brief introduction to the structure of the rest of the book.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (42)

11

2. Methodology: An Integrated Framework

Authors: Joyeeta Gupta, Carolien Kroeze and Jaklien Vlasblom3

2.1 Introduction

As mentioned in Chapter 1, the research question is: What are the feasible policy and technological options to modernise the electricity sector in China and India taking into account the future development of supply and demand for electricity and given the conflict between the need for economic growth and the need to anticipate future commitments in relation to GHG emissions? This chapter presents the theoretical and methodological aspects of the research developed to address this question.

In order to do so we have developed an integrated assessment approach. In doing so, we have drawn inspiration from the approaches developed within the industrial transformation’ and the ‘institutional dimensions of global change’ research programmes of the International Human Dimensions Programme of Global Change (Section 2.2). We then elaborate on our integrated assessment framework which combines three specific methodologies; namely the scenario approach, the bottom-up technology approach and the institutional and stakeholder approach (see Section 2.3). We then analyse some of the advantages and challenges of using the integrated approach (see Section 2.4).

2.2 Links to International Research Programmes and Approaches

Anthropogenic environmental problems are generally caused by human interactions with nature; this has led to the development of the national and international human dimensions research framework for the social sciences. The natural scientists have long had their own research collaboration forum – the International Geosphere-Biosphere Programme (IGBP). The International Human Dimensions Research Programme (IHDP) is in response to the need for innovative and integrated methodologies for assessing human interactions within existing institutions and for identifying options for improvement. The current international human dimensions programme has five inter-connected dimensions. Two of these focus on ‘Industrial Transformation’ (IHDP-IT) and ‘Institutions’ (IDGEC).

“Industrial Transformation research seeks to understand complex society-environment interactions, identify driving forces for change, and explore development trajectories that have a significantly smaller burden on the environment. It is based on the assumption that important changes in production and consumption systems will be required in order to meet the needs and aspirations of a growing world population while using environmental resources in a sustainable manner” (IHDP-IT 1999). The IHDP programme focuses on energy and material flows, food, cities, information and communication; and governance and transformation processes. The energy programme in particular focuses on the relation between the driving forces, institutional, socio-psychological, and technical arrangements that influence energy policy from the demand and the supply side and the implications for international trade and the United Nations Framework Convention on Climate Change. The research question in our project focuses on a critical research issue of IHDP-IT.

3 Based on work from Christiaan Boudri, Kees Dorland, Matthijs Hisschemöller, Kornelis Blok and Jan-

Willem Bode.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (43)

12

The research method of IHDP-IT focuses on different development stages in corporate and societal response to problems. These can range from reactive to proactive. In reactive approaches, the focus of policy is on end-of pipe changes and the driving philosophy is minimisation of the environmental impacts given the existing system. In receptive approaches, the focus is on the process of production and the aim is to optimise competing goals. In a constructive response, the focus is on modifying the nature of a product within the context of a sector and the underlying philosophy is accelerating change in society. In a proactive approach, the goal is to engage the entire society to modify the system based on a vision of change. In our project we will examine what the potential for modernising the electricity sector is within the context of these four dimensions.

reactive receptive constructive pro-active

End-of-pipe Process Product System

Specialists Managers Sector Society

Minimisation Optimisation Acceleration Vision

B)

A)

D)

C)

A: response phase; B: Focus of attention; C: Main actors; D: driving philosophy

Figure 2.1 Development stages in corporate and societal response (IHDP-IT 1999).

The Institutional Dimensions of Global Environmental Change (IDGEC) focuses on “Institutions” defined as: “systems of rules, decision making procedures and programmes that give rise to social practices, assign role to participants in these practices, and guide interactions among the occupants of the relevant roles”. The programme focuses on analysing the relations between institutions and outcomes (causality and performance) and what this means for the design of institutions in the future. The programme also focuses on the relationship between scale – the national and the global scale. In this research framework we will be using many of the terms, concepts and approaches used within the research framework of IDGEC.

Our research, thus, straddles the objectives of both programmes. It aims to identify the technological potential for modifying existing energy trajectories and the potential for improving and switching to alternative trajectories for both the electricity supply side sectors and the demand side sectors. It further aims to examine the institutional context and the feasibility of such technological options within the countries examined.

2.3 An Integrated Assessment Framework

Integrated Assessment is a modern approach to combining a number of different disciplines and methodologies. One of the definitions of Integrated Assessment is ‘a structured process dealing with complex issues, using knowledge from various scientific disciplines and/or stakeholders, such that integrated insights are made available to decision makers’ (Rotmans 1998: 155). An integrated assessment framework in general tries to combine quantitative and qualitative analysis, and uses a combination of

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (44)

13

analytical methods (integrated assessment modelling, scenarios and risk analysis) and participatory methods (dialogue, interviews, policy exercises with stakeholders and mutual learning). It has emerged as a response to the shortcomings of ‘normal’ science (Kuhn 1962). ‘Normal’ science generally involves a linear approach that adopts certain assumptions, develops certain hypothesis and tests these hypotheses. However, critics argue that such ‘normal’ science tends to be biased in favour of the assumptions, techniques and approaches used by the researcher and may be of limited use. Hence, the public interest science school argues in favour of including the opinions of people concerned and to develop the problem definition, the assumptions and hypotheses in consultation with the stakeholders in relation to the specific problem (Shiva and Bandyopadhyay 1986). The post-normal science school argues that this is especially relevant when the science is uncertain, the values are disputed, the stakes are high and decisions urgent (Functovicz et al. 1996). However, integrating the diverse views of the different stakeholders and the views of the scientists (through a literature survey) within a framework is a challenging exercise. This has led to the development of a variety of integrated assessment methodologies, and we have drawn inspiration from these methodologies to develop one relevant to address the research question at hand.

Our framework combines a top-down approach (the scenario approach), a bottom-up approach (the technology assessment methodology) and the interactive approach (the stakeholder methodology). Before explaining the nature of the integration, we first explain key features of the individual methodologies.

2.3.1 The Scenario approach

“Scenarios are alternative images of how the future might unfold and an appropriate tool with which to analyse how driving forces may influence future emissions outcomes and to assess the associated uncertainties. They assist in climate change analysis, including climate change modelling and the assessment of impacts, adaptation and mitigation. The possibility that any single emissions path will occur as described in scenarios is highly uncertain” (IPCC- 1 2000: 3). In the scenario approach we use an extensive database and model – the RAINS ASIA model to investigate the impact of electricity use on greenhouse gas emissions and acid deposition. The input in RAINS is fuel use for the period 1990-2020 on a regional basis for a number of economic sectors. RAINS also includes socio-economic assumptions and demand scenarios to create, for the purpose of this project, electricity scenarios.

We have used this approach to first develop a business-as-usual scenario for the electricity sector for China and India for the period 1990-2020. This scenario includes policy decisions taken in the period 1990-2000. We then re-use this approach to develop Best Practice Technology Scenarios that combine a range of options to show how electricity generation and end-use pathways can be modified and the implications of such modifications on the atmospheric pollutants, namely the greenhouse gases and acidifying gases. The key advantages of this approach are that it allows one to speculate about possible futures and what measures need to be taken in order to reach those futures; and how these futures differ from expected extrapolations of current trends. The risk of using this approach is that readers and policy-makers may interpret them as realistic pathways of development. In this project, we do not focus on the deposition and ecosystem protection parts of RAINS-Asia.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (45)

14

Figure 2.2 The Rains Asia Model (Foell et al. 1995).

2.3.2 The technological approach

The second tool, the technological bottom-up analytical approach, is used to identify technological options and emission reduction potential in the demand and the supply side. For the demand side, the methodology consists of (a) the selection of core sectors, based on their current and expected future share in national electricity consumption and the relative hom*ogeneity in the processes used; (b) analysis of the structure of the sector (number of actors, ownership, production etc); (c) analysis of the alternative production processes and their share in total production; (d) collection of data regarding electricity consumption per ton of product per production process; (e) collection of information on the most efficient plants globally, with regard to the processes, technologies used and electricity consumption, and comparison with the Chinese and Indian technology level; (f) identification of technological options for efficiency improvement; (g) characterisation of options in terms of applicability (technical criteria for implementation), potential for energy saving (technical potential) and costs (economic potential); (h) and the study of implementation barriers (at the level of individual options

Soil

Damage

Base cation

Weathering

Vegetati

Critical loads

Ecosystem protection

Deposition

Emissions

Transfer matrix

Meteorological

Sulfur dep.

Base

SectRegio

Control strategy

Controlpolicy

Large point sources

Region

Control costs

Fu

Sect

Technolo

Energy scenario

s

RESGEN

FuTechnolo

Power plants

Socio-

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (46)

15

or sectors). In order to prepare each case study, we need the following input as shown in Figure 2.3.

Figure 2.3 Inputs used for the bottom-up technology approach.

Challenges in the bottom-up approach include enormous data requirements in relation to the subsectors, technological options and context specific factors. Such approaches also lead to optimistic conclusions which may not always be justified (Hourcade et al. 2000). On the other hand, this approach provides a causal understanding of the realities in each end-use market, clear insight into the structure of a sector and the possible contribution of technologies towards increasing end-use efficiency.

The results from the bottom-up study have been used to construct an end-use Best Practice Technology Scenario, in combination with extrapolations for sub-sectors that were not studied, to obtain full end-use sector coverage. On the basis of a comparison with the end-use Business-as-Usual Scenario (adapted from Rains 2000 BAU Scenario), the best practice savings potential has been calculated.

In relation to the supply side, the options to reduce emissions of SO2, CO2, CH4 and N2O during electricity production have been analysed and presented. For SO2, several end-of-pipe technologies have been modelled. For CO2, CH4 and N2O options have been investigated, mainly on the basis of a literature research, which includes the technical potential of options to reduce emissions, as well as the additional costs involved. Three options are in particular presented in this report: (a) energy efficiency improvement of new and existing electricity plants, (b) fuel switch (including the use of renewable energy, nuclear and gas) and (c) end-of-pipe technologies to reduce emissions of for example flue gases.

2.3.3 Institutions and stakeholder approaches

The institutions and stakeholder approaches are two approaches focusing on policy, political and legal analyses. The institutions approach analyses the process of policy formation and change within a country. Policy analyses focuses on agenda formation and belief systems of policy-makers and policy-stakeholders including scientists (Lindblom and Cohen 1979; Hisschemöller 1993). Agenda building processes and policy belief

Product Output

Unit Electr. Consumption

Share Processes & Products

Technologies used (which EE?)

Current EE Policies

Product Output

Closing Old Plants EE Techn in New Plants

Share Processes and Products

EE in Existing Plants

Potential EE PoliciesInternational Coop.

1990-1998 1998-2020

1990-2020

500

1000

1500

2000

2500

3000

3500

4000

1985 1990 1995 2000 2005 2010 2015 2020 20250

500

1000

1500

2000

2500

3000

3500

4000

1985 1990 1995 2000 2005 2010 2015 2020 2025

&Policy Options

Product Output

Unit ElectricityConsumption

Share Processes & Products

Technologies used (which EE?)

Current EE Policies

Product Output

Closing Old Plants/ EE Techn in New Plants

Share Processes &Products

EE in Existing Plants

Potential EE PoliciesInternational Coop.

1990-1998 1998-2020

1990-2020

500

1000

1500

2000

2500

3000

3500

4000

1985 1990 1995 2000 2005 2010 2015 2020 20250

500

1000

1500

2000

2500

3000

3500

4000

1985 1990 1995 2000 2005 2010 2015 2020 2025

&Policy Options

500

1000

1500

2000

2500

3000

3500

4000

1985 1990 1995 2000 2005 2010 2015 2020 20250

500

1000

1500

2000

2500

3000

3500

4000

1985 1990 1995 2000 2005 2010 2015 2020 2025

&Policy Options

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (47)

16

systems are analysed with reference to political theories which focus on the various interpretations of democracy, the role of realist, neo-realist, pluralist and other such approaches for studying decision making. The articulation of policy belief systems further clarifies the relationships between causal and normative arguments and the goals and means with respect to electricity policies. Legal analyses clarifies the role of law and the rights and responsibilities of the various institutional stakeholders within the countries. It also contributes to assessing the legality and legitimacy of policy decisions and options for change with regard to the electricity sector. The institutional approach uses the techniques of surveying literature and policy documents for legal analysis, mapping out the major electricity policies, and evaluating policy decisions and options.

The stakeholder approach is used to constantly verify and check the results developed in the process of the institutional (and the scenario and technology) research. The purpose is to first understand how the domestic actors perceive the electricity problem, priorities and policies and what sort of changes they see as necessary. The approach is also used to understand the perceptions of the stakeholder in relation to the problem of climate change and the way the international community is dealing with it and the implications for domestic policy. The perceptions of the stakeholders in terms of linking the electricity issue with climate change and the international mechanisms are then analysed to see if there is a way out of the dilemma sketched in Chapter 1. A study of the issue linkages4 may reveal opportunities for making climate and electricity policy politically more or less attractive to take action in a specific field (Gupta et al. 1993; Gupta and Hisschemöller 1997). The institutional and stakeholder approaches focus on understanding the driving forces, the institutional context in terms of causality, performance and design and in terms of specific issues and policies (see Figure 2.4).

Figure 2.4 The institutional and stakeholder approach.

4 Issue-linkages can serve four purposes: Where the problem of climate change is seen as abstract and remote,

issue linkages can serve to personalise issues, to provide the problem with a ‘face’ so that people can relate to it. Where countries have different interests on the climate change problem, issue linkages may help to lead to a convergence of these different interests. Where countries and actors have diverging perceptions, issue-linkages can be used to identify areas in which side-payments can be made to encourage the participation of the other countries. Where there is a conflict of interest between the countries, issue-linkages serve the function of providing valuable information to understanding the complexities of the issue, and to seeing if the problem definition and context is appropriate to addressing the problem.

Scenario approachScenario approach

Technology approachTechnology approach

Policy scenarios andrecommendations

Policy scenarios andrecommendations

Inst

itutio

nal a

ppro

ach Stakeholder

approach

Basic political,legal and policy

structure

Electricity policies

Demandside policy

Stakeholdersand coalitions

Literature analysis

Climate change

Perception of:

Energy policy

Key issuelinkages

Domesticoptions

Internationalinstruments

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (48)

17

2.3.4 The Approaches Integrated in a Framework Model

In order to integrate the different approaches we have developed a model which has been systematically revised over time (see Figure 2.5) based on intensive interactions between the researchers to allow for cultural exchange and interaction between the different disciplines.

Problem description,research questions

Problem description,research questions

Literature survey ofcurrent situation andBAU developments

Inventory of technical and policy options

Interviews and workshops

Rains Asiamodel:BAU

scenario

Selection of options

Field work, interviews, workshop, lit. survey

Selection of options

Field work, interviews, workshop, lit. survey

Technical assessmentdemand side

Technical assessmentsupply side

Best Practice Technology Scenario development

Win-win policy options

Reviews andworkshops

Integrated assessment

Figure 2.5. An integrated assessment model to assess the electricity sector.

In this model, the first step was to define a research problem and a research question which was in itself based on earlier research regarding the dilemmas faced by developing countries in relation to the climate change problem (see e.g. Gupta 1997, Maya and Gupta 1996, Gupta 2000). The following step was to undertake a detailed literature

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (49)

18

survey in relation to the electricity (demand and supply) sector for both countries and to identify a number of key issue. (see Chapter 3 and 4).

Simultaneously, we performed a scenario analysis on the basis of existing information from the RAINS/ASIA model in order to examine the feasibility of modernising the electricity sector. We analysed the broad macro-level and examined the long term trends along with the implications for greenhouse gas emissions and acid deposition. A business-as-usual scenario for the electricity sector was thus developed (see Chapter 5).

While such macro trends are useful for identifying the areas which need specific attention they are, at best, very general. In order to increase the level of detail we used the ‘bottom-up’ technological approach which examined the technologies in seven demand side sectors and several options for the supply side to identify the technological and economic potential for improving these sectors (see Chapters 6 and 7).

However, the European experience in ‘bottom-up’ methodologies is that they tend to predict an enormous technical emission reduction potential without compromising economic growth, but that an undefined share of the so-called potential is at best theoretical due to institutional implementation barriers (Hourcade et al. 2000). This led us to the adoption of the institutional and stakeholder approach which examines those factors in the institutional context which influence implementation decisions (see Chapter 8). This led us to an analysis of the feasibility of the policy options.

Then we developed scenarios in which we combine different Best Practice Technology options (Chapter 9). Chapter 10 examines the perceptions of China and India on the climate change issue and the potential for linking to the practical options identified in previous chapters.

2.4 An assessment of the methodology

Integrating the different approaches requires not just comprehensive diagrams but an extensive learning process and discipline on the part of the researchers. Although the above presentation may give the impression that we worked in a linear way, in actual fact, we developed an intensive interactive and iterative approach and almost all chapters of this book were born simultaneously, because nothing could be ready till everything was ready. This was very stimulating but also very exhausting since the rules of the integration process have to be constantly discovered and tested.

Further, our attempts at involving stakeholders included a number of different techniques and were practiced by all members of the team in one way or other. These exercises included an initial workshop in New Delhi in December 1997, field work in India in relation to the sectoral bottom-up research in 1998, an internet survey with Indian stakeholders in 1999, semi-structured interviews with stakeholders in March 2000; semi-structured presentations in February 2001 and a review process in March 2001. For China, we had a detailed workshop and interviews in Beijing in 1999, field work in 2000-2001 and another set of interviews and workshop in 2000.

Some of the key challenges faced in the integration process were:

­ The differences in the definitions: For example, in the RAINS Asia approach, demand is set equal to supply, whereas in fact demand is greater than supply in India and demand was less than supply in China in the late 1990s. Finding a way to deal with this was a challenge. Furthermore, it is not clear whether co-generation, and transmission and distribution are part of the demand or the supply side. We have adopted a practical approach.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (50)

19

­ The differences in data and assumptions: A key challenge in the research process was the diverging data that we uncovered through the three methodologies used. The literature used different data, government documents provided different data, IEA reports provided different statistics and so did the interviewees. In the final analysis we have tried to integrate the results by using the data as used by Tata Energy Research Institute in New Delhi and Energy Research Institute in Beijing in relation to the RAINS Asia Model as a starting point and for the rest of the data we have relied to the extent possible on domestic sources of information.

­ Aggregation and disaggregation of data: While the RAINS ASIA model provided aggregate data, disaggregating the data to make it consistent with the bottom-up demand and institutional research was a major challenge. To the extent possible we have tried to use some rules of thumb to deal with this issue. This weakness is a common weakness of most integrated assessment approaches (Rotmans 1998: 164).

­ Different time frames and speculations on the future: In developing scenarios, it is imperative to identify assumptions in relation to the future. Using data from planning documents while authoritative may not be a reflection of how the sector will develop. In fact, if there is one thing that the planning records show in India, is that the plans are never implemented in time and the optimism reflected in the plans are not reflected in the reality of implementation. Furthermore, a key point that emerged from the interviews was that as both countries are in a process of economic (and political in the case of China) transition, and since this implies structural change, it is extremely difficult to extrapolate into the future. We have thus used common sense in developing these scenarios, and these scenarios are at best speculations about the future, not predictions.

­ Identifying the stakeholders and securing and double-checking information: A key challenge in such research is does one identify the stakeholder first or the issue, since this has enormous consequences for the outcome of the research. Identifying stakeholders in India is not a problem and we were able to meet many experts and discuss the issues with them. In China, this is a more challenging task; as the stakeholders outside government are very reserved regarding their position, the majority of the Chinese interviewees were relatively less informed about the details of the climate policy process, but were more informed about the energy policy process. The policy-making procedures in China appear to be very centralised and are concentrated in the hands of a few insiders in the process. Furthermore, China is still in the process of evolving into a democracy and there are not many who are openly critical of the system. An interviewee explained that “One needs to distinguish between how prudent people and scholars in particular and how radical people view the issues. Prudent people tend to include scholars, people from the older generation and officials. These people are likely to emphasise that the views of the Government are based on the concerns of the people. Radical people may emphasise the opposite. Sometimes people have two faces. In universities, there is some degree of freedom in the discussion within the classroom, however when we publish in academic journals we have to be prudent, so we tend to be technical and not critical”. 5 However, although human right issues are considered to be extremely sensitive, the environment in contrast is not a politically sensitive issue.6 Environmental issues are more technical. In general environmental issues are covered in the newspapers but not human rights issues. 7 There appears to be a strong

5 Meeting 12, 1999 6 Meeting 12, 1999. 7 Meeting 12, 1999.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (51)

20

tendency to consider the environmental issues as a scientific and technical issue as opposed to a political issue of how environmental problems need to be resolved. Most of the people we met during our meetings were also very cautious; and there were limited discussions during the workshop which took more the form of expert presentations and clarificatory questions. Nevertheless, we were able to identify a mainstream view from the prudent interviewees and a cautious critical approach from some of our more radical interviewees. While the mainstream view was that China had a unitary system,8 the government made policy in the public interest and people should implement these laws,9 there were others who claimed that China can hardly be seen as monolithic,10 and the lack of implementation of environmental policies reflected the lack of general public support. This makes the use of stakeholder approaches more complicated in China and the results may not be entirely robust.

­ Qualitative and quantitative data: We also faced the challenge of integrating qualitative data from the interviews and workshops with the quantitative data emerging from the scenarios in order to develop the feasible scenario. Our solution, thought not perhaps elegant, has been to indicate the maximum technical feasible options in scenarios and then to present the feasible scenarios through a qualitative analysis. This, too, is a common challenge faced in integrated assessments (Rotmans 1998: 164).

However, on the whole, we believe that our combined methodologies have increased the value of the results of the research and that such an approach may be useful for others who wish to conduct similar analyses.

2.5 Summary

This chapter states that the book uses an integrated assessment model which builds on three approaches – a top-down scenario approach, a bottom-up technology approach and an interactive stakeholder and institutional approach. The approaches have been combined in a framework that allowed for systematic evaluation of the key issues. We believe that the combination of the three approaches helps to increase the value of the results for policymakers.

8 Meeting 2, 1999. 9 Meeting 11, 1999. 10 Meeting 1, 1999.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (52)

3. China

Authors: Kees Dorland and Joyeeta Gupta11

3.1 Introduction

This chapter introduces the issues relating to electricity supply and demand in China based on a literature survey and institutional analysis. Chapters 5, 6, and 7 examine business-as-usual scenarios for the Chinese electricity sector and technical options for reducing emissions. Chapter 8 looks at the feasibility of these options while Chapter 9 analyses the feasibility of other low emission scenarios. In Chapter 10, we examine the perceptions and policies of China on the global problem of climate change and the willingness to link electricity policy to climate change policy. The electricity supply has been analysed in more detail than the demand side. More detailed information on the demand side can be found in Chapters 6, 8 and 9.

The introduction first gives a brief geo-political background, introduces the issue of greenhouse gas emissions and other environmental issues, presents the legal and organisational framework of the energy sector and discusses some general economic key issues. In the next two sections the electricity supply and demand sectors are briefly presented and key issues and policy in the sectors are discussed. The fourth section gives some options for policy improvements identified in the literature. Finally the fifth section presents a first round of analysis of institutional policy options.

3.1.1 Geo-political background

Twenty years ago China was among the world’s poorest countries. 80% of the population was living from less than US$ 1 per day and only 1/3 of the adults was literate. However, the economic reforms between 1978 and the present seem to have paid off. Between 1980 and 1995, China’s GDP grew with an average of 9.4% annually. In 1995 China was the world’s eighth largest economy with a GDP of US$ 696 billion. By 1997 GDP had grown to US$ 802 billion with inflation at 2.8%12 . China's income is rising at least twice as quickly as energy use. In other words, China has reduced its energy intensity by 4.5 percent each year over the past two decades. China's achievement is unique in the developing world (Chandler et al. 1998).

The population was 1.1 billion in 1990, which is about 20% of the world’s population. In July 1997, Hong Kong, with a population of some 6 million people, reverted to China. Although China has a large and rapidly growing economy, since the recent economic growth has exceeded population growth, the average standard of living is improving. By 1995 illiteracy had dropped to 18% of the population, consumption had more than doubled and poverty rates declined (12 and OECD 1996a). However, the developments in the coastal and urban areas are much faster than in the rest of the country.

The population growth is slowing down and is expected to drop below 1% after the year 2000. The infant mortality rate is low (38/1,000) and life expectancy high (70 years overall). The main population group consists of the Han Chinese (91.9%) while minority ethnic groups include Zhuang, Manchu, Hui, Miao, Uygur, Yi, Mongolian, Tibetan, 11 With contributions from K. Boutachekourt, C. Kroeze, M. Hisschemöller and J. Vlasblom. 12 http://www.worldbank.org/html/extdr/offrep/eap/china.htm.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (53)

22

Buyi, Korean, and other groups. The total work force is 699 million people of which 60% is employed in agriculture and forestry, 25% in industry and commerce, 5% in construction and mining, 5% in social services, and 5% in other areas. Women comprise over 40% of the labour force, but this excludes the large number of women engaged in agricultural and household work13. The important Chinese industries include textiles, garments, machinery, cement, iron and steel, coal, and oil. The state owns most of the large companies, of which some 40% operate at a loss. Therefore, reforming the organisational structure of these large companies is a policy priority. China has recently announced its policy to speed up the privatisation of many companies (EIA 1998).

The Chinese electricity sector is influenced by the political reforms that have taken place in the past two decades. In 1987 the Communist Party decided to modernise the economy in accordance with plans as described in ‘the four modernisations’ developed by Deng Xiaoping. With these modernisations a programme for political reform, intended to restore the trust of the people in the Party, was envisaged. The agricultural sector, industry, defence, science and technology had to be reformed and modernised. The aim was to increase the GNP and the per capita income by a factor 4 between 1987 and the year 2000.

As Deng Xiaoping came to power also the political structures were reviewed. Deng Xiaoping made the survival of the Party more or less dependent on the success of the ‘four modernisations’. The large-scale experimentation with economic and political reforms was, however, halted by the massacre in 1989. In 1992, Deng Xiaoping declared that the reforms should again be continued. He suggested that experiments with introductions of capitalistic elements should be made provided the social character of the Chinese economy (e.g. the ownership of production goods) was to be maintained. The capitalistic elements included the introduction of market mechanism, market orientation of state companies, a free labour market and stock markets.

These reforms led to a spectacular economic growth of 13% between 1992 and 1994. Deng Xiaoping’s capitalistic politics were even included in the Chinese constitution. From that moment, China aimed at forming a socialistic market economy with a large role given to demand and supply.

In 1993 Deng Xiaoping officially retired and Jiang Zemin was his successor. However, Deng Xiaoping remained the key figure in Chinese politics until his death in 1997. Since 1989 Jiang Zemin is the General Secretary of the CCP. In 1998 the new government announced a further reorganisation of government and to restructure the state companies. However, the economic problems in Asia at that time and the general fear of the government for social unrest have slowed down these reforms and reorganisations.

These continuous reforms and reorganisations in government and the energy sector provide the background in which the options for modernising the electricity supply and demand sectors in China was performed. It is obvious that this has been a very complex process and that there are many uncertainties that could lead to unforeseen changes in the direction of developments.

3.1.2 China and GHG emissions

The CO2 emissions have increased by around 5% annually in all economic sectors in the 80s except in the transport sector where CO2 emissions have not increased significantly 13 http://www.eia.doe.gov/emeu/cabs/china.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (54)

23

in that period. The energy consumption per capita is low due to the low state of development and low access to electricity. The per capita consumption has decreased by 50% since 1970. Nonetheless, the Chinese industrial CO2 emission is the third highest in the world after the US and Russia. These high emissions are mainly due to the high coal dependency of the energy sector.

Van Ham et al. (1996) analysed the CO2 emissions in China by province and sector in detail. A summary of their findings is presented in Table 3.1. They found that total CO2

emissions in China were 5.3 billion tonnes of CO2 in 1994. As the key data was actually 1990 data it can be argued that this could as well be seen as a 1990 emission value. Van Ham et al.(1996) concluded that the key sectors are the electric power sector, the iron and steel industry, the chemical industry, the non-metallic mineral industry, the residential sector, cement manufacturing and biomass burning (especially agricultural waste burning; 5.9%, and residential fuel wood and waste burning; 8.4 and 10.0 % respectively). Note that the figures in Table 4.1 differ from the estimates made in this study since this study focuses on the electricity use in the sectors only while van Ham et al. (1996) include all energy use.

Table 3.1 CO2 emissions from total fuel consumption (including direct fuel consumption from in-dustry) by sources and sectors in China in 1994.

Source/Sector CO2 emission Mton CO2 % of total Fossil fuel combustion 3276 61.3

Transformation sector 1061 19.8 Industrial sector 1445 27.0 Transport sector 115 2.2 Farming, Forestry, Fishery and Water conservation 76 1.4 Residential sector 297 5.6 Othersa 128 2.4

Non-energy use and process emissions 208 3.9 Cement manufacturing 76 1.4 Naphta- and natural gas feedstocks in chemical industry 297 5.6 Lubricants and LPG use 128 2.4

Biomass burning 1432 26.8 Non-fuel use 358 6.7 Fuel use 1073 20.1

Coal fires 430 8.0 Total 5346 100.0 a Commercial and Public Services, others. Based on van Ham et al. (1996).

In a World Bank study, the 1990 CO2 emissions were estimated at 2.5 billion tonnes (Johnson et al. 1996). In this estimate only the emissions from the power sector, industrial boilers, residential coal use and the cement industry are included. Biomass burning is not considered in the analysis as this is assumed to be renewable. However, it is only the case if the biomass is produced sustainable, which can be disputed for a number of reasons. Furthermore, other emission sources were also not included. The total estimate for the sectors analysed is comparable with the estimates for these sectors produced by van Ham et al. (1996).

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (55)

24

Van Ham et al. (1996) also argue that increases of CO2 emission of 10% annually are conceivable. The enormous economic growth is responsible for almost 80% of the increase and the population expansion is responsible for almost 20% of the increase).

3.1.3 China’s environment

As mentioned earlier, the Chinese economy is heavily dependent on coal for fulfilling the enormous demand for energy. This, combined with the poor technology in use and the lack of SO2 and NOx emission control technologies, causes severe local environmental pollution problems in many parts of the country and high CO2 emissions. In most Chinese cities the SO2 air concentration level are well above international standards. Five Chinese cities (Guangzhou, Shanghai, Senyang, Beijing and Xian) are in the top ten of the most polluted cities in the world. (China Energy Databook 1996)

China has achieved a lot in the area of particulate matter (PM) emission control. These emissions from units larger than 6 MW have almost stabilised. The total emission only increased with 4% between 1987 and 1994 while the total installed capacity almost doubled. The average PM removal rate increased from 92% to 95.6% and the number of installed removal equipment increased from 100 to 364 in the same period (Chandler et al. 1998).

The progress with reducing SO2 emissions by using flue gas desulfurisation (FGD) units is still relatively limited. In the past it was thought that this problem could be dealt with by just raising the height of the stack. However, this only increased the acid rain problem (Chandler et al. 1998). Regarding NOx, emission standards still have to be developed in China. However, new units are obliged to have low NOx burning technology (Chandler et al. 1998). By 1987 only 60% of the plants met national standards for emissions to water. The direct emissions of slag and ash directly to rivers and lakes created large environmental pollution. By 1995 these emissions had stopped completely. However, this created a new problem as the utilisation of slag and ashes from thermal plants is still very low (37% in 1994).

A solution to the environmental problems related to the emissions from thermal plants could be by changing the fuel or switching to other power systems. However, these have their own environmental problems as well. For instance, hydropower leads to significant ecosystem damage and in many cases large groups of the population in the area have to migrate. Nuclear power brings operation risks and waste problems. A recent study performed by the World Bank (1997a) estimated the total costs of water and air pollution in China at 8% of its GDP (US $ 50 billion annually).

3.1.4 The Legal and organisational framework

In this section the legal and organisational structure of the Chinese electricity sector is discussed. However, the electricity sector in China cannot be discussed without discussing the energy sector as a whole and the overall political and organisational structure. Hence, a brief description of the political and organisational developments in the past decades is provided here.

3.1.4.1 The Environmental Laws

Following the United Nations Conference on the Human Environment, domestic laws on the environment were developed. A second international stimulus came with the United

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (56)

25

Nations Conference on Environment and Development in 1992 and the domestic political change in 1994 (Qijia 1998). Since 1997, when the new generation of communist leaders took over, there have been some changes (Xi 1997).

Since 1980, China’s central leadership strengthened its environmental legislation when it promulgated the Environmental Protection Law. Many laws, acts and regulations followed. Local environmental protection bureau’s developed their specific laws, which were often more strict than the national laws. In the Basic Law on Environmental Protection it is stipulated that all large - and medium- sized projects must pass Environmental Impact Assessments (EIA) before the project can be approved. In 1989 the Environmental Protection Law was amended. The 1989 version has strengthened the operational authority of environmental protection organisations by offering clear authority for on-site inspection and demanding companies to co-operate (OECD 1996a).

Apart from protection laws, Chinese environmental management relies heavily on the 362 national and industrial environmental standards that were applicable in 1995. If companies fail to meet the standards they are charged a fee for violation of the standards. However, these fees are often far below the marginal costs of abatement technologies that would have to be implemented to meet the standards and thus many firms choose to pay the fees rather than invest in pollution prevention and new technologies. The companies can borrow money for financing abatement technologies at reduced rates from the State, however, awareness of these types of possibilities is low (OECD 1996a).

The environmental legislative framework in the Basic Law on Environmental Protection, is presented in Figure 3.1. There was no legislative framework for the electricity sector in China before the Electric Power Law was introduced in 1996. The electricity sector was ruled by government directives, which were drawn up by many institutions on all levels within the government organisations. Thus, the electricity sector was subjected to more than 500 laws, regulations and administrative directives. There was a lack of co-ordination of the legislative conditions and the directives were at least confusing but sometimes

The lack of a legislative framework also resulted in extensive problems regarding the identification of and obtaining documents with the rules that should be used for the sector. Insight in legislation was obtained through discussions with and speeches from government officials.

The Electric Power Law offers an extensive framework for reform and development of the electricity sector. However, it needs ot be modified further to make it more market oriented. Most of the generation companies are still dependent of State Power. Since there is a large number of electricity production companies, the law stimulates merges in the sector. The law acknowledges a role for foreign investments, including direct investments in power plants trough joint ventures with foreign companies. The foreign investments have to be in line with the national industrial policy and projects mentioned in the ‘Ninth Five Year Program’. Foreign loans, but not foreign investments, are admitted in the development of distribution networks. The Electric Power Law also regulates the development of electricity production and management to guarantee the safety and reliability of the distribution systems. It also protects the juridical rights of investors, managers and consumers.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (57)

Local LawsLocal laws approved by the provincial

and lower-level people's congressto adapt national statutes to local conditions

Local RegulationsIssued by the local-level administrative agencies

Ministrial StandardsInclude measurement procedures, equipment performance, and other technical criteria, such as:

forestry, building materials, metallurgical industry, transportation, rialways, etc.

Local StandardsPrimarily include the setting of geograpjical boundaries for ambient and environmental quality

State StandardsAmbient Standards Emission Standards

RegulationsIssues by National Ministries and bureasus suc as NEPA, such as:

procedures concerning the retention of profits by the Industrial and mining Enterprises for products derived from the recovery of waste materials and other pollution control measures, and; procedures for the management of environmental protection standards

Administrative DecreeRegulations approved by the NPC, such as:

regulations on on strengthening the managemnet of Environmental Protection in Rural and State Enterprises andregulations on Integrated Technical Renovation and Pollution Contyrol in the Industrial Sector

Specialised Laws

Basic Law on Environmental Protection(1979, amended 1989)

State Constitution (1982)

Figure 3.1 Environmental Legislative Framework

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (58)

An Asian Dilemma

To implement all the laws on resource and environmental protection (especially the Air Pollution Control Law and the Energy Conservation law), the State Government enacted 120 administrative regulations, and local authorities enacted over 600 regulations and about 400 national standards were adopted (Xiangcong 1998). The principles guiding the laws include the recognition of the need to develop sustainably; which implies prevention in preference to curative approaches, the study of foreign legislations to draw lessons from them and harmonisation with international laws (Xiangcong 1998).

3.1.4.2 Centre-State Relationship

Despite the political and organisational reforms in China the decision-making process is still very much top-down (e.g. state oriented). The bureaucratic system consists of many layers. At the top there are 25 to 35 leaders followed by several intermediate links and staff-organisations, the State Council Commissions and national and provincial departments that implement policy.

Due to the current economic reforms more autonomy in the policy making process has been given to the provincial level. This is especially the case in the fast growing coastal and southern provinces. With these reforms an attempt at reaching more consensus in the policy making process is made.

China is governed on the basis of formal authoritative structures, which consist of networks of thousands of individuals with mutual obligations. Loyalty plays an important role in these networks. The relation between the state, the townships, the cities and the provinces in 1998 is presented in Figure 3.2. Since 1998 many changes in the Centre-State relationships are taking place.

a There are three large cities directly administered by the state (Beijing, Shanghai and Tianjin) . Thus they have the same position as the provinces.b Eequivalent to provinces in the national minority areas.c Regarded as rural.

Central Cities a(zhixiashi)

Autonomous Regions b(zizhiqu)

Provinces(sheng)

District(qu)

Township c(xiang)

Town c(xhen)

County(xian)

City(shi)

State

Figure 3.2 The structure of China’s government system.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (59)

28

The Chinese decision making process is also influenced by foreign factors. To obtain new capital and technologies Deng Xiaoping extended the ties with industrialised coun-tries in the 80s as a part of the new policy. The urge to heavily invest in modernisation of the energy sector raised concern on the environmental impacts with the industrialised countries. Funding organisations, such as the World Bank, pointed at the importance of environmental measures. New technologies, however, in many cases already are equipped with environmental measurement devices (such as air emission measurement devices). The government’s wish to raise the level of production to international stan-dards in many cases also included the introduction of the high international environ-mental standards (Livernash 1996 p.64).

3.1.4.3 The government bodies

Until 1998 the electricity sector consisted of around 10,000 legal entities, 80,000 electricity production companies and 1,600 distribution companies. All companies are branches of State Power. This large number of organisations increases the co-ordination problems between the production and distribution companies. According to Shiwei et al. (1997: 4), many of the production companies operate as autonomous subsystems, especially in the countryside.

The organisation of the political administrative structure of China has been changing several times over the last decade. The State Council can be seen as the government of China. Below the State Council many Commissions and Ministries operate. These are the departments that develop policy. The Ministries and Commissions steer the Corporations, which can be seen as the utility companies. Many of these utility companies become independent and start defining their own management within the boundary conditions given by the government. The Ministry of Electric Power (MOEP), the Ministry of Coal Industry (MCI), the China National Petroleum Corporation, the China National Offshore Oil Corporation and the China National Petrochemical Corporation dominated the energy sector until 1998.

In 1972 China prepared a statement on environmental policy for the UN Conference on the Human Environment held in Stockholm. This eventually led to the foundation of the National Environmental Protection Agency (NEPA). The NEPA became independent in 1988. IT became a ministry in 2001 and renamed State Energy Protection Agency. SEPA is responsible for all aspects of related to environmental policy and management but has to share its authority with many other organisations.

China has also established the National Clean Production Centre (NCPC) in December 1994. This Centre promotes clean production technologies, conducts industrial pollution audits, provides technical training and international exchange. The Centre serves as a link to Section 3 of Agenda 21. More than 3000 enterprises are identified as heavy polluters by China. They have to bring down emissions within a given timeframe (OECD 1996a).

The People’s Bank of China (PBC) also plays a role in environmental enforcement. The loans and grants for pollution abatement projects are increasing and are distributed by commercial banks, such as ABC, CIB, CB and the National Development Bank. From 1995 onward they demand projects to comply with all applicable environmental laws and regulations (OECD 1996a). With entry into the WTO, China will also open up the banking sector.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (60)

29

In March 1998, the National People’s Congress elected Zhu Rongji as Premier, replacing Li Peng. Just before his election, the legislature approved a major government reform package, which will eliminate or merge 15 of the 40 ministries and abolish 4 million government jobs in three years (a 50% reduction). Under this reorganisation the minis-tries of electric power, petroleum and chemicals are to be transformed into state-owned corporations (EIA 1998). The MOEP and the MCI were abolished and some of the gov-ernment functions were redirected to new bureaux in the State economic and Trade Commission (SETC). However, the ownership, enterprise management regulation and policy formulation continued to be unclear and even seems to have become more com-plex then before14. The energy sector organisations and their specific responsibilities un-til 1998 are shown in Figure 3.3. Since 1998, many changes have occurred and the in-dustrial ministries have been abolished.

14 Energy Policy and Structure in the People’s Republic of China (1998), http://iceu.net/china, 5 February

2001.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (61)

An Asian Dilemma

Figure 3.3 Organisation of the Chinese energy sector until 1998 (Adapted from EIA 1998).

The Ministry of Foreign Trade and Economic Cooperation

China National Local Coal Mines Development Co-operation

China North East and NEI-Mongolia United Coal Co-operation

The Ministry of Foreign Affairs

State Power Corp. was established in 1997 to handle business aspects of the industry, with generation and transmission the responsibility of regional subsidiaries.

The Ministry of Water Resources is concerned with China's hydropower production.

State Council The State Council functions as a government headed by the Premier

The State Planning Commission (SPC) has ultimate au-thority for energy project approval, budget allocations, and financing arrangements. Thus, the SPC has a big in-fluence on energy policy in China. The SPC is also deal-ing with foreign investments.

The State Science and Technology Commission (SSTC) and the State Economic and Trade Commis-sion (SETC) are also involved with energy industry de-velopment and efficiency increase.

Corporations under the State Council The China National Petroleum Corporation (CNPC) is responsible for all onshore upstream oil and gas operations, includ-ing shallow water areas. In the past few years, CNPC has begun the transformation into a multinational integrated oil com-pany, establishing subsidiaries and acquiring overseas acreage and refineries in pursuit of export markets. The China National Offshore Oil Corporation (CNOOC) was established in 1982 to explore China's offshore petroleum re-sources. CNOOC has four regional subsidiaries (Bohai, East China Sea, Nanhai East, and Nanhai West) and several special-ised subsidiaries. China established a third state oil company, China National Star Petroleum Corporation,in January 1997. The company is awaiting central government approval of four proposed exploration ventures with foreign companies. The China National Petrochemical Corporation (Sinopec) is responsible for petroleum processing and product distribution, controlling production facilities for 90 percent of China's refined oil products and over three-quarters of its petrochemicals. The China National Nuclear Corporation (CNNC) is a conglomerate of more than 200 enterprises and institutions con-cerned with China's nuclear power production and waste disposal facilities. The China Institute of Atomic Energy (CIAE)operates under the CNNC and the China Academy of Sciences (CAS). It is a huge multidisciplinary institute with 3800 em-ployees, including 900 senior scientists and senior engineers. It deals with nuclear energy- science and -technology. It is a well-equipped organisation and makes significant progress in R&D. It also uses its authority to influence the civil market. The China Energy Investment Corporation (CNEIC) oversees major investment loans for the energy sector.

The Ministry of Power Industry which regulates power production, is being transformed into a new national power company.

The Ministry of Agriculture

The Ministry of Geology and Mineral Resources

China International Water and Electric Comp. The China National Chemicals Import and Export Corporation (Sinochem) is primarily involved in imports and exports of crude oil, petroleum products, and natural gas.

Unipec (for Sinopec) China Oil (for CNP)

Huaneng Group Inc.

The Ministry of Coal Industry allocates national coal production and coordinates production activities by central-government-controlled mines (about 45 percent of nation-wide production) and "local" mines (collective or private-ownership mines as well as state-owned mines operated at the provincial, prefectural, or county level).

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (62)

An Asian Dilemma

3.2 Electricity supply

3.2.1 Introduction

The power industry is referred to as the centre of energy development. The Chinese electricity sector is the second largest in the world after the US electricity sectors. China’s electric power industry has developed very quickly over the past decade. The gross electricity production installed increased from 2.2 EJ in 1990 to an estimated 4.3 EJ in 2000 (see Chapter 5). Many new power plants were relatively efficient because they were larger, reaching 200 megawatts and higher. However, a large number of smaller, inefficient, plants were also added to quickly meet soaring demand. Most of the country’s 1990 electricity was generated with thermal capacity while about 20% was hydro based and 1% nuclear based. The main share of the thermal capacity was coal based (5.8 PJ primary energy equivalent in 1990, see Chapter5).

Before 1987, China’s electric power supply consisted only of conventional coal-fired, oil-fired, and hydropower plants. The electric power supply mix began to change during the late 1980s. In 1993, the first large-scale pumped storage hydropower station was put into operation. In 1995, hydropower stations with a total capacity of 45 GW were under construction, including the massive 18 GW Three Gorges Dam. Foreign investors have built several relatively small oil- and gas-fired combined cycle units in recent years, primarily along the eastern and southern coast. China also started commercial nuclear power production in 1992. By 1995, China had installed wind power farms, solar photovoltaic, geothermal, and ocean tidal power stations reached 50, 6, 32, and 11 megawatts of capacity, respectively (Chandler et al. 1998; Shiwei et al. 1997). By 2010 it is expected that coal based systems will still account for most of the electricity production in China. It is expected that in 2010 hydro plants will produce about one-fifth of the electricity.

3.2.2 Policy

The electricity sector went through many important organisational changes that are part of the changes of the Chinese socialist market economy. This section gives a brief introduction to the most important policies: economic reform, reforms in the electricity sector, electricity pricing, national investment, energy policy and foreign investment.

3.2.2.1 Economic reform

In the mid-90s a change took place as the country experienced a process of both decay and modernisation of the institutions. Many of the existing political-administrative institutions could not keep up with the reforms initiated in the period that Deng Xiaoping was in power. The reforms were mainly economic but they were based on decentralisation of economic power. This means that the authority of several actors was transferred to other actors. In this decentralised setting the government in Beijing would have less power over the decision-making processes at the provincial level.

Before 1998 a few ministries and companies such as the Ministry of Electric Power dominated China’s energy sector. The sector is now dominated by State Power.

Although there is a gradual trend towards using economic instruments, ‘command and control’ instruments still are very dominant. In the environmental area, some economic instruments have been used, such as national pollution exceedance charge; effluent

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (63)

32

charges, user charges, SO2 charge, ecological destruction compensation, mineral resource compensation, resource taxes, tradable permits, deposits for clean up operations, subsides etc (Jinnan and Xinyuan 1997: 17). Of these the pollution levy system has been used for 16 years and works well.

However, the economic reform also faces problems. The instruments are not always consistent with the shift towards a market economy. E.g. the pay back principle in the pollution levy fund and the loan forgiveness provisions are not consistent with the polluter pays principle. The existing policy instruments do not reflect the true environmental costs, and the existing policies are inconsistent (e.g. enterprises in some cities may pay charges on 11 parameters to 6 government departments, sometimes for overlapping issues) (Jinnan and Xinyuan 1997: 19-20).

3.2.2.2 Reforms in the electricity sector

The four basic problems with the power sector in China were the centralised organisation of the power sector, the direct management of the power sector enterprises by the government, the lack of a transparent legal and regulatory system, and the absence of incentives for efficiency (Shiwei et al. 1997).

The Chinese government has recognised these problems and since 1985 the electricity sector is being reformed. In 1985 the State Council adopted the “Provisional Regulation on Encouraging Fund Raising for Power Construction”. The reforms include the separation of the government from power enterprises, the corporatisation and commercialisation of power enterprises, and the introduction of competition in generation. In this document the wish to admit more private investments from national and foreign sources was made explicit. The aim was to speed up the process of meeting the shortage in electricity supply. Since then the national and foreign investments have grown substantially. This also led to more competition. However, the reforms are more an answer to the acute problems than born from a long-term strategy.

Most reforms were directed towards electricity production so as to tackle the problems with shortage in supply. The reforms were introduced to stimulate investments and a partial rationalisation of the electricity tariffs. Little attention was paid to modernisation of transmission and distribution networks. Also little attention was paid to commercialisation of the different parts of the organisations responsible for delivery of goods and services.

According to Shiwei et al. (1997) there are concerns within the sector that these reforms will fail if the government regulatory system for the sector and enterprises is not reformed. Since 1998 many additional reforms have taken place.

3.2.2.3 Electricity pricing

The electricity price was totally regulated. The State Planning Commission (SPC) was the highest authorised organisation in electricity pricing and in theory they must approve any deviations from the catalogue price, so they are responsible for planning and reform of price adjustments. SPC reports to the State Council (SC) at least once a year after which they can implement plans/reforms approved by the SC. The provincial price bureau’s and the provincial electricity bureau’s implement the plans and reforms in practice. The country catalogue price is set and approved by SPC annually. However, this does not mean that there is a uniform pricing system. The electricity price is derived from the government set basic price and a number of national, provincial and local

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (64)

An Asian Dilemma

33

surcharges (Estrada and Bergesen 1997:19). The catalogue prices take into account local and grid specific factors, such as transportation costs, distribution losses, electricity production costs, fuel costs (coal prices), etc. In 1993 the price differences among the grids were still significant with the lowest prices in the south-western provinces where hydropower is the main source of electricity. The highest prices could be found in the eastern and south-eastern provinces. Price differences for the same type of user were different up to a factor 2 to 3 for different grids. Rural users generally paid the highest prices, which could in some cases even be a factor 5 higher than in south-western urban areas. Furthermore, peak prices were up to 40% higher than prices during non-peak hours in some areas, while during periods with low demand prices they could be 35% below the regular non-peak hours. The basic and wholesale prices for irrigation in poor areas on average were respectively 50% below or equal to the State Power Co-operation Company (SP) prices in most grids. The wholesale price for agriculture is the price set especially for the rural areas where the distribution facility is not affiliated with the integrated network. Before 1988 the average wholesale price was stable but between 1988 and 1992 the annual increase was around 10% and even over 30% in 1993. In 1995 the price increase dropped to only a few percent again to produce an average electricity price of 27 US$/MWh (Chandler et al. 1998).

The fact that power production enterprises raised the charges individually hindered the natural growth of the State’s electricity prices and has reduced the country’s capacity to withstand price reform in the power industry. In the Electric Power Law (promulgated in 1995) it is stated that for the same type of consumer and in one grid the prices should be the same. The Chinese government in 1997 intensified its effort to reform electricity tariffs. In 1997 in 18 of the 27 grids under the SP a unitary selling price schedule became operational. This means that special local charges are no longer added to the country catalogue prices. The catalogue prices are still differentiated for different categories of consumers and depend on the peak demand, transmission capacity of the network and a ‘power factor demand charge’. Exceptions to this price structure can be applied for individual users.

China still uses two types of tariffs: the old administered prices for old power plants and "guidance" prices for new power plants, though the gap between the two types is decreasing. The government hopes to unify the price of electric power within grids soon, but many obstacles remain. The government still controls prices for some residential customers, large state-owned enterprises, and agricultural consumers. Subsidies to these sectors are decreasing but have not been completely abolished, particularly for irrigation.

Shi Dazhan, the Chinese power industry minister, announced in 1998 that the charges for electricity will be further standardised and that inspections on electricity tariffs will increase to stop pricing irregularities. To further standardise the tariffs guidelines in which fuel and transportation costs will be taken into account will be developed.15

3.2.2.4 National investment

In 1980 the Chinese government initiated policy to emphasise energy exploitation and conservation, although it emphasised especially exploitation. Only some 6% of all investments between 1980 and 1990 were for energy conservation. The relatively low attention for conservation is due to the fact that the Chinese government has decentralised control over resources and has delegated decision making to local

15 http://203.207.119.2/sicnet/siccew/cewhtm/m073.htm , dd. 10/02/98.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (65)

34

governments and enterprises. The central government is still responsible for about 70% of budgetary financing for capital construction investments while the local governments and the enterprises control most technical updating investments. The current subsidies on energy consumption do not give an incentive to invest. Thus, the success of the implementation of these technical measures is very much dependent on the reform of energy pricing.

The State opts for collaboration through joint ventures. The Chinese share in large joint ventures is usually dominant. However, the State has prescribed that the main part of the production units should be built with Chinese technology. A coherent distribution system for the whole country will have to be developed to tackle the existing problems between regional and local distribution systems.

3.2.2.5 Energy policy

The reforms started in the 80s were accelerated in the 90s. Below the Chinese memoranda on energy policy is discussed.

China’s Agenda 21 programme

The 1994 ‘White Paper on China’s Population, Environment and Development in the 21st century’ was in response to the ‘Rio Conference’ in June 1992. This paper outlines a strategic plan for the sustainable development of China and includes the electricity sector. The State Council in Beijing approved this so-called ‘Agenda 21 Programme’ on 25 March 94 (State Planning Commission 1994) and the plan should guide the development of social and economic projects on medium and long-term and foreign investors. The recommendations made are also to be found in the ‘Ninth Five Year Plan (1996-2000).

The Ninth Five Year Plan

In 1995 the Chinese government issued the ‘Ninth Five Year Plan (1996-2000)’. In the Ninth Five Year Plan the goal of improving the power effectiveness is set at: 330-360 million tonnes of standard coal, with a power saving rate of 4.4-5.0%. As coal is the major source of energy for electricity production in China and the efficiency of the plants is low this sector has a high potential for energy saving.

The most important goals regarding the energy sector are a) a 9% annual increase in total energy output until the year 2000; b) a 5% annual improvement of energy efficiency; c) a 7% annual increase of electricity production capacity –i.e. 16 GW annually (including 3.5 GW hydropower)- and the installation between 1996 and 2000 of 80-GW new capacity; d) achieving an installed capacity of 290 GW by 2000; e) an increase in total coal output up to 1.4 billion tonnes in 2000; f) a boost proven reserves by adding 33 billion barrels of crude oil and 17.7 trillion cubic feet of natural gas by 2000; g) an increase in crude oil output up to 3.1 million b/d and refinery output up to 4.5 million b/d by 2000; h) an increase in natural gas production up to 833 billion cubic feet by 2000; and i) having 70% of urban households using gas fuel by 2000.

China also plans to extend the transmission system and couple the existing systems. Furthermore, it plans to have one fully operational national network by the year 2020 16.

16 http://203.207.119.2/sicnet/siccew/cewhtm/m043.htm

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (66)

An Asian Dilemma

35

Renewable electricity

Policy on renewable electricity production can be found in the both the Agenda 21 and the Ninth Five-Year Plan discussed above. In 1995 the ‘Report on Strengthening the development of New and Renewable energy in China’ and the ‘Programme on New and Renewable Energy Development in China (1996-2010) were approved by the State Council. The programme is directed towards research, demonstration and dissemination of new commercial technologies.14

A major option for reducing GHG emissions in China is a fast introduction of alternative (non-coal based) energy technologies. Increased support for developments in the alternative technologies is needed. The alternative energy technologies could address the problems created by environmental impacts. In the next two decades most alternative energy technologies will probably be more expensive than large-scale coal conversion technologies. Based on predicted costs alone large projects in the field of nuclear and other large-scale non-coal technologies are probably too expensive. Thus, it is improbable that market forces alone will lead to increased used of these technologies in the next two decades. Therefore, a programme of well-targeted government and international co-operation for technology development and implementation is needed. Primary emphasis should be placed on technologies that could play a role in the long-term energy supply. Special attention should be given to research, technology transfer, technology demonstration and dissemination activities aimed at reducing the costs of alternative energy supply and improvement of economic competition with coal based technologies. There are some opportunities for no-regret investments in the field of hydro plants, wind turbines, natural gas and fuelwood production (Johnson et al. 1996).

Barriers for further market development of renewable electricity are the high degree of fragmentation of institutions, the lack of market (commercial) experience of institutions, the lack of awareness of the potentials of renewables among decisions-makers outside the renewable energy community, the lack of information exchange by practitioners of renewable energy technologies, the insufficient access to advanced technologies as well as to technical knowledge related to site selection and design optimisation, the insufficient market regulation, the underdeveloped state of regulatory framework for power sales (distribution), and the underdeveloped state of linkages with the financial community (Taylor and Bogach 1998).

3.2.2.6 Foreign Investment

Before 1990 guidelines for foreign investments existed that were directed to gaining access to technologies. There were also guidelines for foreign investment for enterprises focussing on exports. In 1995 the guidelines were detailed and in 1997 a new ‘Catalogue for the Guidance of Foreign Investment in Industry’ was issued. The main focus is still towards gaining access to foreign technologies.14

It is estimated that around 20% of all investments will come from foreign investors. The Chinese government creates international admittance to the Chinese market. Encouraging foreign investment is a key feature of Chinese Government policy. It is expected that around 20% of all investments in the power sector will come from foreign investors. Although most investors have been expected to enter into joint venture agreements (Hayes 1998: 29-30), the recent trend is to encourage even fully owned foreign enterprises. In China’s the recently enacted Build Operate Transfer Law allows 100% foreign ownership (China E-News 1997). The Government has also opened a Centre for Transfer of Environmentally Friendly Technology, which is supported by the

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (67)

36

State Science and Technology Commission and the Asian Development Bank.17 The government is also interested, it appears, in transferring existing power plants to foreign operators under a Transfer-Operate-Transfer basis. China has adopted a new tariff policy to boost foreign investment on 1 January 1998; these apply inter alia to high and new tech technologies which replace outdated and inefficient equipment and accelerate the technological transformation of traditional industries (China E-News 1998). The government is encouraging bidding in relation to coal fired plants, renewable energy, the grid system, and energy conservation projects

In their analysis of the foreign direct investment in China’s Power Sector, the author’s (Blackman and Wu 1999) conclude that the FDI has fallen far short of expectations of the Government because of institutional barriers (e.g. approval process, regulations and the risk of default on power purchase contracts), investors protect themselves by investing in small scale, imported technology based projects in coastal area, and that one third of the projects focus on efficiency enhancing generating technologies and one fifth on cogeneration plants.

The Chinese government has granted the ‘Build-Operate-Transfer (BOT) project’ (a 720 MW Laibin B coal fired plant) to a consortium led by The French EDF. A second project is open for bidding is a 600 MW plant in the Hunan province.

3.2.3 Key Issues

The key issues in the Chinese electricity sector are discussed below.

3.2.3.1 Macro-economic factors

The economic growth in China is directly linked to energy-efficiency. Accelerated development in the field of energy-efficiency will therefore lead in a faster development of the economy which leads to more opportunities for implementing new, more energy efficient, technologies. However, the difference in the increase in CO2 emissions by 2020 between a low and a high economic growth scenario is expected not to be more than 10% (Johnson et al. 1996; see Section 4.7).

Structural changes in the economy will probably continue to be the driving force for further reductions in energy intensity. Because of the changes in the product mix and sources of the increase of the value added in industry (especially from product diversification, specialisation and quality improvements), the energy use per head is expected to decrease sharply in the next few decades (Johnson et al. 1996).

3.2.3.2 Management of the sector by the government

A big problem in the electricity sector is the lack of clearly defined rights of ownership and control. The electricity production, transmission and distribution entities are largely owned by the State. However, at all government levels a large number of organisations participate in the process of management. Relatively few decision-making steps are delegated. Where decision-making is delegated, the decisions still have to be checked by government bodies. This makes decision making slow, diffuse, inefficient and non-transparent. It also leads to negotiations between government organisations which only act in their own interest. This also leads to big problems with setting tariffs and approval of investments (Shiwei et al. 1997). 17 China EE Info Bulletin, February 1997, http://www.pnl.gov/china/eeinfo97.htm

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (68)

An Asian Dilemma

37

3.2.3.3 Electricity pricing

Until recently power production and the grids were mostly government owned. The grids were operated by the Ministry of Electric Power Industry directly (through large grid authorities) or by the provincial utilities. Many electricity companies had two roles to play. On the one hand they are government organisations and on the other hand they are responsible for costs and profits. In contrast to the newer production units, which are financed by foreign and local investors and thus fully commercialised, the older units are only partially commercial and under government control. The electricity produced by these companies is allocated to the government. It was sold at lower rates than the electricity from fully commercial companies due to subsidies (e.g. discounts) (Shiwei et al. 1997).

According to Shiwei et al. (1997) tariff regulation is important. They identify the problem that the consumer tariffs are still set at the central level (catalogue prices), provincial level (guidance prices and surcharges) and municipal and county levels (surcharges). These problems lead to low investments in the sector and inefficient utilisation of scarce resources. The absence of clear pricing principles prior to the Electric Power Law was introduced, and the fragmentation, opacity, and complexity of the approval process discouraged investors. Shiwei et al. argue that prices are set without any reference to economic efficiency or willingness of final users to pay (the market value), but are rather negotiated. Therefore, consumers get the wrong price signals.

Some of the most important problems of the sector are related to the inefficient tariff structure. As mentioned before, the tariffs of electricity produced with older production units are kept low artificially. Also the costs of industry are kept low artificially to keep up the standard of living. These developments limit the possibilities of the electricity companies to be financially self-supporting. It also undermines the development of the sector. Furthermore, it results in a shortage in allocation of funds at a provincial and county level, which slows down investments in the sector. The low tariffs also fail to stimulate users to restrict their electricity use. This leads to a paradox in which, on the one hand, there is an inefficient supply and, on the other hand, wastage in use (Shiwei et al. 1997).

Shiwei et al (1997) identify the following problems with the producer and consumer prices still applied in large parts of the country:

Producer prices: The “new plant-new price” policy has led to contractual arrangements based on “take-or-pay” provisions providing for minimum use of power plants (generally some 5000 hours per year) charged at an energy price covering the variable and capital costs and a reasonable profit. The same price is applied for generation above this “take-or-pay” provision. This one part tariff structure leads to over-investment in base generation capacity and uneconomic dispatch because provincial power companies faced with higher prices from new and efficient plants limit power purchases to contractual minimum amounts and rely more on old, inefficient plants to minimise financial costs. This also leads to spilling of scarce resources.

Consumer prices: Consumers with similar consumption characteristics still can pay different average prices because it is incorrectly assumed that they are being served by different mixes of new and old plants. This leads to inefficiencies in competitiveness of new industries because of high electricity prices that are above supply costs, and old, inefficient industries to enjoy low prices below the supply costs. The last leads to wastes in electricity use. Furthermore, other problems are that voltage differentials remain low

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (69)

38

and do not reflect the supply costs, the demand charges are low and, when applied, only cover fixed costs, and the time-of-day and seasonal tariffs used in some cases do not consider the load profiles and time patterns of marginal costs of supply. Various surcharges unintendedly led to different problems for the power companies and lack of use of economies of scale and did not consider problems with transmission capacity shortages.

3.2.3.4 Taxation

Before 1979 a relative simple revenue system for enterprises was in place. In 1979 this system was replaced by a complex system including income and many other taxes. In 1993 the taxation system was again reformed and simplified. The new system includes taxes on income (33%), turnover, investment, royalties, natural resource use, import duties and many other taxes.14

3.2.3.5 Efficiency in production

The overall conversion efficiency in China is considerably lower than in the developed countries in the world. Most of China’s electricity companies are not only inefficient but the quality of electricity supply is also low. The production companies themselves use much of the produced electricity. Roughly one third of all companies are too small to be technically efficient. This is not only the case for old companies but also for new companies and distributors (Shiwei et al. 1997). The State fears that the arrears (e.g. leeway) will even increase if no improvements are implemented.

According to Zhengyan (1997) the main difficulties with power saving in China are a) the weakness in power saving legislation, the lack of power conservation laws and regulations, and the insufficiency in law enforcement and monitoring; b) the reform on economic system needs to go further and the mechanism with economic interests encouraging power saving has yet to take form; c) the lack of power saving funds - i.e. the need for the formulation of more economic policies such as power saving investments and loan policies suitable for the market-economy; and d) the lack of social consciousness about power saving - i.e. the need for the intensification of publicity and training on power saving.

3.2.3.6 Renovation and modernisation

The need for large investments in the sector is acknowledged but the unclear, non-transparent and complex investment processes slow down new investments which are necessary for modernising and expanding the electricity supply in China (Shiwei et al. 1997). The energy savings potential in China is high. As discussed previously the energy sector in China relies heavily on coal and the main air pollution and energy saving can thus be found in coal application technologies.

3.2.3.7 Power shortage

Until recently the most important problem was the shortage of electricity. The electricity sector was unable to meet the growing demand. This limits production in industry, which limits economic growth. However, new power supplies and conservation efforts have reduced this problem. Due to the economic crisis in Asia and domestic reforms in China the supply exceeded demand again in recent years. Some regions now, in fact, face temporary oversupply problems due to a combination of slower economic growth, rapid supply expansion, and lost demand in closed factories. According to Chandler et al.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (70)

An Asian Dilemma

39

(1998), supply shortages still affect many areas of the country; the regional power supply situation ranges from adequate to severe shortage. In the north, minor shortages were experienced, except in southern Hebei province. In the northeast, no shortages have occurred because of slow economic development in recent years. In eastern China, Shanghai and Jiangsu have suffered some shortages during peak summer periods, while rapid economic growth and variations in rainfall affecting hydropower generation are responsible for respectively serious shortages in Shandong and occasional shortages in Fujian. As in Fujian, hydropower generation problems caused shortages in Henan (central China) during peak loads as well as in some areas of Sichuan (southwest). In the northwest, supply shortages were often serious, except in Ningxia. Finally, in Guangdong, the electricity supply was adequate except for some areas in north and west.

3.2.3.8 Urban electricity use

The urban distribution networks are unable to cope with the ever growing household peak demand. An investigation in Congqing city shows that 50% of the 10 kV lines and 80% of the lower voltage grids needs to be replaced with grids with a higher capacity (Falong 1995).

3.3 Electricity demand

3.3.1 Demand

Electricity demand has doubled between 1986 and 1995. The demand by sector and the annual growth rates between 1990 and 1995 are presented in the table below. It is clear that the industry is the major consuming sector. The growth rates of especially the residential, commercial sectors were very high.

Table 3.2 Gross electricity consumption by end-use sector in 1995 and annual growth rates be-tween 1990 and 1995.

Sector 1995 1990-95 Annual Growth Rate

(TWh) (%) Agriculture 53 4.6 Industry and Construction 535 7.0 Transportation and Communication 11 11.4 Commercial 20 16.1 Residential 104 9.3 National Total 768 8.5 Source: Rains Asia - 1999 BAU Scenario

3.3.2 Policy

This section gives a brief introduction to some policies in the demand sectors. As discussed earlier the analysis of the demand sectors has been less elaborate as the analysis of the supply sector.

The electricity demand sector went through many important organisational changes that are part of the changes of the Chinese socialist market economy (see Section 4.2.2).

The government since 1979 has carried out energy conservation projects. In 1998 the government formulated the Energy Conservation Law which contains many articles on energy efficiency. As discussed in the supply analysis many energy efficiency policies

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (71)

40

have been described in several programmes, such as the Green Lights Programme (see Chapter 6) and the Industrial Boilers Programme. New policy on cogeneration was developed in the year 2000. Furthermore, policy on the closure of small, inefficient plants was also developed in the 90s. This last policy was born from concerns for environmental pollution and not directly from concerns for energy efficiency.

Although many policies have been developed the administrative rules, the financial climate and the lack of financial resources stand in the way of large investments. The current oversupply in many of the sectors and the low electricity price prohibits large private investments in energy efficiency improvements. Private enterprises seem to prefer small technological changes based on technologies available in China as opposed to large technological changes for which they would heavily dependent of foreign investments. Policy implementation of the closure of small, inefficient plants is hampered by the fact that local governments depend on the tax income from these companies and thus do not support the national policy and enforcement is low. Furthermore, policy implementation is hampered by the fact that the central and local governments fear social unrest due to unemployment.

3.3.3 Key Issues

The following sections discuss the key issues and problems in the Chinese electricity demand sector. The key issues ‘macro-economic factors’ and ‘electricity pricing’ discussed in the supply section is also a key issue for the demand sector. Other key issues are energy efficiency, renovation and modernisation, power shortage, urban electricity use and rural issues. These are discussed separately below.

3.3.3.1 Energy efficiency

Large opportunities for improving energy efficiency are in the boiler sector. Despite major advances world-wide in boiler technologies, over the past 40 years China’s industrial boiler industry has operated in isolation of the rest of the world market. There has been a growing international interest in the large scale boiler sector in China. Among the reasons for the lack of foreign investments are: (a) low profit margins, (b) development is over a long timeframe, (c) for small scale boilers the partner companies in China are too small creating high risk, (d) there is little export potential. Besides the problems with access to advanced technologies in China there are also numerous domestic barriers as well. On both the consumer and the producer side: (a) the industry is highly fragmented, (b) product marketing capabilities are weak, (c) efficiency, coal quality and environmental standards for boilers are outdated and enforcement at the local level is difficult without access to advanced technologies, (d) high quality workers were drawn from the small boiler industry to the large boiler industry, etc. (World Bank 1996)

The GEF has launched a project to increase the efficiency of small and medium coal fired industrial boilers in China. Advanced foreign technology should be adapted to the Chinese situation and then distributed widely. Some 20% of all boilers of this type will be replaced in the project over the next 20 years. The method of implementation of the project is to adapt The indirect implementation is estimated to be 50-60% of all boilers of this type in the sector in China (World Bank 1998).

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (72)

An Asian Dilemma

41

3.3.3.2 Renovation and modernisation

The need for large investments in the sector are acknowledged but the unclear, non-transparent and complex investment processes slow down new investments which are necessary for modernising and expanding the electricity demand sector in China. The energy savings potential in China is high.

3.3.3.3 Power shortage

The demand for electricity in China has exceeded the supply between 1990 and 1997. This was because the GDP growth was higher than the increase in electricity production. About 1/3 of all industries was unable to use their full capacity due to this shortage in electricity and many households had to cope with regular power shortages as well. One of the causes of this power shortage was also related to inefficient energy use. On average the Chinese industries use more energy than comparable OECD industries (Shiwei et al. 1997). However, partly due to the economic crisis in Asia, supply has exceeded demand in the past two years. A number of industries have been shut and the household demand has decreased due to increasing prices of electricity. This situation is not expected to last for a long time. While electricity demand has doubled between 1986 and 1995 it is expected to triple between 1995 and 2015.

The growth of the services sector is expected to be responsible for the largest increase in demand in the coming decade. At present more than 100 million people in the countryside have no access to electricity and it is expected that the countryside will be responsible for a large part of the demand in the future. Electrification of the countryside and electricity supply to areas with cultural minorities is already in progress. However, the growth in economic development in the coastal and large urban regions will continue to be much larger than in the rest of the country (Shiwei et al. 1997).

Some of the most important problems of the sector are related to the inefficient tariff structure. As mentioned before, the tariffs of electricity produced with older production units are kept low artificially. Also the costs of industry are kept low artificially to keep up the standard of living. These developments limit the possibilities of the electricity companies to be financially self-supporting. It also undermines the development of the sector. Furthermore, it results in a shortage in allocation of funds at a provincial and county level, which slows down investments in the sector. The low tariffs also fail to stimulate users to restrict their electricity use. This leads to a paradox in which, on the one hand, there is an inefficient supply and, on the other hand, wastage in use (Shiwei et al. 1997).

3.3.3.4 Urban electricity use

Electricity use in urban areas in China has grown by 16.5% on average annually between 1986 and 1993 while total electricity use and urban energy use only increased by 9% and 2% annually respectively. The growth is mainly due to the increasing household incomes leading to purchases and uses of washing machines, televisions, refrigerators, air-conditioners and electric shower baths (86%, 79%, 58%, 5% and 18% respectively in 1993). In 1993 the per capita electricity use in households (125 kWh) was still around 30 times lower than in the US and 10 times lower than in Japan in 1986. The household electricity use was still only 12% of the total energy use in households in 1990. The main (76%) energy consumption was coal. In 1993 urban domestic electricity use accounted for 57% of the total electricity use in households while only 28% of the population was living in urban areas. Total household electricity use accounted for 8.7% of the total

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (73)

42

electricity use in China in 1993. In the US, France and Japan, household electricity use accounted for 34.8, 30.5 and 26.5% respectively in 1986 (Falong 1995).

The fast growth of the household electricity demand has widened the demand gap between peak and off-peak hours.

3.4 Rural issues

Rural development has been relatively more neglected than urban development. Many counties and townships build their own production units that are small and inefficient. Some 100 million people still do not have access to electricity.

A key problem in rural issues is that the price of electricity is higher than in urban areas and is thus beyond the reach of most people. In the countryside electricity is more expensive than in the urbanised areas. Many counties and townships build their own production units, which are normally small and inefficient. Some 100 million people in the countryside still have to do without electricity (Shiwei et al. 1997).

The potential for biomass use in electricity production in remote areas, far from the power grid, is high. Several projects in biomass power generation have shown notable progress in the past decade. (Dai et al. 1998: 106). From the beginning of the 80s some small scale generators using rice husks are used. At the moment 92 such generators with a capacity of around 160 kW are used. A 1,500 kW rice husk generator is built in Yueyang, Hunan Province. However, the plant is still in the stage of research for crop stalk-based biomass gasification generation. The high costs of the equipment prevents large scale introduction for the moment (Dai et al. 1998: 147)

In rural areas the main issue in households is biomass use for cooking and space heating. The old stoves had a thermal efficiency of only 8-12%. The government has implemented a plan to replace old household stoves with new stoves with an average thermal efficiency of 20%. By 1994 some 70% of the rural households (700 million people) used these new stoves (Research Team of China Climate Change Country Study 1999: 241-244). New technologies for different types of biomass are under development. China’s Ministry of Agriculture (MOA) has made biomass energy exploration and utilisation a priority.

As mentioned earlier rural development has received less attention than urban development. Some 100 million people still do not have access to electricity. A survey of 3240 rural households in China, reveals that energy consumption per household accounts for 700-1200 kgce, 40-60% of which is used for cooking; the rest is used for lighting, heat and feeding. 60-90% of the energy used is from biomass and the average energy conversion rate is in the range of 10-20 %. The average cost of commercial energy per household was about 7-8% of the annual income.

However, government policies are now geared towards promoting eco agriculture and the development of rural energy schemes. In 1991 a rural energy programme was launched in rural areas in 100 counties. In 1995 fuel saving stoves, methane, solar, wind, geothermal and small hydro were launched (Information Office of the State Council 1996: 20-21)

3.5 Future policy options

This section gives options for improving electricity policy as identified in the literature. Options are presented for economic reform, reform in the electricity sector,

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (74)

An Asian Dilemma

43

3.5.1 Economic reform

­ According to Lou (1997), China should aim at completing the reform to a market economy, creating the right institutional framework to achieve macro-economic regulation through monetary and fiscal policies. These policies aim at stable eco-nomic growth, balance of payments, fair competition, and distribution mechanisms that emphasise efficiency while addressing the concerns of equity and social welfare. He supports a) the development of anti-inflation policy followed by system-wide transformation and structural adjustments to cope with recession; b) the development of national and integrated –as opposed to incremental- reforms; c) the introduction of standardisation to deepen the market; d) the enhancement of decentralisation when appropriate (thus not in fiscal affairs) and the need to develop cultural changes; and d) the analysis of the feasibility of plans. Concerning the latter, many plans encoun-tered problems with implementation in 1994. This was due to the fact that many market instruments were not fully understood and vested work styles and departmen-tal interests were difficult to change.

Such reform could spur energy conservation and no regret projects.

Experts recommend that there is need for price adjustments and full cost pricing (i.e. products should be priced at full cost),for an environmental tax, pollution levy and ecological destruction fees (i.e. the environmental costs should be reflected in the price), for an opening of the coal market to allow prices to gradually reach the world market prices, for investment management, a fund raising system, investment services, environment funds, a pollution permit discharge trading system, deposit, insurance and responsibility compensation, and an integrated accounting system at all government levels (Jinnan and Xinyuan 1997: 21).

3.5.2 Reforms in the electricity sector

­ Shiwei et al. (1997) advise a reform of the regulatory system from the old-style command-and-control to light-handed supervision of autonomous, commercial ori-ented enterprises. The principles of these reforms are:

­ Enterprise reforms through defining property rights, separating government from en-terprise, commercialising and corporatising of enterprises and continuing multitrack financing policy;

­ Sector reforms through encouraging the “purchasing agency” model as a transition step, promoting generators that are unaffiliated with buyers, fostering developments of markets through “loose” and “tight” pools, assisting regional groups to be opera-tors of the transmission grid and power tools, and encouraging educational and tech-nical standard-setting roles for one or more industry associations;

­ Regulatory reforms include changes in the structure, the process and the policies of the regulatory framework: 1) the structure though consolidating regulatory functions that are currently dispersed, establishing multimember, national, and provincial regu-latory commissions that are ultimately separate from other government entities, de-lineating clearly the responsibilities of the national and provincial commissions, not establishing regional regulatory commissions, not giving policy-making functions to the regulatory commission, funding the commission through small levies on kWh sales and annual licence fees; 2) the process through adopting the principle of “once” is enough, establishing producers for procedural, substantive, and financial accoun-tancy, pursuing transparency through public consultation clearly specified rules, written explanation of decisions, and public annual reports, creating procedures and

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (75)

44

standards for appeals of regulatory decisions, requiring regulatory commissions to make public all licenses, regulations and decisions, along with indices and summa-ries; 3) the policies through pursuing a new-style regulation that is limited, transpar-ent, and “allows managers to manage”, regulating price or profits is only when an enterprise has monopoly power, setting tariff levels to enable enterprises to cover their costs of supply (if they operate efficiently), setting tariff structures to achieve the efficient production and use electricity, reviewing investment plans before the fact, not requiring additional approvals of projects that are consistent with approved investment plans, promoting competitive markets in generation and elsewhere if fea-sible, requiring approvals of merges, acquisitions and other structural changes that could affect competition, and treat state and non-state power enterprises equally;

­ Legal reforms through issuing a State Council regulation that establishes national and provincial regulatory commissions, allowing commissions to issue licenses, regulations, and case-by-case decisions, developing model licences for network and distribution entities, creating monitoring and sanction mechanisms for violations of regulatory rules, giving enterprises the right to respond in writing to alleged viola-tions, establishing clear standards for appeals of regulatory decisions, and restrict the ability of commissions to make unilateral changes to existing licenses.

It is acknowledged that introduction of these recommendations will take time and should be implemented in phases.

Furthermore, Shiwei et al. (1997) argue that the size and diversity of China imply that no single structural model for the sector is appropriate for all parts in the country. A purchasing agency structure and power pools could be a useful intermediate structural model for many parts of China. Along these lines, a single buyer or purchasing agency is the only buyer of power from generators in a specific geographic area. The single buyer usually owns the transmission facilities within this area and also performs the dispatching function, making him the only seller of power in the area to affiliated and independent lower-level power supply (distribution) enterprises, such as county, prefectural, and municipal power enterprises. Finally, independent and affiliated generators located inside or outside the geographic area compete for the right to make power sales to the single buyer.

The advantages of such an agency could be that it could easily accommodate competitive bidding for the purchase of power with or without joint ventures, it could encourage more investment in transmission and distribution, it could serve as a transition to a more fully competitive market and, steps have already been taken to create this structure in many parts of China. The agency could implement policy that is made by and be accountable to the State Council. The commissions in the agency could have central and provincial entities with allocated responsibilities. It is important that the commissions inform and discuss with all effected parties on any proposed regulatory action.

The biggest problem with this purchasing agency and the power pool structure is that this model should avoid both the perception and reality that the agency may unfairly and inefficiently favour its own power generators over others. This problem could be solved by signed contracts with all (affiliated and non-affiliated) power producers. However, the best option, according to overseas electricity regulators, is to ensure that there are affiliated producers (Shiwei et al. 1997).

The same authors also suggest that the New Electric Power Law could provide a solid foundation for the regulatory system described above. However, the law includes sentences on the tariff system and regulatory responsibilities that could be interpreted as

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (76)

An Asian Dilemma

45

inconsistent with the proposed reforms. On the other hand, these sentences could also be interpreted in a way not directly conflicting with the proposed reforms. However, the law may need to be amended or supplemented by additional laws in the future.

Johnson et al. (1996) state that the policy should move towards a further enterprise reform by development of corporation autonomy and accountability, more competition, and further price-reforms. Also environmental regulation could be an important tool for improving energy efficiency and implementation of ‘clean’ technologies, especially at the local scale. They conclude that the environmental regulations should be adapted to a more market oriented system and the enforcement must be improved.

3.5.3 Energy efficiency policy

­ According to Johnson et al. (1996), the government should aim at removing the bar-riers of ‘no-regret’ energy efficiency projects. They argue that this could be done by a) increasing the access to information about the technical opportunities and experi-ences as well as to foreign technologies; b) reducing both the high technical and market risks associated with new technologies, and the transaction costs of small transactions; c) improving credit facilities for energy conservation projects, espe-cially for those projects with long payback time; d) developing well-targeted conces-sional finance for demonstration of new energy saving technologies, especially those with high risks; e) developing energy service companies which bear the risk of in-vestments for a share in the financial return of the enterprises; f) better disseminating information on energy conservation investments and returns, especially to TVEs and small enterprises; and g) providing technical assistance and technical and (financial-) management training.

The same authors point out that a reduction of energy use could be accomplished through industrial modernisation and restructuring (i.e. more energy efficient processes, increase in the economies of scale, improvements in management), conventional industrial energy conservation projects (i.e. more waste heat and steam recovery, more co-generation, renovation of processes), improvements in the energy efficiency of new technologies already in use (i.e. technical and management capacity building, new coal conversion technologies and improvements in coal quality and stability of coal mix), and residential and commercial energy efficiency measures (improve building design, materials, central heating, stoves and electric equipment).

They also argue that the implementation of new technologies is low because of the large investments needed and the relatively slow payback time. Corporations are currently only interested in small projects with short payback periods. The interest is also low because of the low energy prices. Furthermore, the availability of new and especially foreign technologies is low.

3.5.4 Renewable energy

In general the barriers of implementation of non-conventional energy conversion technologies could be overcome by international co-operation which aims at (Taylor and Bogach 1998): offering a strong support for already existing commercially viable (niche) markets, developing demand-based incentives, emphasising the need for development of market infrastructure, expansion donor-support for alternative technologies, creating awareness of the externalities of conventional electricity production and the advantages

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (77)

46

of non-conventional technologies, and facilitating technology transfer through demonstration projects and joint ventures focusing on cost reduction.

According to them, this can be done by strengthening the long-term R&D and technology transfer program for renewable energy, continuing assessment of commercialisation priorities, developing regulatory policies regarding electricity prices, agreements for small producers selling to the power grid, implementing and enforcing standards, testing and certifying programmes for certain technologies, increase awareness inside and outside the renewable energy sector, training governmental and related staff in the field of renewable energy, strengthening institutions in the field of renewable energy, incorporating the external environmental and social costs of energy conversion in the cost/benefit comparisons of non-conventional versus conventional technologies, and training energy planners, energy plant developers, and technical and management staff in enterprises through workshops, seminars and training programmes.

3.5.5 Electricity pricing

Shiwei et al (1997) identify the following problems with the producer and consumer prices still applied in large parts of the country:

Producer prices: The “new plant-new price” policy has led to contractual arrangements based on “take-or-pay” provisions providing for minimum use of power plants (generally some 5000 hours per year) charged at an energy price covering the variable and capital costs and a reasonable profit. The same price is applied for generation above this “take-or-pay” provision. This one part tariff structure leads to overinvestment in base generation capacity and uneconomic dispatch because provincial power companies faced with higher prices from new and efficient plants limit power purchases to contractual minimum amounts and rely more on old, inefficient plants to minimise financial costs. This also leads to spilling of scarce resources.

Consumer prices: Consumers with similar consumption characteristics still can pay different average prices because it is incorrectly assumed that they are being served by different mixes of new and old plants. This leads to inefficiencies in competitiveness of new industries because of high electricity prices that are above supply costs, and old, inefficient industries to enjoy low prices below the supply costs. The last leads to wastes in electricity use. Furthermore, other problems are that voltage differentials remain low and do not reflect the supply costs, the demand charges are low and, when applied, only cover fixed costs, and the time-of-day and seasonal tariffs used in some cases do not consider the load profiles and time patterns of marginal costs of supply. Various surcharges unintendedly led to different problems for the power companies and lack of use of economies of scale and did not consider problems with transmission capacity shortages.

Shiwei et al (1997) give 14 recommendations for the acceleration of the ongoing tariff reforms. First, they argue that all tariffs should always recover the full economic costs of supply; and should not discriminate between affiliated and non-affiliated producers. Concerning producer tariff, they recommend a switch from a one-part to a two-part or multi-part tariff structure for both producers and transmission, the acquisition of new generation supplies through (international and/or local) competitive procurement whenever possible, and focusing on prices as opposed to on operators profits. Finally, they argue against the establishment of uniform producer prices based on administratively determined estimates of long-run marginal costs. In terms of bulk tariff,

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (78)

An Asian Dilemma

47

their recommendations are to use two-part tariff based on long-run marginal costs and to include generation and transmission costs in the tariff. With regards to consumer tariff, they support ideas such as using one or multi-part tariffs based on marginal costs, clearly separating taxes and fees from the electricity prices, unifying the prices charged to customers with similar costs and demand characteristics, charging prices to reflect the costs of providing service at different voltage levels, imposing capacity charge for customers when expected benefits exceed likely metering costs, and accelerating the movement of seasonal and time of day tariffs for larger consumers based on the supplying system marginal costs.

3.6 Analysis: First round of institutional policy options

In this analysis first the key problems in the electricity sector in the pre-1990 period are identified. The solutions that have been devised in the post-1990 period are then highlighted. Then the new problems in implementing those solutions are identified. Finally, a list of policy options is generated.

3.6.1 The Pre-1990 period

The key problems in the electricity sector in China are as follows:

3.6.1.1 Organisational

a) Gross size of the problem: The sheer size of China, the population, the diverging social, political and management cultures, the division into provinces and county territories, its population and its financial problems make it much more difficult to develop a manageable and efficient system in China.

b) The highly centralised management system of the electricity sector led to stagnation and bureaucratic inefficiencies, enforcement problems. There was also lack of clarity in the division of responsibilities between centre (local governments) and state and between different organs at both levels. For example there is an absence of a commercial and administrative mechanism to regulate the inter-regional sharing of power.

c) The Government had almost 100% ownership of production, transmission and distribution; although the organisation of the system was not well structured. For example, there were 10,000 legal entities in the system, 80,000 independent production companies and 1600 distribution companies. The system was so large and complex that the government had difficulty in controlling and managing its own assets efficiently.

d) There were more than 500 laws, regulations and administrative directives governing the electricity sector and this implied the lack of a transparent, co-ordinated, consistent legal and regulatory system.

e) There was a lack of a good and well-managed information and communication system.

f) The government aimed at self-sufficiency in terms of fuel sources mostly for energy security reasons.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (79)

48

3.6.1.2 Technological

a) Poor quality coal and long distance transport of coal: Of the extensive coal reserves in China, the bulk of the coal in the south near electricity generation facilities and industry is of poor quality. The high quality coal mines in China are in the north and western part of the country while the main use is in large urban areas in the east and south. This leads to large transportation distances. The coal is polluted with rocks and is not washed before transportation leading to a low transport efficiency factor.

b) Low plant load factors: Most of China’s electricity companies are not only inefficient but the quality of electricity supply is also low. This is not only the case for the old companies but also for new companies. Many of the smaller companies are too small to be technically efficient.

c) Transmission and distribution losses: Transmission and distribution losses are high because of the lack of investment.

3.6.1.3 Economic and Financial

a) There has been a complete lack of foreign investment in the pre 1990 period and reduced domestic investments in the production, transmission and distribution sector, in maintenance and repair activities.

b) There was an irrational pricing policy, which led to energy waste, lack of efficiency improvement investments and lack of investments in new technologies.

c) Several subsidies were provided by the state to finance the electricity production and distribution sector. There was also an irrational fee system in place, including national, provincial and local surcharges.

3.6.1.4 Socio-economic

a) There is poor energy literacy in industry.

b) There is poverty among the bulk of the consumers, making both the production and the use of commercial electricity more unpopular.

3.6.2 Transition solutions

The government has been in the process of devising the following solutions.

3.6.2.1 Organisational

a) The government adopted policies to stimulate the decentralisation of state enterprises.

b) Policies were introduced to rationalise the sector and to incrementally commercialise it and the introduction of competition.

c) A national Electric Power Law was adopted to consolidate the provisions in the 500 different regulations and administrative provision.

d) There was a hesitant approach to import some fuels from other countries.

e) Government participation in organisation of conferences and workshops.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (80)

An Asian Dilemma

49

3.6.2.2 Technological

a) The option of using high quality coal and coal washing are options for reducing the transport related emissions, although the use has been limited thus far. New production facilities may also be planned near the mines.

b) The government has planned the retrofitting of existing production facilities.

c) There are plans to modernise electricity transmission and distribution sectors.

d) There were also plans to encourage demand side management, technology upgrading and end-use energy efficiency improvements, such as the Green Lights Programme.

3.6.2.3 Economic/Financial

a) The government developed a programme encouraging privatisation of the sector, the corporatisation and commercialisation of power enterprises; and inviting foreign companies to participate in such ventures.

b) The government adopted a price rationalisation programme.

c) The government decided to gradually gradual phase-out subsidies and rationalise the fee and surcharge system.

3.6.3 New problems

3.6.3.1 Organisational

a) The decentralisation process is partially undertaken not only because of the size of the venture but also because of the complications in the process.

b) The transition process is affected by lack of information on market instruments and bureaucratic inertia; Command and control instruments continue to be used although the enforcement and monitoring of such measures is limited. Many enterprises are still controlled by the government and property rights are still not defined. The government regulatory system for the sector and the power enterprises is still not reformed.

c) Parts of the electric law on the tariff system and the regulatory responsibilities are inconsistent with its overall reform goals and there still remain issues that need to be clarified.

d) There continues to be a lack of information and communication within the system.

3.6.3.2 Technological

a) The decision to select and demand the right technologies is hampered by the lack of knowledge of appropriate technology choice, management and operation, the lack of communication within the sector. On the supply side, foreign investors were not forthcoming with the modern technologies.

b) There remained major problems in the connection between the local and regional grid system and that many of the grids have not been maintained and upgraded. This has lead to low supply security during peak hours.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (81)

50

c) There were difficulties in encouraging the large companies to adopt technologies, although the small-scale companies and the individual consumers were more amenable to such policies.

3.6.3.3 Economic/Financial

a) The foreign private sector was not as forthcoming as initially expected due to bureaucratic red tape, the lack of guarantees, the non-existence of properly functioning market system, long pay back times, etc..

b) Gradual phase-out of subsidies and price rationalisation is not politically easy since the pricing system in each production system was different and different categories of consumers paid different amounts.

c) There was a lack of incentives to encourage the various social actors to take action in this field.

3.6.3.4 Socio-economic

a) The risk and fear of increasing the rate of unemployment and, hence, instability, was a key challenge in implementing the reform of the electricity production and consumption sector.

b) Around 100 million people still do not have access to electricity and the relatively high price of electricity in rural areas implies that many potential consumers were unable to afford the available electricity.

3.6.4 Policy Options

The following section identifies a key set of policy options that may be relevant for discussion with stakeholders.

3.6.4.1 Organisational

a) Further decentralisation of management and further commercialisation of enterprises through the identification of appropriate incentives and through policies to re-educate personnel so that they can apply for employment in the new private sector.

b) Personnel that have been working with an ideological orientation for several decades cannot change their work styles and patterns over night. This calls for intensive training programmes and workshops to help the personnel feel comfortable with the new rules of the game. There is need for technical and managerial capacity to plan, and increase operational and energy efficiency in the sector.

c) Policies need to be developed to encourage educational and technical standard setting roles for one or more industry associations.

d) There is need to create ‘purchasing agency’ model and foster developments through pools: The agency should treat affiliated and unaffiliated enterprises equally.

e) The legal regulations and policies need to be discussed with stakeholders in order to gradually increase the compliance pull of such decisions and to create the framework in which rule-based compliance is the rule, not the exception. On the basis of such discussions, there may be need for further reform of legal and regulatory systems and adapt regulations to a market oriented system. Create national and provincial regulatory commissions without policy making functions but with implementation

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (82)

An Asian Dilemma

51

(delegated power to issue licenses but not to make unilateral changes to existing licenses) and enforcement functions (including powers for sanctioning). Create possibilities for appeals to decisions made by the commissions.

3.6.4.2 Technological

a) There is need to develop a modus operandi to encourage information sharing and communication within the sector, to enhance the capacity of employees to identify, choose, adapt, improve and utilise technologies.

b) There is need for additional policies and incentives to encourage the commercialisation and modernisation of transmission and distribution and development of a nationally coherent network

c) Interviewees also point out that as long as there is surplus supply, the government should try and make use of the opportunity to retrofit the production sector to the extent possible.

3.6.4.3 Economic/Financial

a) There is need for an institutional framework for macro economic regulation system and the further development of market instruments. Levy systems have proven to be appropriate.

b) There is need for simplification of bureaucratic procedures, single windows for licenses, to encourage foreign investors participate in the market.

c) Electricity pricing should be harmonised nationally in order to deal with the problem of the inconsistent pricing system.

d) There is need to create an incentive system for energy efficiency and implementation of new, (energy saving and less environmental polluting, technologies (including renewables)

3.6.4.4 Socio-economic

a) There needs to be large-scale nation wide energy and environment literacy programmes to help consumers make informed choices and to make them familiar with the operation of a market system.

b) The use of progressive tariff may allow the low-income groups to have access to minimum electricity supply, and higher use of electricity is charged at proportionately higher rates.

c) There is also need to increase the scope and reach of the transmission lines in order to ensure that people in remote areas also have access to electricity or that local (non –grid connected) electricity supply is set up.

The policy options for the next twenty years would do well to identify and build on success stories in the electricity sector (and other sectors to the extent that they may be relevant). The above information has been summed up in the penultimate Table.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (83)

52

Table 3.3 First round of analysis of institutional policy options for China.

Pre-1990 problems Policies adopted ‘New’ problems 1999 Policy options Organisational • Size of the country and regional

differences • Centralised management system • State ownership of 10,000 legal

production, transmission and distribution entities; combination of administrative and business functions;

• Confusing and contradictory legislation

• Lack of information and communication

• Self-sufficiency goals on fuels

• Decentralisation of state enterprises

• Commercialisation and rationalisation of legal entities; introduction of competition in sector

• Adoption of electric power law

• Occasional import of fuels • Government participation in

workshops and seminars • Closure of small plants

• only partial decentralisation • bureaucratic inertia; command and

control still dominant; enforcement problems because of new patterns of vested interests;

• parts of the law are not entirely clear and in conflict with reform goals; reforms are short term though structural

• lack of information and communication

• further decentralisation of management, regulation and policy implementation and tough enforcement

• centralisation of policy formulation and fiscal system

• bureaucratic unfreezing/institutional unlearning; capacity building within government and industries

• create ‘purchasing agency’ and stimulate ‘pools’; already being experimented with

• further commercialisation of enterprises, transmission and distribution

• Involve stakeholders incrementally and increase legitimacy of policies

• learn from success stories Technological • poor quality of coal and long

transport distances for coal • low plant load factors (old and

new plants) • poor supply security and high

transmission losses • power shortage

• coal washing, and locating new production at mines

• retrofit existing plants technology imports

• modernise trans-mission/distribution

• increase production and end-use efficiency

• imported technologies not always cheaper or more appropriate than comparable domestic technologies;

• poor local and regional grid connection • lack of information • problems with implementation since

end-use efficiency was mostly on small consumers and industry

• capacity building within government and industries, encourage communication in the sector

• stimulate the development of a national, regional and local coherent transmission and distribution network

• retrofit existing plants/increase efficiency; • learn from success stories

Economic/ Financial

• lack of foreign and domestic investment

• irrational pricing policy in electricity and goods and services; bankrupt production entities

• state provision of subsidies and inconsistent fee system

• encourage foreign investors, privatisation

• price rationalisation • gradual phase-out of

subsidies and fees

• few foreign parties, national investment slowed down,

• price rationalisation only partly implemented, price elasticity low

• the number of fees • subsidy phase-out and fee

rationalisation difficult • Lack of incentives to facilitate the

process.

• create right institutional framework for macro-economic regulation system , further develop market instruments (levy systems)

• encourage foreign investors (develop less bureaucratic and simplified investment procedures)

• making pricing a central government issue • create incentives for increasing energy efficiency

and implementation of new (less environmental polluting) technologies

• rationalisation of prices Socio-economic • poor energy literacy in industry

• poverty of consumers • demand management inadequate

• price puts electricity out of villagers’ reach

• risk of unemployment

• energy literacy programmes • focused demand management options • progressive tariffs? Efficient energy use incentives • further rationalisation of prices

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (84)

An Asian Dilemma

53

3.7 Conclusions

The key conclusions that emerge from this chapter are:

First, the organisational and institutional frameworks relevant for the electricity sector are in a state of reform. The reforms are structural though based on short-term perspectives. The organisations are still only partly decentralised and there is strong bureaucratic inertia, large vested interests and a lack of information and communication.

Second, a large number of policies have been developed to make the supply and demand sectors more efficient. However, although many policies have been developed the administrative rules, the financial climate and the lack of financial resources stand in the way of large investments.

Third, reforms towards a market economy and local air pollution problems and are a driving force for energy efficiency improvements.

Fourth, the current oversupply in many of the sectors and the non-rational electricity prices prohibits large private investments in energy efficiency improvements.

Fifth, large technological changes depend heavily on foreign investments. However, there are only a few foreign investors that want to invest in China under the current setting.

Sixth, local governments do not always support the national government policy and enforcement is lacking. Both fear for social unrest as a result of closure of small, inefficient plants.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (85)

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (86)

An Asian Dilemma

55

4. India: The Institutional and Organisational Context

Author: Joyeeta Gupta18

4.1 Geo-political background and relation to greenhouse gas emissions

This chapter introduces the issues relating to electricity supply and use in India based on a literature survey and institutional analysis. Chapters 5, 6, and 7 examine business-as-usual scenarios for the Indian electricity sector and technical options for reducing emissions. Chapter 8 looks at the feasibility of these options while Chapter 9 analyses the feasibility of other low emission scenarios. In Chapter 10, we examine the perceptions and policies of India on the global problem of climate change and the willingness to link electricity policy to climate change policy. It first presents a brief geo-political account of the country, and introduces the issue of greenhouse gas emissions in India. It then presents the institutional framework for analysis of the supply side issues. This is followed by a presentation of the institutional framework for analysis of the demand side issues. Then there is an analysis of the potential for cogeneration followed by an analysis of the transmission and distribution sector. Some rural issues are also highlighted. The institutional framework will highlight the key actors involved, the organisational structure, the policy and legal issues.

India has a land area of 3.287 million square kilometres (seventh largest in the world) and a population of over a billion people (second largest in the world) growing at 1.9% per year. Industrial growth exceeds 9% annually. Politically, India has a socialist, democratic, secular system and a parliamentary form of government. Although relatively stable, the last decade has witnessed a number of elections. A number of political parties exist in India and the Congress Party, which used to win the elections, has recently given way to a range of other parties. The current government is a Bharatiya Janata Party (Hindu Nationalist) led government but is an uneasy coalition. Traditionally, India had a mixed economy with public sector involvement in most large-scale operations. Since 1991, the economy has been liberalising and all the parties that have been in power since then have implemented this policy.

India has a federal political structure with 29 states19 and union territories20. The states in India differ not only in terms of language and culture but also in terms of size, income, population, and literacy levels. The states with the largest income are Maharashtra, Uttar Pradesh and West Bengal, while on a per capita basis, the states that have the highest income are Punjab, Maharashtra and Goa. The population density is highest in West Bengal, Kerala, Bihar, Uttar Pradesh and Tamil Nadu. Fertility rates are lowest in Kerala and medium in West Bengal, while high in Bihar and Uttar Pradesh. Infant mortality is the highest in Orissa, Uttar Pradesh and Madhya Pradesh (India Handbook 1997).

Agriculture employs 67% of the labour force and provides 25% of the GDP, industry 15% of the labour force and provide 30% of the GDP and service employs 15% of the labour and provides 35% of the GDP. Energy (including electricity) is a key input for all these

18 With comments from Christiaan Boudri, Kees Dorland, Carolien Kroeze, and Jaklien Vlasblom. 19 Andhra Pradesh, Arunachal Pradesh, Assam, Bihar, Chhatisgarh (out of Madhya Pradesh), Goa, Gujarat, Hary-

ana, Himachal Pradesh, Jammu and Kashmir, Jharkhand (out of Bihar), Karnataka, Kerala, Madhya Pradesh, Maharashtra, Manipur, Meghalaya, Mizoram, Nagaland, Orissa, Punjab, Rajasthan, Sikkim, Tamil Nadu, Tri-pura, Uttar Pradesh, Uttaranchal (from UP), West Bengal.

20 Andaman and Nicobar islands, Chandigarh, Dadar and Nagar Haveli, Daman and Diu, Delhi, Lakshadweep, Pondicherry.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (87)

56

sectors. The total primary energy input in India in 1990 was 15.6 EJ, of which 23% was used for electricity generation. The total energy-related emissions of CO2, CH4 and N2O in India in 1990 amounted to about 693 Tg CO2-equivalents, of which 40% were from the power sector.

There are as yet no official figures about Indian’s greenhouse gas emissions. In our estimates (see Chapter 5) India’s total emissions of CO2 emissions in 1990 was 164 MtC and this is projected to rise to 663 in 2020 (see Chapter 5 for details). India with 16 percent of the global population emits 2.3 percent of global GHG-emissions which amounts to negligible emissions at a per capita level (0.2 tC/year in 1990, 0.5tC in 2020; see Chapter 5 and Mitra 1992b: 204) and per capita consumption of electricity continues to be extremely low, only 250 in 1990 and 330 kWh per annum in 1995. While the per capita income has increased by 1.6% since 1950 to 1990, the per capita carbon emissions have increased by 3.6% annually to 0.22 tC (Srivastava 1997: 942). Indian emissions are set to grow as the economy grows not only to meet the existing demand-supply gap in the electricity sector, but also to meet the growing needs of the economy.

India’s emissions are mostly from energy production and use, the agricultural sector, and waste management. India’s CO2 emissions are mostly from the energy production sector, which consists of non-commercial biomass (which is seen as CO2 neutral because of the short Carbon cycle); and commercial energy (including electricity). India’s methane emissions from the sector electricity were 3,867 MT in 1990 and are expected to rise to 8,259 in 2020. India’s N2O emissions from the electricity sector are 39 kt and are expected to grow to 60 kt in 2020. Indian electricity is, as far as it is produced for the grid, generated mostly from coal-fired plants. A small percentage comes from large hydro, renewable energy and gas-fired plants (see 4.2). Besides that, industry generates electricity in captive power plants. Indian electricity is mostly used in the industrial, agricultural and household sectors (see 4.3). Cogeneration also offers some potential for development. Rural India which mostly uses non-commercial energy is likely to use commercial energy in the future. The options for rural India are discussed in 4.4. The following sections present an analysis and conclusions.

4.2 Electricity supply

4.2.1 Resources

India is rich in coal, thorium, hydro and solar resources, but poor in oil and gas reserves. With 1-3% of proven coal reserves in the world, the largest coal deposits and mines, mostly under state control, are in Bihar, Orissa, Madhya Pradesh, West Bengal, Andhra Pradesh and Maharashtra. Indian coal is generally of poor quality, with low calorific value, a high ash and low sulphur content. Using coal in the power sector leads to high CO2 emissions, high ash and, in total terms high SO2 emissions. India has enough coal deposits to meet its electricity needs for a century. India has a hydro potential of 84,000 MW of large hydro capacity and 10 000 MW of small hydro capacity in 2020. Only 24% of the total potential up to 2020 has been used (and about 15% of the maximum potential for India). Wind power is estimated to have a potential of 20,000 MW or higher (TERI et al. 1999). It has, however, only 1% of the worlds oil production and 0.6% of the proven reserves, very little gas.

Non-commercial biomass meets 1/3 of the total energy needs in India (Haider 1998, (TERI et al. 1999). People using non-commercial biomass will probably be connected to the national, regional or local grid some day; this thus gives an indication of the amount of growth expected in this sector. At present thermal plants provide 69% of the total commercial power generation, hydro provides 11.5% and nuclear power provides 1.3%

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (88)

An Asian Dilemma

57

(RAINS-Asia data underlying TERI 1999, on the basis of primary energy equivalents). Out of a total thermal capacity of 62,439 MW, about 6,500 MW is based on oil, diesel and gas (Dua 1997).

4.2.2 Institutions

4.2.2.1 Existing laws and policies

India has just completed 100 years of power generation with the first power plant being a small hydroelectric plant near Darjeeling in 1897 (Abraham 1998). When India became independent in 1947, electricity production was scattered in isolated facilities generally run by the provincial governments. When industries were established they were usually established along with their own generating facilities, referred to as captive power plants. These facilities were regulated by the Indian Electricity Act of 1910. After Independence, the power sector was centralised through the Electricity (Supply) Act. The Constitution of India put electricity on the concurrent list, i.e. electricity came under the State and the Central government authority.21 The 1991 Amendment to the Constitution enables devolution of authority on electricity even to the panchayats (local government).

Prior to 1990, the generation and supply of electricity was mostly a public sector activity in the hands of the central government or in the hands of the state government. At the time, the sector was facing the challenges of electricity shortage, energy inefficiencies, a complicated pricing policy based on a system of cross-subsidies and was subject to populist policies. As a result of the unreliable service, large industries often coped by developing captive power plants,22 and small industries, middle class consumers and farmers by investing in a number of substitute appliances such as diesel generators, inverters, voltage stabilisers, etc.

Since 1990 the entire sector has been undergoing a process of structural change as a result of policy. In 1991, a process of liberalisation was launched. (http://www.winrock.org/REEP/Publications/ india/INDIARPt.html). First, there has been a decision to privatise generation and following that transmission and distribution.23 In 1991, there was a decision to liberalise the power sector. The Electricity Act was amended to enable private generating companies who could either provide electricity to

21 The Constitution of India allocates authority on various subjects to the federal and/or state governments. Elec-

tricity is in the concurrent list (entry 38 in list III of the seventh schedule) and hence the responsibility be-tween centre and state is thus shared. The centre is responsible for atomic energy, mineral extraction, regula-tion of oil fields and mineral oil, of petroleum and petroleum products, mines and mineral deposits, labour and safety in mines and inter-state rivers. Both centre and state can regulate electricity.

22 Captive power generation is not in general encouraged by the government. It has been the result of regular power shortages. Captive generation is estimated at 11,161 MW in Industry and Railways (http:// www.nic.in/indmin/power.htm). This can range from stand by captive generator facilities such as diesel gen-erators to cogeneration. While the former can lead to substantial pollution, the latter is desirable since it in-creases the energy efficiency of a plant. Under the Electricity Supply Act, permission has to be sought prior to the setting up of a captive power generation unit. Although this is the case, the records of such generation are in general not kept except in relation to captive capacities of over 100kW. Such captive electricity is about 10-12% of national production, although the rate of capacity increase has gone down. A field survey by TERI shows that establishments with the lowest captive capacity had one diesel generator. These account for about 32% total captive capacity in Haryana in 1985 to 40% in Rajasthan; contributing at least 13.7% of total gen-eration in Haryana (Ramesh et al 1990).

23 Not only generation and distribution, but the coal sector was in government hands as well (Haider 1998). Only gas and oil was in the hands of the Oil and Natural Gas Corporation (ONGC). Private sector and foreign mul-tinationals are allowed to form joint ventures with the public Oil and Gas sector in India to build, own and op-erate terminals, depots and other such infrastructure. The private sector is also allowed to import and market LPG, kerosene and low sulphur heavy stock. Furthermore, they are allowed to own refineries and it is ex-pected that they will be total deregulated by 2001-2002 (Barwe 1998). In the coal sector, private sector wash-eries are facilitated (Haider 1998).

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (89)

58

the grid or to consumers. In 1991, the Investment Promotion Cell (IPC) was set up to provide information and assistance to the private sector and to encourage them to help in the privatisation process. The new policy enables 100% foreign owned companies on any type of fuel, renovation and modernisation of any existing plant that provides to more than one state, co-generation and repatriation of profits (RBI 1991-92/266). The policy enables producers to recover full fixed charges and a 16% return on the investment at specific (68.5%) plant load/availability factors. The policy established a High Powered Board to monitor and promote faster clearances of such projects. The board consists of the cabinet secretary, the secretary of the Ministry of Power, secretary finance, additional secretary banking, secretary planning commission, secretary environment, secretary industrial development, secretary technical development, the chairman of the Central Electricity Authority (CEA), and other officials from the state government. The Joint Secretary of the IPC provides secretarial assistance to the Board (Gazette of India 1991, 22 October). Electricity generation projects that are below a certain budget (Rs. 10 billion) do not need to be approved by the CEA. No less than 60% of the funding should come from Indian Public Financial Institutions (IPFI). The incentives include a five year tax holiday, a tax on only 70% of the net income for the next five years, reduced import tariffs for related equipment and counter guarantees from the centre only for the first few projects.24There is a requirement of competitive bidding. By 1997, the policy had led to more than 200 proposals being received of which 50 are from foreign companies at a value of US$ 39 billion for an additional capacity of 31.0 GW (Handbook 1997: 14).

Second, there has been a decision to ensure independence of the pricing authorities from the political authorities by the creation of the Central Electricity Regulatory Commission (CERC), and by stripping the CEA of some of its responsibilities (see 4.2.2.2). The goal is to ensure rationality in tariff structure. In late 1997 price reforms were undertaken and a phased dismantling of prices has been initiated leading to a full liberalisation of prices by 2002 (Haider 1998). Third, there has been a power sector reform bill which calls on all states to reform their power sectors. This is a decision to unbundle the SEBs into three different entities (see 4.2.2.3). At this moment several of the electricity boards are being restructured. Orissa was the first chosen since the agricultural sector is quite small (8.7%) and this sector may not be able to object and because the people are mild in nature (Ranganathan 1996: 823; Haider 1998). This has been followed by restructuring of other state boards such as Haryana and Andhra Pradesh. Fourth, there is a decision to encourage corporatisation of generation, transmission and distribution units. Fifth, there is a decision to focus on distribution issues. Sixth, there has been a decision taken that each state needs to facilitate the adoption of mega projects in line with central government guidelines.25 Seventh, each state will have to open lines of credit to ensure the prompt settlement of dues. Eighth, the debts of public sector undertakings will be scrutinised. Ninth, all half-completed hydel projects are to be completed and inter-state disputes are to be resolved. Tenth, a National Power Grid is to be established. Eleventh, each state is to promulgate energy conservation measures. Twelfth, each state is to increase the generation of power. Thirteenth, the railway tariffs will be rationalised as soon as possible (Ministry of Power 2000: 10).

24 However, since this means that market debt is converted into sovereign debt, the country’s credit rating may

suffer in the long term. Further, this amounts to “encouraging fiscal indiscipline of the states” (Ranganathan, 1996: 821).

25 In 1995, guidelines for mega projects were adopted. A project of 1000MW or more supplying to more than one state was defined as a mega project. Such projects would be on the basis of competitive bidding. A Power Trading Corporation would be established to it would have security in terms of a letter of credit and could if necessary have recourse to central plan allocations for the state. Of course this is only possible if the states have already established the SERCs. The import of capital equipment would be free of customs duty for these projects (Ministry of Power 2000: 31).

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (90)

An Asian Dilemma

59

A National Power Plan has been prepared in 1996-97 covering the period till 2011-12, by the Central Electricity Authority. This plan envisages an increase of 8413 MW capacity in hydro plants, 43528 MW in thermal plants and 88 MW in nuclear plants, over the 9th, 10th and 11th five-year plans. This will require an estimated funding of 6,000,000 million rupees (http:// www.nic.in/indmin/power.htm). The government also has an active rural electrification policy (see 4.4).

In addition to all these specific policies, the Government of India makes five year plans for the country as a whole. The Eighth Five-Year Plan period has been completed and the Ninth Five-Year Plan is currently being implemented. The Eight Five Year Plan succeeded to add barely 16,500 MW of the planned 30,538 MW of new capacity by March 1997. The failure was partly because of inadequate planning in relation to fuel sources, revenues and finances, reliance on para-statal agencies and “accentuating the tendency to ask the public sector managers who are to do this work to be accountable and question even on minute day-to-day decision making by the police and Parliament, besides a host of Government auditors and Ministries” (Dua 1997). Appropriate pricing is necessary.

The Ninth Five Year Plan (1997-2002) aims, inter alia, at “ensuring environmental stability of the development process through social mobilisation and participation of people at all levels;” It aims at a total capacity addition of 40245.2MW comprising 9819.7MW of hydro, 29545.5 MW thermal, and 880 MW of nuclear.

Although there are many changes in the organisational structure of the electricity sector, some policies have remained relatively constant. Thus, for example, the government policy on fuels focuses on self-reliance and on trying to use the foreign exchange reserves with care, i.e. this implies using domestic coal. Nevertheless, coal imports have been encouraged by some state governments and there is some change in this field (see 8.2.2). While coal is seen as the dominant fuel, electricity from renewable sources is also seen as very critical for India. Since India has large hydro resources, hydro power is also encouraged, although in recent years the social effects have caused tremendous social resistance to such power. India is the only country in the world with a ministry devoted to non-conventional energy (excluding large hydro), which evolved from department status in 1982 to a ministry in 1992. The growth in this sector has been very high and since the 8th plan allowed for renewables to feed into the grid, there has been over-achievement in this sector. India is among the world leaders in wind based electricity and most turbines have been installed in Tamil Nadu, Gujarat and Andhra Pradesh. A huge wind resource assessment programme has been established and a centre for Wind Energy Technology is planned to undertake research, technology development, standardisation of equipment, and certification. There is considerably small hydro potential in India especially in the hilly regions of North and North Eastern India, in Andhra Pradesh, Tammil Nadu and Karnataka, but not much has been exploited thus far. The policy aims to promote such projects and a UNDP/GEF hilly hydro project is providing an impetus. There is also considerable potential for biomass based combustion, gasification and cogeneration (see 4.3.4). A huge integrated solar combined cycle power project of 140 MW is being developed in Rajasthan of which the solar component is 35-40 MW. Grid connected solar voltaic projects are also being commissioned especially in rural areas (see 4.4).

Renewable energy (including electricity) is promoted in India through a 100% accelerated depreciation, tax holidays for power generation projects, soft loans, customs and excise duty relief, liberalised foreign investment procedures, etc. Guidelines were sent to all the States on general policies and facilities for wheeling, banking, third party sale, purchase of power at a minimum price of Rs. 2.25 (about US 6.5 cents) per kWh by SEBs, with an

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (91)

60

annual escalation.26 Finance is available from the dedicated Indian Renewable Energy Development Agency Ltd. (IREDA), which also has resources from the World Bank and the Asian Development Bank, USAID and the GEF to promote a range of renewable energy projects. The 9th five year plan aimed to increase the generation by 3000 MW including wind power - 2000 MW, biomass power - 450 MW, small hydro - 350 MW, solar - 150 MW, energy recovery from wastes - 90 MW. It is expected that renewables will increase to 20,000 MW by 2012 (Gupta, A. 1997 OR 1987). In 2000, the Renewable Energy Bill was introduced in Parliament.

Table 3.4.1. Electricity and related laws in India.

Year Law Provisions 1910 Adoption of the Indian Electricity Act Licensed generation; administration by prov-

inces 1948 Adoption of the Electricity (Supply) Act Centralised planning; managed by provinces 1950 Adoption of the Constitution of India Electricity in the concurrent list. 1956 The Companies Act 1956 All generating companies must be registered

under the Companies Act. 1991 The Electricity Laws (Amendment) Act Enables privatisation 1991 73/74th amendment to the Constitution Enables devolution of power to Panchayats on

energy 1992 Ministry of Power started functioning in-

dependently

1992 Environmental audits mandatory 1998 The Electricity Regulatory Commissions

Ordinance Establishes the CERC and the SERC

2000 Electricity 2000 Bill/ Act Unbundling of SEBs and benchmarking of sec-tors

2000 Energy Conservation Bill Promotes a 1st conservation in 2012 in relation to 2000

2000 Renewable Energy Bill Establishes quantitative targets for renewable energy development

The electricity supply sector is also subject to environmental legislation.27 This has led, on the one hand, to an excess of paper work and several permits are required before projects may be initiated, while on the other hand, there are limited resources to actually monitor the environment and to catch the offenders.

In general, the energy ministry has more negotiating power than the environment ministry, and when there is a conflict between the two ministries, the government attempts to solve the problem through prioritising the concerns of the energy ministry. However, the recently enacted National Environment Tribunal Act of 1995 establishes a tribunal to award compensation to people negatively affected by the environmental impacts from any activity. It is also important in this context to note the increasingly activist role of the judiciary. 1500 industrial units have been closed down in Delhi or asked to move out of the city as a result of judicial decisions in favour of the environment. Many units have been closed down in Tamil Nadu, Andhra Pradesh, Gujarat, West Bengal, Uttar Pradesh, Maharashtra. An integrated steel plant has been

26 About half the States have announced their policy for priority purchase of power from renewables. A few

States have also announced an annual escalation of 5%. These policies aim at providing remunerative and as-sured returns, and to motivate investments by private developers and investors (Gupta, A. 1997).

27 These laws regulate water (1974, 76), air pollution (1981), environmental protection (1986), hazardous wastes (1989), environmental standards, statements and clearance (1993, 1994), coal beneficiation (1996), a National Environmental Tribunal Act in 1995, a National Environmental Apellate Authority in 1997 and an Energy Conservation Act in 2000.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (92)

An Asian Dilemma

61

abandoned in Mangalore. These could be indications that environmental issues will gradually become more and more important in the future.

4.2.2.2 Distribution of responsibility regarding power

Electricity generation is shared between the centre and state and there is potential for devolution of power to the village panchayats in relation to energy, while power supply is the responsibility of the state. At the central government level, the ministries of coal, non-conventional energy sources, petroleum and natural gas and the ministry of power are connected with energy generation and related policy. In addition, there is the Department of Atomic Energy and the Planning Commission with authority over energy and electric-ity policy.

The power ministry is the key body in the field. Under it, fall the Central Electricity Au-thority, the National Thermal Power Corporation, the National Hydro Power Corporation, the Power Grid Corporation, the Power Finance Corporation, The Rural Electricity Cor-poration, and the Energy Management Centre. Under the ministry of non-conventional energy sources falls the IREDA and state level departments and they have authority over mini, microhydel, and wind energy projects, and projects that are below 3MW capacity and the geo-thermal energy and transmission system network. The Planning Commission has a special Energy Policy Unit. The Bhabha Atomic Energy centre, the Centre at Ta-rapur and in Kalpakkam fall under the Department of Atomic Energy.

Since the states did not have the resources to meet their own electricity demand, the Na-tional Thermal Power Corporation (NTPC)28 and the National Hydro Power Corporation (NHPC) were set up in the 1970s. Today, out of 87,000 MW of installed capacity, about one third of the capacity is owned by the Central Government utilities. NTPC alone with 17,000 MW of capacity i.e. about 20% of the installed capacity, accounts for 25% of the generation in the country (Dua 1997). NTPC and NHPC, however, have no distribution arrangements and they sell electricity to the States according to an agreed formula and the States are required to pay for it to NTPC and other Central utilities.

The ministry of power is responsible for general electricity and energy policy, research development and technical assistance in relation to electricity and its transmission, ad-ministration of the Indian Electricity Act, 1910 and the Electricity Supply Act of 1948, is-sues relating to the Central Electricity Authority and the Central Electricity Board, issues relating to rural electrification, power schemes in Union Territories and power supply in States and Union Territories, issues relating to energy conservation and energy efficiency, and issues relating to the Public Sector Undertakings29. These bodies sell power to the State Electricity Boards (SEBs).

The Planning Commission makes five year plans for India, and the energy policy unit prepares the energy policy on the basis of information received from, inter alia, the Central Electricity Authority (CEA). The CEA, created by the Electricity Supply Act of 1948, forecasts demand, examines generation, plans, transmission plants and used to make system planning studies that underlay the five year plans of the government. The CEA monitors the performance of the utilities and the transmission and distribution bodies, focuses on renovation and modernisation schemes and is the arbitrator of conflicts

28 The NTPC was ranked in 1997 as the 6th largest thermal generator in the world and the most efficient, among

the top ten, in capacity utilisation by Global Utility Benchmarking Survey, done by Marketline, UK. 29 Damodar Valley Corporation, Bhakra Beas Management Board, National Thermal Power Corporation, Na-

tional Hydro Electric Power Corporation, Rural Electrification Corporation, North-Eastern Electric Power Corporation, Power Grid Corporation of India, Power Finance Corporation, Tehri Hydro Development Corpo-ration, Naptha Jhakri Power Corporation, Central Power Research Institute, National Power Training Institute, Energy Management Centre.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (93)

62

between the State Electricity Boards (SEBs; see 4.2.2.3) and the provincial governments, and promotes research and policy in the area of electricity planning (CEA 1999).

In order to deal with the problems that rose with the liberalisation of the energy sector since 199130 and the existing difficulties of the CEA in regulating price (see 4.2.2.3, 4.2.3.3),31 the Government amended the Electricity (supply) Act, 1948, to enable the es-tablishment of the Central Electricity Regulatory Commission (CERC) and the State Elec-tricity Regulating Commission (SERC). The CERC will regulate bulk pricing for central generating and transmitting units; interstate exchange of power and issue licenses; while the SERC will regulate the tariffs for the state generation and transmission and issue li-censes at state level. The CERC and SERC are administratively linked, but financially in-dependent from the Ministry of Power. The SERC controls the price at which the distribu-tion utilities purchase power. The CERC looks at the selling end; the SERC at the buying end. There was also a strategic interest in creating the CERC; this was to make the SERC acceptable to state governments. The CERC has powers to advise government in policy formation; but it is not mandatory for it to accept the advice. Thus far the CERC and 8 SERCs have been set up.

However, despite the so-called independence, Godbole (2000) cautions that unless the CERC, in fact, has financial independence, and can raise public awareness and support for its policies through transparent and fair decision-making regarding tariffs, it may end up an empty gesture. In particular, the body is advised not to raise tariffs till all other leakages in the system have been plugged and to consider deeply the issue of how tariffs are to be identified for a wide range of producers, generating at differing costs.

4.2.2.3 The State Electricity Boards and the private utilities

At the state level, the State Electricity Boards (SEB) make the policy on generation and distribution. Generation and distribution was also concentrated in state hands, although there were also five private utilities in India partly because of historical circ*mstances. These are Bombay Suburban Electric Supply Limited, Tata Electric Companies, Ahmedabad Electricity Companies, Surat Electric Company and Calcutta Electric Supply Corporation. The number of private companies have grown since then and in 1995, the private electrical companies in India produce 5% of the total electricity, and the private industrial generators produce another 5% (USAID 1995).

Initially, there were 18 State Electricity Boards in India.32 The SEBs were established in order to gain from the natural monopoly character of electricity supply, the ideology of government control, and the need to access the economies of scale (Subramanian and Vyasulu 1999: 2300). They provide about 75% of the total power generated in the country. They are autonomous bodies on paper although in general they tend to be closely linked to the state governments. They need approval from the state government for their investments, tariffs, salary structures and personnel.

However, by the 1990s the SEBs were in a state of financial crises. In the early 1990’s, the SEBs in Maharashtra, Himachal Pradesh, West Bengal and Kerala were the only

30 With the liberalisation of the energy sector, large multinationals wished to enter India. The CEA just did not

have the authority, independence and experience to regulate such a powerful and large company since “this requires a critical mass of skill formation in technical, financial, and legal and project finance aspects of the power sector” (Ranganathan, 1996: 821). Ranganathan explains as a result ENRON (see Box 4.2) and Cogen-trix were not closely questioned regarding the pricing and environmental aspects of their project by the rele-vant authorities.

31 The CEA and the SEBs were too closely connected to the generators, the politicians and the consumers and were unable to resist pressure regarding pricing. It was seen as critical that a rule based system was developed with minimum contact with the politicians and with the consumers (Meeting India 2000: 21, 22).

32 Orissa SEB does not exist anymore since 1.4.96. Other SEBs are also being dismantled.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (94)

An Asian Dilemma

63

economically viable Boards that were able to recover their costs and make some profits. The states with the worst financial crises were Uttar Pradesh and Andhra Pradesh. The crises was partly because of the high subsidies (e.g. discounts) provided to consumers especially from the agricultural sector,33 electricity theft (see 4.2.3.4) and distribution losses, high labour costs, arrears in revenue collection, etc. at the same time, the average price of electricity has increased five times from 42 paise per kWh in 1980-81 to 243 in 1998-99; but there are huge state wise variations. The crises cannot be solely attributed to the SEBs. In general, the SEBs received instructions from the state governments in relation to pricing policy and they were never compensated for the loss of income, they were unable to capitalise interest during the construction phase, and there was heavy interests that had to be paid because there was no equity participation (CEA 1998: 43). The Ninth Five Plan records that in 1996-97 the average rate of return of the SEBs was –17%.

The financial crises affected the SEBs in several ways. First, they could not even undertake routine maintenance and repair work (Pachauri 1998b). This led to diminishing performance and efficiencies. Second, they could not invest in policies to improve the plant load factors. The plant load factor in SEB plants was low, much lower in the Eastern and North-Eastern regions than in the rest of India. This was because of inappropriate quality of coal, age and size of units, equipment deficiency and failure or backing down of units due to low load and low demand. The plant load factor (PLF) was 64.7% in 1997-98, having incrementally climbed up from 52.4% in 1985. Third, they did not have the resources to invest in improving the T&D losses which were 22.3% in 1997-98. Carstairs and Erhardt (1995) argue that as long as the SEBs are weak financially they will be unable to access resources.

This led experts to argue in favour of a complete restructuring of the Indian electricity sector. They argued in favour of removing all the subsidies, commercialising the electricity generation sector and making the sector more market oriented (cf. Wade-Gery 1998). The Orissa State Electricity Board is the first board that is being restructured through a World Bank loan. This restructuring has led to the closure of the board and the establishment of the Grid Corporation of Orissa, Orissa Hydro Power Corporation and the Orissa Power Generation Corporation. This was possible by amending the Orissa Electricity Reforms Act, 1955. A SERC has been established to look into tariffs. Recently, also Karnataka has passed a reform ordinance (see Box 4.1).

This led to policies to liberalise the electricity sector. However, new problems arose as a result. First, since the SEBs were not financially sound, they cannot provide the guarantees necessary to ensure foreign investors that the electricity will be bought at reasonable prices to the consumers. Second, in the process of corporatising and privatising the SEBs, the commercial value of these Boards is difficult to determine since many were making losses. Third, the history of the first few private sector entrants into the market shows that the government does not have the wherewithal to actually deal with the private sector (see Box 4.2). In a rush to meet the needs of the private sector, the Government has often acted rashly: “the speed, selectivity and secrecy with which the contracts for additional power were signed with foreign IPPS have resulted in a backlash questioning the competence and credibility of the decision making process, with such

33 According to interviewees, when agriculture was subsidised in India, the sector was hardly using any electric-

ity and it was considered important to stimulate the production of food through electrification of the irriga-tions systems. However, by 1997-98, the agricultural sector had taken advantage of the subsidies and were us-ing a substantial portion of the electricity, thus raising the subsidy bill for the SEBs considerably. The annual commercial losses reached an all time high of 10,684 crore Rs. which implied an effective subsidy of 22,216 crore Rs. In 1997-98, the average tariff for agriculture was 28 paise per kWh, for households 134 paise per kWh, while for industry it was as high as 285 paise per kWh.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (95)

64

decisions being reversed or stalled” (Ranganathan 1996: 822). The private sector needs to ensure that they should strive towards transparency and robustness so that their deals can withstand public scrutiny (Ranganathan 1996: 822).

Box 4.1. Case study of Karnataka Electricity Reform Ordinance Karnataka has a Karnataka Power Corporation (KPC) in charge of generation and the Karnataka Elec-

tricity Board (KEB) in charge of transmission and distribution. The KPC has in general functioned quite well; problems have occurred in the KEB. The KEB has had problems with overstaffing, lack of motivation and discipline, a huge army of linesmen and meter readers and unhappy clients, poor rules and little vision. Partly because of the cross-subsidies and the costs of electricity to industry, many have invested in captive power plants.

In 1999, the Karnataka Electricity Reform Ordinance was promulgated to reform the State Electricity Board (KEB). This 63 page long ordinance tries to foresee every single eventuality and tries to make rules to deal with those situations. The KEB is also obliged to take instructions from the State Government, whether the directives make sense or not. There are certain archaic provisions such as an oath of secrecy that would have to be taken by members of the Commission in charge. The Commission is requested, inter alia, to promote energy conservation. Subramanian and Vyasulu (1999) argue that through this new ordinance, the state government hopes to access international loans; but in fact the ordinance “tinkers only with form, not substance”. This is because although an elaborate framework has been established, the powers of the Commission are unclear, the Govern-ment still retains remote control over the KEB, and “the reforms also enable the state government to abdicate its responsibilities without in any way surrendering responsibility”. The fact that the change takes the form of an ordinance and not a provincial law in which all stakeholders could have provided their viewpoint is to be regretted.

Source: Subramanian and Vyasulu (1999)

All this implies that the rate of return was a dismal –18% on average. The average price would have to rise by 60 paise to achieve the statutorily required 3% rate of return (Planning Commission 1999). However, according to the accounting system used, only Assam, Meghalaya and Bihar are making losses (CEA 1999: 40). The CEA (1999: 43) even states that, since 31st March 1996, the SEBs have generated a cumulative surplus of Rs 741.31 crores.

4.2.2.4 Financial institutions

Investments to modernise the sector are possible through access to financial institutions. This section briefly discusses the different financial institutions and their role, shortcomings and potential.

The Indian Banking system consists of the Reserve Bank of India, about 275 commercial banks, several development financial institutions (e.g. Industrial Development Bank of India (IDBI), Industrial Finance Corporation of India (IFCI), the ICICI who have reserved about 15% of their capital for the power sector), 125 mutual fund schemes and some other types of national schemes (USAID 1995). The new Securities and Exchange Board of India and the National Stock Exchange supervise the 23 stock exchanges in the country.

The Power Finance Corporation (PFC) and the Rural Electrification Corporation (REC) established under the ministry of power, are dedicated to lend to the power sector and to projects related to rural electricity respectively. The IREDA lends for the purpose of renewable energy project appraisal and financing, technology promotion and organises business development meetings in relation to renewable energy.

The Power Finance Corporation has three categories of interest rates: for thermal generation - 15% to SEBs and 16% to private investors; for transmission 14% to SEBs

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (96)

An Asian Dilemma

65

and 15% to private investors, for all other schemes 13.5% to the SEBs and 14.5 to private sector. For communication and computers the rate is 12.275%. In this way the PFC has an active policy to encourage energy conservation schemes and system improvements; it also has environmental conditionalities in relation to ash use and SPM and SO2 emissions. It is also a financially viable organisation with a record of 99% resource recovery even though it lends to the SEBs.34 The PFC (2000) has set up a Reform Group to assist with the reform process. The Rural Electrification Corporation is also a financially sound organisation, but does not explicitly keep environmental and efficiency goals in mind (REC Annual Report 1998). The Indian Rural Energy Development Agency lends for rural electrification policies and also finances demand side energy efficiency projects.

Within the Banking sector, the State Bank of India has been quite active. It has established the Project Finance Strategic Business Unit to develop the skill to finance power projects in collaboration with foreign partners. At present it finances 12 State Electricity Boards, and has taken part in the projects of Enron, GTECX, Spectrum Power, GVK, Bina and Essar.

Until recently, Indian commercial banks only provided working capital finance for infrastructure projects. However, with liberalisation and privatisation, the Reserve Bank of India has decided to (a) remove the ceiling on the amount of investment that can be made by a Scheduled Commercial Bank (SCB) in power projects; (b) give tax benefits on income from lending to infrastructure projects; (c) no longer limit the primary leasing period for infrastructure projects; (d) extend the “group exposure norm of 50% of net worth to 60% in infrastructure projects”; (e) remove the industry exposure limit of 15% from the power sector (Barwe 1998).

Indian Banks and All India Financial Institutions (AIFI) play an important role in the development of the energy sector in India. They can attract foreign investors by providing performance guarantees and provide low cost funding (from savings) and high cost funding (from investments in AIFI). However, in order to do so effectively, they have to learn to avoid asset-liability maturity mismatch, learn to evaluate projects in terms of their techno-economic viability and also in relation to the legal regulatory and institutional arrangements in a country. A key problem is that the rate of interest is very high. In comparison, the World Bank can lend at 7%; however, foreign loans are subject to exchange rate fluctuations and conditionalities. The banking sector is still monopolised by the government (80%), has a high interest rate, high reserve level, ineffective laws regarding debt recovery and subsidises sectors (ASSOCHAM 1999a and b). The capital markets although in a state of development have not yet really secured consumer confidence. The governing bodies need to be revamped to become more professional and transparent; the institutional organisation of the stock exchanges need to become more organised, the primary market needs to be revived (ASSOCHAM 1999a and b: 48).

4.2.3 Key issues

The following section discusses the key challenges in the electricity sector of plant load factors, renovation and modernisation, pricing, voltage fluctuation and load-shedding, and some regional issues.

34 Some SEBs have difficulties in paying back; Some financial institutions have established an escrow account

and if the SEB fails, they collect from the escrow account and their efficiency in collection has been 99.4% (Meeting India 2000: 25).

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (97)

66

4.2.3.1 The demand-supply gap

Electricity is the fastest growing sector in the Indian economy. Power generation has increased in the period 1991 -1998 from 287 billion units (kWh) to 420 billion units (kWh). The installed capacity has increased from 636 billion units in 1990 to 891 billion units in 98 (Ministry of Power 1998: 3-4). The growth rate is about 7-8% annually (Barwe 1998). Barwe cites the 15th Electric Power Survey, which shows that the peak demand is estimated at 95.7 GW in 2002 and at 131.0 GW in 2007.

There is a chronic shortage of electricity in the country. The gap between demand and supply is increasing. The electricity shortage is 11% on energy basis and during peaking demand the shortage is even around 18% on capacity basis. The gap has been steadily increasing and reduced slightly in 1999 (http://www.nic.in/indmin/power.htm).35

The need is estimated at an additional 10.0 –12.0 GW per year until 2007. The demand for electricity is increasing by 9% per annum (cited in Fisher-Vanden et al. 1997). The gap between demand and supply is greater than one would expect. This is caused by the fact that the percentage increase of power consumption (which is less than demand) is higher than the percentage increase in GDP. This is the case in many developing countries as the elasticity of power demand to economic growth is low (Sankar 1998: 141). However, as Chapter 5 and 8 will show, this is likely to change in the coming decades. According to a World Bank estimate for every 1.5% increase in GDP, electricity capacity would have to increase by 1.5% (cited in Srivastava 1997: 947).

The shortage of electricity has led to first, a loss of national income and workable hours (one estimate is that this gap has led to a 1.5 - 2% loss of GDP; Sanghvi 1991: 436). Second, it encourages substitution through inverters, kerosene lamps,36 diesel generators,37 voltage stabilisers, etc., which while creating an incentive for the development of new industry also leads to high environmental pollution. Moreover, it also causes product failure, such as energy efficient lamps whose life is cut short because of the voltage fluctuations.

4.2.3.2 Efficiency Improvement in Power Plants

On the supply side, the plant load factor is expressed as the ratio of the average power output during one year to the rated capacity. It thus gives an indication of the overall efficiency of the electricity production sector. The overall plant load factor (PLF) in India has been slowly improving. At the central government owned plants it has increased from 62.7 in 1992-93 to 71.1 in 1996-97. At the state government owned plants it has increased from 45.1 to 60.3 (http://www.nic.in/indmin/india.htm). The central government owned plants seem to have been operated quite efficiently compared to the state and private sector owned plants.

In the state of Bihar the plant load factor is as low as 14.3%; while the PLF in Andhra Pradesh is 73.7%. The impact of low plant load factor is that the plants are not generating as much as they could be; and this has implications for recovering revenues to improve the generation of the plant.

Another key issue is renovation and modernisation. The idea behind renovation and modernisation is that experience of the Electric Power Research Institute at California shows that the life of a plant can be extended by at least 30 years at the original 80%

35 This gap is not made evident in the RAINS-ASIA model which assumes that supply is equal to demand plus

transmission and distribution losses (see Chapter 5). 36 Which consume 400 times as much energy as a fluorescent lamp (Foulkes, 1998). 37 In Delhi, there are 20,000 diesel powered generators which cause direct local pollution whereas electric

pumps do not (Kohli 1998). There are 6 million diesel pump sets in the villages (9th Five Year Plan).

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (98)

An Asian Dilemma

67

operation level. Many of the electricity generation units in India are much in need of repair, maintenance and modernisation. From the 85.7 GW installed capacity, the government assesses that about 34.1 GW (24.4 GW coal fired plants and 9.7 GW hydro plants) needs to be modernised. It is expected that such modernisation can lead to a gain of 6.0 GW (http://www.nic.in/indmin/india.htm). Many state governments are hoping to secure additional funding to modernise the existing sector since they expect that such renovation may be cheaper than new plants. Out of a total of 1629 renovation activities, 787 have been completed. This means that at a cost of about 20-30% of a new power plant, the life of an existing plant can be extended. The Confederation of Indian Industry argues that with R&M the plant load factor can be moved up to 75%. The Central Electricity Authority is less optimistic about the potential. NTPC has developed experience in this field and has offered to undertake such renovation. In general renovation is considerably cheaper than modernisation (SCE 1995).

4.2.3.3 Pricing

Until the late 1970s, electricity was priced on market principles and the utilities were required to operate with a 3% return on capital under the Indian Electricity Act. However, in the late 1970s Mrs. Gandhi promoted her “garibi hatao” movement and called for the provision of electricity at much lower rates; the utilities became non-profit organisations whose purpose was to promote social objectives. Since then electricity has been highly subsidised in India. This was also because the Constitution of India calls on the government to ensure that there is no concentration of wealth to the detriment of the common people and hence energy pricing is used to ensure access to energy to low income people, increased agricultural productivity and a wider dispersion of industry to rural areas (Srivastava 1997: 941).

In 1996-1997, the subsidies provided to agricultural consumers amounted to Rs. 14,000 crores, an amount that has further crippled the SEBs in India (Pachauri 1998b). However, agriculture in India only has a 2.7% subsidy as opposed to the 10% ceiling imposed by GATT (Ranganathan 1996: 821). In 1994/95, the Indian Railways paid on average the highest tariff of 248.6 paise per kWh, followed by industry at 211.6, commerce at 203.4, households 93.0 and agriculture 21.8 paise per kWh (GOI 1995). In India, services and industry pay the most, followed by the households and then agriculture. This is the opposite to the US where industry pays the least since they use the largest amount of (base-load) electricity and at the highest voltage (Wade-Gery 1998). According to interviewees, the actual price paid by Indian Industry and commerce is higher than that pai by industries in Western countries

Each state in India has its own electricity pricing policy. At the national level the average cost of supply was 170.11 paise per kWh, and the average tariff was 140.72. The average cost of supply is the highest in Delhi at 210.30 paise per kWh, while the average tariff is 174.96. The average cost of supply is lowest in Kerala at 116.70 and the average tariff is 98.46 (Kedia 1997). Pricing in the future will be undertaken by the CERC and SERC (see 4.2.2.2).

The government’s pricing policy led on the one hand to increased agricultural production and on the other hand to the financial bankruptcy of the SEBs (see 4.2.2.3), and created disincentives for farmers to use the electricity with care; they do not invest in energy efficient pumpsets and instead overuse water (http://www.gujaratindustry.gov.in/pol-pow.html; see 4.3.2). This policy also led to reduced revenues that can be ploughed back into the system to improve the quality of the service provided and to lower the costs, artificially lower fossil fuel electricity prices in relation to renewable energy, development of populist policies and a system of patronage in which politicians and the electricity sector were controlled by the powerful local people (Pachauri 1998b).

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (99)

68

4.2.3.4 Transmission and Distribution

India is a large country. Transmitting and distributing energy is a challenging task. The losses associated with transmission and distribution are as high as 21% (1995-96) or 65 billion units (Abraham 1998). A 1% reduction in such losses implies a saving of 800 MW (http://www.nic.in/indmin/india.htm).

As a whole, one of the key problems in the transmission and distribution sector has been poor investment strategies. Singh (1998) argues that a general rule of thumb is that investment distribution over the categories generation, transmission and distribution is 50%, 25% and 25 % respectively. In India until 1997, the investment in transmission and distribution has been only 25-28% of the total investment in this sector except in the first five year plan.

The main actors in the field of transmission are Power Grid Corporation of India,38 the Power Finance Corporation that finances large generation and transmission lines and large substations, and the Rural Electrification Corporation that finances the small generation and transmission lines. Private companies are now also being allowed to invest in transmission.

The Power Grid Corporation of India is a public sector undertaking and has low environmental pollution, losses of 2-3% (international norm) and claims to be one of the six best utilities in the world. They are efficient and have a mini-ratna39 (PGCI 1998).

Transmission losses range from 2-6%. On the whole, these losses are not very high. However, as explained above, the key problem in the transmission sector has been poor investment strategies. Second, the transmission of electricity was originally organised state-wise, then five electrical regions were developed - Northern, Eastern, Southern, Western and North-Eastern. The key problem was that inter-regional sharing was not possible and surplus production in one region could not be made available to a region in deficit. Now it is being decided to nationalise the circuit to allow for inter-regional sharing (Singh 1998) and perhaps even internationalise it. Finally, there is the problem of varying voltage rates. There are several transmission lines in India. Some (30,000 circuit kms.) have a voltage of 400 kV; some (75,000 circuit kms) 220 kV and the bulk (130,000 circuit kms) 132 kV (Unstarred Question no. 2962 dated 19.12.96 in the First Chamber).

On the other hand, distribution losses are very high ranging from 20% to 60%. The distribution issue is far more complex. Transmission and distribution losses in India were assessed at 24% till the SEBs were unbundled revealing losses as high as 40-45% in the distribution sector alone, while transmission losses were only 3%. These losses were being disguised as agricultural subsidies.40

Within India, some states have higher losses than other states. Jammu and Kashmir and Arunachal Pradesh have high losses (above 45%), others are more efficient, like Dadar and Nagar Haveli, Pondicherry, Tamil Nadu and Andhra Pradesh. This calls for a state oriented approach.

The key problem in the distribution sector is the large scale theft by large and small enterprises. The only way to address this problem is, on the one hand, metering, billing and collection and, on the other hand, modernising the conductor sizes, the rerating of lines, and changing the capacitors. To the extent that there are members of the population

38 In 1980, the Government set up the National Power Grid which was corporatised in 1989 as the Power Grid

Corporation of India. 39 A mini-ratna is an award from the central government for performance. 40 Meeting India 2000: 3, 46

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (100)

An Asian Dilemma

69

that cannot afford the electricity, they may receive subsidies, but then the subsidies should be based on actual use.

The government of India intends to prepare guidelines for the power utilities, asking them to install energy audits, improve the voltage profile, tamperproof meter boxes to prevent theft, etc. and an amendment to the India Electricity Act in 1996 makes theft of electricity a cognisable offence under Section 39 (Handbook 1997: 146).

4.2.3.5 Some regional issues

Each province in India has its own characteristics and each has developed along different lines. Given that electricity is also a state subject, it is useful to examine the position of regions. The highest deficit in electricity production in India is in the states of Uttar Pradesh, Bihar, Andhra Pradesh, Madhya Pradesh and Gujarat. The highest plant load factors are in Rajasthan, Andhra Pradesh, Madhya Pradesh and Karnataka. The lowest plant load factor is in Bihar, Assam and Orissa (Handbook India 1997). The Union Territories/States with the highest per capita consumption of electricity are Dadra and Nagar Haveli (1574.40 kWh), Daman and Diu (1547.73), Pondicherry (968.85 kWh), and Punjab (756.37), Delhi (747.48) and Goa (601.82). The lowest consumption is in Nagaland (58.98), Tripura (66.28), Arunachal Pradesh (66.76), Manipur (107.41), Mizoram (111.74), Bihar (133.74). The data is for 1994-95 (Lok Sabha Unstarred Question No. 890 dated 27.11.96).

There are some regional factors that play an important role in influencing state electricity policy and performance. Civic tension in the state of Assam has led to pipe-lines being blown up by militants. In Kashmir the Dul Hasti power project has been delayed for security reasons (Bray 1998). Some states choose for reform, some for status quo and some simply deteriorate (Nyman 1998). Regional politics and poor governance are also reasons affecting performance in some states.

4.2.4 Privatisation and foreign companies

With liberalisation, the market is now open for foreign investors. Any company that wishes to establish a power generation project in India has to (a) prepare cost estimates and have it cleared by the CEA (Section 29 of the Electricity (Supply) Act, 1948; (b) seek techno-economic clearance from the CEA (Section 30 of the Electricity (Supply) Act. This calls for an examination of the water works for dams and the availability of water for thermal plants, output of electric power, use of transmission lines and systems, reasonableness of the scheme, site locations, etc; (c) publish in the Official Gazette and local newspapers under Section 29 of the Electricity (Supply) Act, and check this with the State government; (d) ensure water availability with the State Government and the CWC; (e) ensure clearance from the State Electricity Board and the State Government under Section 44 E of the Act; (f) ensure pollution clearance from the Pollution Control Board from State/Central Water (Prevention and Control of Pollution) Act 1974 and the Air (Prevention and Control of Pollution) Act 1981; (g) ensure clearance on forest and environment related issues from the State Forest Departments and the Central Ministry of Environment and Forests; (h) ensure clearance from the National Airport Authority on the height of the chimney; (i) register the company under Indian Companies Act 1956 with the registrar of companies; (j) ensure rehabilitation and resettlement of the displaced families as a result of land acquisition and secure clearance from the Ministry of Environment and Forests and the State Government; and (k) check current rules regarding equipment procurement under the import and export acts.

In addition, the entrepreneur needs to check on land availability from the state government, on fuel linkage from the Departments of coal, petroleum and natural gas,

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (101)

70

financing from the CEA and the financial institutions and on the transportation of fuels from several transport agencies.

Foreign investors (Foulkes 1998, USAID 1995) have low confidence in India since the experiences of Enron (see Box 4.2). They want guarantees that contracts will be respected, and that there will be less red tape. They are afraid that the poor financial viability of the SEBs implies that they may not be in a position to pay for the electricity generated.41 The companies want rational tariff structures, access to foreign exchange, fuel supply agreements, and domestic capital markets. Bray (1998) argues that foreign investors see the following non-commercial risks in India: the need to take regional interests into account; the need to be aware of the local/poverty nexus which might erupt and change the context of investment (see the influence of the Marxist parties), and the delays in rule-making (see the influence of the premature dissolution of Parliament in 1997 on the 9th five year plan and the New Exploration Licensing Policy).

Box 4.2 The ENRON deal: A GHG friendly project at high cost Abhay Mehta (1999) has done an extensive review of the deal made by Maharshtra Government with

Enron’s Indian subsidiary Dabhol Power Company. He explains that following liberalisation of the electricity sector, a Memorandum of Understanding was signed between the Maharashtra Govern-ment and Enron’s subsidiary which was soon followed by a legal contract. The Subsidiary would import gas to produce 2000MW of electricity for a period of 20 years. This is the single largest con-tract in India’s history. The State Electricity Board is obliged under the contract to take the electric-ity generated even if other producers are cheaper, and to pay according to a formulae based, inter alia, on the exchange rate of the dollar and the international price of gas. Since the Rupee is going down against the dollar and the gas price is going up, this is an extremely risky venture, apart from the fact that it has since led to reduced purchases from existing generating plants in Maharashtra even though they were much cheaper. The Maharashtra Government has counter guaranteed the deal and the Government of India has also provided a counter guarantee (which is based on all of India’s assets excluding military and diplomatic) in case the Maharashtra Government defaults. The lawyers of ENRON in effect argued that the project could not meet India’s laws and that Indian laws should be modified accordingly. Even though the project did not have formal clearance from the Central Regulatory Authority, even though there were several court cases, even though there were several questions asked, even though the World Bank refused to support the project, even though there was inadequate information regarding the financial viability of the project for the state government, the government has gone ahead and signed the contract. Protests from local people displaced by the company or affected by its policies have been brutally dealt with according to Am-nesty International and Human Rights Watch. Mehta argues that this project, that has been ap-proved through incompetence and lack of accountability and in breach of Indian laws, is likely to lead to a financial crises of one of the richest states in India. At the same time, Kohli (1998) ex-plains that from ENRON’s perspective, it was very annoying that with each new government at state level ENRON had to renegotiate the deal, and that eventually ENRON received permission to construct the power station, but the entire process called for 145 different permits and about 27 court cases.

On the other hand, there is a lot of scepticism in India about the Enron project. Mehta (1999) recalls in his book on the ENRON project that the government of India has entered into an agreement that was beyond its means and that might lead to enhanced financial losses for the state electricity board.

41 Since the State Electricity Boards provide guarantees for purchasing the electricity from the private initiatives

and since many of the SEBs are bankrupt, the private sector has demanded counter-guarantees from the cen-tral government. The central government has provided such counter-guarantees for eight projects for a period of five years, after which the projects must become viable and achieve a 3% return on their net worth).

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (102)

An Asian Dilemma

71

4.2.4.1 Case Study of the Power Policy in Gujarat

The State of Gujarat came into existence in 1960. At that time, its consumption of electricity was 315 MW; today it is 6238 MW and 1306 MW from captive power production. The per capita consumption is 650 kWh almost double the national average of 345 kWh. Gujarat has been experiencing industrial boom; ¼ of all industrial approvals in India are given in this state. The state also has near 100% electrification. It was therefore considered important to undertake a case study of this state. (The data below is prior to the earthquake of January 2001. The news indicates that the earthquake has destroyed most of the facilities in the state, but the extent of the damage is not yet known.)

Gujarat’s Power System Master Plan calls for the establishment of new large power plants, encouragement of the establishment of captive power capacity by industrial units, short gestation small plants near the load distribution centre, gradual privatisation of the grid (transmission will be in the hands of the State although the private sector will be encouraged to augment the capacities of the grid); encouragement of the use of non-conventional and renewable sources of electricity; rationalisation of power tariffs and duties through a Independent Statutory tariff Regulatory Commission; and a monitoring policy through a high powered committee.

The power policy’s six objectives are to plan and build up adequate capacities in generation, transmission and distribution of power through efficient and cost effective means; to achieve optimum utilisation of existing equipment and assets through renovation and modernisation;42 to rationalise the tariff structure to ensure a reasonable rate of return to power utilities and generate surplus needed for future investment, to improve the delivery of services and achieve cost effectiveness through technical, managerial and administrative restructuring of the utilities; to achieve conservation of energy through efficient utilisation and demand side management, and minimising waste, and to encourage generation of power through non-conventional sources of energy.

At present there are wind power plants at Lamba, Okha, Mandvi, Tuna, Thank and Bamanbore generating 64.53 MW of power. 16 new locations have been identified where the wind speed is between 19-25 km per hour. Government waste lands could be allocated profitably to such wind farms. Most parts of the state have solar insulation of 5.8-6.0 kWh per sq. metre per day. Solar power stations could be set up in North Gujarat and Kutch/Saurashtra. About 200 MW of energy can be produced by the 19 sugar mills in the state and there is ample biomass for electricity production. The potential for tidal energy is being studied.

The Power System Master Plan in addition will consider supply and demand management, optimum new generation of power, up-gradation of transmission and distribution systems, establishment of new transmission and distribution systems, removal of sub-regional imbalances in power availability, achieve cost reduction in generation and distribution, look at the feasibility of locating power plants outside the state and purchasing power from other states and identifying new sources of funds. The state will also encourage co-generation.

In addition, the cost of coal transportation has led the state government to import coal, naphtha, LNG and natural gas through its ports. Partly because of the expense of coal, renewable energy is considered important because the demand for electricity is expected to grow by 10% per annum. This will call for investments which the private sector is expected to participate in. Since the transmission and distribution losses in the state are in 42 It is estimated that renovation and extension programmes can extend the life of a power plant by 20-30 years,

while the plant load factor can be increased by 76%. 5000 additional units of power can be generated by using this method in the state of Gujarat.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (103)

72

the order of 20%, the state will spend equal amounts on generation and on transmission and distribution. For this it would like to increase the voltage where possible, replace existing conductors by high capacity conductors, reduce the impedance in transmission lines by continued installation of Static Capacitators to an optimum level, ensure better vigilance and decentralise generation at peak period by installation of small power plants. Further, distribution losses through theft will be tackled by designing the distribution centres as profit centres where the executive will be held responsible for theft and will receive monetary incentives for better productivity and management. At the village level Helpers Scheme will be set up to provide service backing. To reduce wastage and encourage conservation, energy audits will be made compulsory for all major industrial and commercial establishments, fiscal incentives and disincentives will be given to encourage environment friendly equipment, consumer guidance and education programmes will be carried out regularly, farmers will be encouraged to use drip irrigation systems, and energy efficient pump sets. The environmental pollution from sulphur and ash from coal-fired plants will be discouraged through incentives for de-sulphurisation equipment and use the ash for other constructive purposes. Finally, the state has decided to rationalise the tariff structure, but the Independent Statutory Power Tariff and Regulatory Commission will ensure that the cost of inefficiency is not passed on to the consumer. The revenues generated will be used to maintain and improve the plant and machinery. The utilities will be run on commercial principles. There will be higher tariffs for peak hour usage. Subsidised tariffs will continue for “socially obligatory activities” such as drinking water, street lighting and lighting for the urban and rural poor. These subsidies will be made explicit, quantified, reasonable and targeted.

The management of all these new utilities will fall under a new to be established Gujarat Council of Power Utilities; and a High Level board will be established to oversee the implementation of the policy (http://www.gujaratindustry.gov.in/pol-pow.html). Since September 2000, all sectors in Gujarat have to make audits and there is also a list of consultants who can do this, since Gujarat is the most industrialised state in India.43

4.2.4.2 Case Study of Andhra Pradesh

The state of Andhra Pradesh had a peaking shortage of 1808 MW, despite its high tariffs on electricity use and its high plant load factor. As a result of the shortage, power cuts of 50-60% of the consumption in 1989 were imposed on bulk consumers in 1990 and households faced daily power cuts of 1-4 hours a day. Many domestic industries were obliged to set up captive generating units (Sankar 1998: 142). The state government has adopted a policy following advice received in 1995 from a High Level Committee that aims to provide operational, managerial and functional autonomy to SEB or other successor to enable it/them to operate along commercial lines; establish a regulatory framework that ensures costs optimisation and operational efficiencies in generation, transmission and distribution of energy; encourages energy conservation and discourage unessential energy demand; ensures that while the government directs, it does not regulate the sector; promotes private sector participation and support progressive participation of the private sector in the distribution; removes dependence of SEB on government budgetary assistance.

In order to do so, the SEB is being restructured, it is being converted into a corporate body under the Indian Companies Act 1956; and all distribution companies will be wholly owned subsidiaries, that will be gradually privatised. An Independent Regulatory Committee will be set up to promote efficiency and economy in generation, transmission and distribution of electricity, promoting competition in the generation and supply of 43 Meeting India 2000: 27

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (104)

An Asian Dilemma

73

electricity, publishing information, advising the state government and making recommendations to the government. In addition it should enable the licensees to carry on their activities in accordance with the terms and conditions of their license. Furthermore, the pricing will be progressively reformed so that no sector pays less than 50% of the average cost of supply of electricity. The costs should be enough to compensate for the costs of the licensee, cover the costs of power and wheeling charges and give appropriate signals to licensees and consumers. A Steering Committee will oversee the implementation of these policies (http://www.apinfo.org/press5.htm).

Box 3.3 Success story of a captive-collective and capital-cooperative venture Sankar (1998) argues that captive-collective and capital-cooperative ventures in the state of Andhra

Pradesh have met with such success that these can serve as models for future electricity develop-ment projects in India. Given the electricity and capital shortage in the state and since foreign fund-ing was not forthcoming, the Andhra Pradesh SEB invited the largest of the 3500 bulk users of elec-tricity to participate in a joint venture undertaking for the generation of electricity in which only the participants would be entitled to receive electricity from the project in proportion to their invest-ment. The electricity generated would be fed into the state grid and each participant, no matter where it was located could draw its power from the grid. Although the project was set up as a co-operative, it was registered under the more efficient Companies Act. The two key concerns of the participants was if the SEB could correctly determine and guarantee the entitled supply to the bulk users. Companies not needing their share could wheel their surplus on the basis of bilateral ar-rangements with other companies. Participants were convinced in three meetings to participate in this gas-based power plant (which is cheaper, quicker to install and more environmentally friendly). The power plant provided electricity to its owner – consumers at 20-25% less tariff than was normal and nevertheless made substantial profits. This was partly because of the innovative management structure and the goals to reduce the capital costs and to ensure a short gestation period. Given the cumbersome procedures of the Government of India, the project group adopted a ‘turn-key’ fi-nancer who could advance loans to the company if there was delay in the national clearances. Sankar concludes that the cooperative approach between the state and the private sector (i.e. the marriage between private sector efficiency and the need for government clearance) and the several innovations of the group led to an efficient and affordable system of electricity generation. How-ever, without the political commitment to this project, it would not have been a success.

4.3 Electricity demand

4.3.1 Introduction

Murthy et al. (1997: 334-335) claim that the key sectoral contributors to greenhouse gas emissions in India are electricity generation, gas and water supply, transport (excluding rail), iron and steel, cement and non-metallic mineral products.44 We expect that energy demand will increase by 4500 PJ by 2020 and half of that will be from the domestic sector (including agricultural) and 1/3 from the industry sector.

By developing energy efficiency instruments, a key contribution to the reduction of the rate of growth of greenhouse gas emissions can be made by sectors that use electricity in production, transport and consumption. Given the growing electricity demand and shortage in the country, and the need to manage financial, electric and environmental resources efficiently, end-use management should be an important element of national policy. This includes the better use of current technologies through, on the one hand, management information systems, better housekeeping, reduction of system conversion 44 Curiously, these sectors contribute very little to the national income, where the major contribution is from

food and cash crops, textiles, chemicals, construction, trade and other services.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (105)

74

losses and energy leakage. There is considerable potential for reducing energy and electricity use in the agricultural and industrial sectors in India. Mongia et al (1994) show that there is a trend to reduce energy consumption per unit produced in various sectors. It should however be realised that a fuel use reducing option sometimes results in simultaneous electricity consumption increase (see Chapter 6). The following section describes the key tasks of all the major actors in this somewhat diffuse field, identifies the contribution of different sectors and then identifies the key actors and issues in each of the sectors. Chapter 9 highlights the bottlenecks and challenges in implementing policies in these sectors.

The major consumers of electricity in India are industry (cement, iron and steel, aluminium), commercial companies, agriculture and households. The major actors in this sector include the central government ministries, the producers of these products (industry), and the consumers of these products (agriculture, households and railways), the banks that lend resources to these sectors, and the industry federations.

A key element of demand side energy conservation is the institutional framework within which the industries have to operate. ASSOCHAM (1999 a and b) calculates that there are about 2,500 central laws in force and 25,000 laws in the states; many obsolete, contradictory and not easy to find your way through. The Commission of the Review of Administrative Laws has recommended repeal of about 1,300 laws at central level! It argues that government structure is based more on secrecy than transparency, and more on generalism than specialisation. Furthermore, there are 28 million lawsuits yet to reach the courts and there is thus a huge back log. ASSOCHAM recommends reform in legislative functioning, reform of government, administrative tribunals, judicial reforms, democratic decentralisation, review of old legislation, and that the recommendations of high powered bodies should be binding on government.

Following the oil shock of 1973, the government Fuel Policy Committee of 1974 and the Working Group on Energy Policy in 1979 laid emphasis on the need for energy conservation. The 1983 report of the inter-ministerial group on energy conservation examined specific areas of energy conservation. The Eighth Five Year Plan (1992-97) launched a National Energy Efficiency Programme to save energy by 5,000 MW in the electricity sector and 6 Mt in the petroleum sector and to increase the power generating capacity through the use of non-renewable sources of energy (including photovoltaic street lights in villages, PV water pumps, PV domestic light units and wind farms) to the extent of 750 to 1,000 MW. The four ministries of Coal, Petroleum and Natural Gas, Power and Renewable Energy, have all launched modest programmes to increase the efficiency of production.

The Energy Management Centre was set up in 1989 under the Ministry of Power, but ten years later it is seen as a defunct body with marginal significance.45 This is because it was not empowered to be able to operate outside the system of the ministries. There are some initiatives taken at state level (see 4.2.4.1), and some at central level. Till recently the only instrument was compulsory energy audits for some types of companies; but there has been a huge problem of non-compliance. Only 3000 out of the hundreds of thousands of industries in India submitted their audits in 1993. This is also because of the lack of public participation, erroneous and insufficient monitoring and institutional gaps (Sharma 1998). The ministry has drafted a law on energy conservation which sets up a Bureau of Energy Efficiency largely for setting norms and standards for energy consumption in process and production, transportation and end-use and for mandating energy audits by large consumers.

45 Meeting India 2000: 20, 21

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (106)

An Asian Dilemma

75

In addition to the legal and policy framework, there are a number of ministries that make policies that are relevant for specific sectors. India has at present 75 ministries at the central government level and different ministries have different responsibilities with respect to specific sectors.

Industry interests are represented by three major industrial organisations. The Confederation of Indian Industries (CII) (brochure) represents 80% of the organised industrial sector. It aims at facilitating change and fostering industrial integration with the global economy. It has a national council, regional, state and zonal councils. It has specialised committees, industry divisions and affiliated associations and institutions. The CII focuses on environmental and energy related issue. The Environment department focuses on convincing industry to become ISO 14000 companies, they conduct audits, draft policies, site assessments.46 The Associated Chambers of Commerce and Industry in India (ASSOCHAM) focuses more on fiscal issues. The Federation of Indian Chamber of Commerce and Industry (FICCI 1999 a) has 417 ordinary members, 1187 associate members and 50 Corporate members. It has been around for 73 years! Then there are specialised bodies such as Engineers India Limited (1999), Bharat Heavy Electricals Limited (BHEL) that makes power plant equipment, the National Council of Applied Economic Research (NCAER) which examines macroeconomic issues like industrial and demand surveys with expertise on power and infrastructure and others.

Box 4.3 Elements of the Energy Conservation Bill 2000 The Energy Conservation Bill establishes a Bureau of Energy Efficiency with specific powers and func-

tions. It explains the power of the central and state governments in enforcing efficient use of energy and its conservation. It makes provision for funding these tasks. It outlines the penalties to be im-posed in case of violation of the laws. The law identifies the following sectors as energy intensive sectors: aluminium, fertilisers iron and steel, cement, pulp and paper, chlor-alkali, sugar, petro-chemicals, gas crackers and naphtha crackers and thermal power stations, electricity transmission and distribution companies and commercial buildings or establishments specified as designated consumer (The schedule). In particular, the Bureau is empowered to make recommendations to the government on norms for processes and energy consumption standards, labelling on equipment, guidelines for energy conservation in building codes, training for personnel, consultancy services, research and development on energy conservation, development of testing and certification proce-dures, development of pilot projects, promotion of energy efficient uses, innovative financing, fi-nancial assistance to companies, levy fees, maintain a list of accredited energy auditors, and, inter alia, implement international co-operation programmes on energy conservation. The state is also empowered to constitute a State Energy Conservation Fund, in which money will be collected for the purpose of funding conservation projects under this Act.

The banks that lend to this sector include the Industrial Development Bank of India (IDBI), the Small Industries Development Bank (SIDB), and The National Bank for Agricultural and Rural Development (NABARD) in India.

Research and Non-Governmental Organisations play a major role in influencing policy. A key actor is the Tata Energy Research Institute.

The following section discusses the cement, iron and steel industry, aluminium, household and lighting, water pumps, cogeneration and motors and drives.

46 Meeting India 2000: 27

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (107)

76

4.3.1.1 Cement

Cement is a major and growing sector in a developing country like India and has received considerable government attention. India has substantial limestone; about 1/3 of the sedimentary rocks in India have limestone. The deposits are mostly in Andhra Pradesh, Karnataka, Gujarat, Madhya Pradesh and Rajasthan. The actors in the cement sector consist of the (a) the public sector (the Cement Corporation of India),47 about 100 large private sector companies, 57 cooperatives, 300 small plants, (b) the Ministry of Industry which includes the Development Council for the Cement Industry, (c) the Cement Manufactures Association (CMA)48 which represents the large scale companies and the All India Mini Cement Manufacturers Association which represents the small scale industry, (e) the National Council for Cement and Building Materials, (f) the IDBI and the state banks lend to this sector, and (g) environmental regulations are made by the environment ministry.

CCI100 large

300 small

57 cooperatives

Min. of Commerce

Min. of Mines

Min. of Industry

Min. of Environment

ProvincialMinistries

IDBI

State Banks

Nat. Council for Cement and

Building Materials

Development Council for theCement Industry

Figure 4.1 Actors in the cement sector.

The policy in this sector is made by the Ministry of Industry. The old policy has been to control price and distribution of cement and freight equalisation. The decontrol policy began in 1977 with a 12% post tax returns on net worth on new capacity creation and was completed in 1989. In 1991 licensing was abolished for the sector (Sarathy and Chakravarty 1999: 6).

The new policy includes permission to own captive mines, and an ‘own your wagon’ scheme initiated by the Railways, and the Ministry coordinated the Cement Industry Human Resource Development Project assisted by the World Bank, and Danida to modernise the sector. The policy on freight equalisation has also been discontinued to the benefit of this sector.

47 The CCI has nine units, 3 in Madhya Pradesh, 2 in Andhra Pradesh, 1 each in Karnataka, Haryana, Himachal

Pradesh, Assam, and Delhi and the total production is 38.48 lath tonnes. Of this 7.8 lakh tones is produced by the wet process. Since July 1996, CCI is a sick company; there is a sluggish market and the profits are low. The sizes of the companies are also not very economical for the latest technologies. Three of the factories (two in Madhya Pradesh and one in Haryana) are in the process of being sold to the private sector. CCI is also a member of the CMA (Meeting India 2000: 39 ).

48 The CMA was established in 1961 and represents 58 companies with 120 plants. It promotes the growth of the industry, protects consumer interest, identifies new uses of cement and exchanges information (CMA 2000).

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (108)

An Asian Dilemma

77

The cement producers themselves have certain environmental goals. The sector wishes to use washed coal since it reduces freight costs, cost of processing the raw materials and increases the efficiency of pyro processing. Dipika washeries has been set up and began production in 1999. The cement plants in the Bilaspur cluster will probably be taking advantage of these washeries (CMA 1999: 17). USAID’s Clean Technology Initiative is developing a project to improve the energy efficiency and performance of the cement industry in two plants in Rajasthan, one in Gujarat, two in Madhya Pradesh and one in Tamil Nadu (CMA 1999: 30). The sector is considering the development of Voluntary Environmental Agreements with the government. Some of the industry has received prizes from the National Productivity Council and Energy Efficiency Awards from the Union Ministry of Power and the NCB energy efficiency Awards. While the large-scale sector is motivated towards modernisation, the small-scale sector is facing considerable difficulties.

3.3.3 Iron and steel

The iron and steel sector is seen as the backbone of a developing country and will need to grow over time. The growth will be facilitated by available resources, loans and export demand.49 However, the experience over the last ten years has been mixed (see Chapters 6 and 9).

The iron and steel sector is a sector that has been at the focus of government policy attention for several decades. India has large iron ore deposits (10053 Mt of heamatite and 3407 Mt of magnetite) spread through Bihar, Orissa, Madhya Pradesh, Maharashtra, Karnataka, Kerala, Goa, Andhra Pradesh, Rajasthan and Tamil Nadu (Ministry of Steel 1999: 20). The demand for iron and steel is growing and expected to show a similar growth in the future (see Chapter 6).

The key actors in the field are (a) the public sector undertaking Steel Authority of India Limited (SAIL)50, the private company Tata Iron and Steel Company Limited (TISCO)51, and some 19 new private sector entrants like ESSAR, ISPAT, JINDALS, 52 etc. and another 400 players in the field;53 (b) the Development Commissioner54 of steel, ministry

49 Meeting India 2000: 2 50 SAIL, with 4 plants and 2 captive power units per plant produces 12 Mt of steel (Meetings 2000: 2) and is the

10th largest steel producer in the world (Meeting India 2000: 31). 85% is owned by the Government of India. SAIL has another plant in Vishakapatnam (Rashtriya Ispat Nigam Limited) (Meeting India 2000: 4). SAIL was originally conceived to produce steel and had its own captive power plants. There was no real incentive to ensure energy efficiency. In the last few years SAIL came under heavy criticism because of poor quality steel rails sold to Indian Railways and poor quality bullet proof shirts and because of its financial losses (Meeting India 2000: 6). In order to compete in the new open market, SAIL has invested in new technologies, and since the government has decided to disinvest in the process of divesting in power, fertilizer and steel, SAIL has spent Rs 1200 crores in modernisation to use continuous casting and BOF casting. Thin slab casting is not yet used and strip casting is seen as not necessary. The aim of SAIL is to be one of the cheapest steel producing company in the world, but unfortunately has too many employees. SAIL has an Environment Management Group to supervise the emissions in each plant and treat the fuels (Meeting India 2000: 4 ).

51 TISCO is the oldest private sector steel company producing 3.6 Mt of steel annually (Meetings 2000: 2). Since liberalisation there are a number of new entrants Mukand Ltd. Sunflag Iron and Steel Co. Ltd. And Mahindra Ugine Ltd.

52 They reportedly use state of the art technologies to generate about 3.5 Mt of steel annually (Meetings 2000: 2). However, they have not invested wisely and so they are not doing very well.

53 Meeting India 2000: 31 54 The development commissioner of steel is responsible for collecting, processing and disseminating informa-

tion, monitoring regional supply and price trends and suggesting remedial measures, monitoring and advising on import and export, management and allocation of distribution to priority sectors (defence, railways, small scale industries Corporation, engineering goods export units, North-Eastern states), survey steel industry, ren-der assistance to EAF units and the secondary sector in terms of capacity assessment, procurement of indige-nous and imported raw material etc, interface between government and consumers, co-ordinate the movement of raw materials to steel plants and vigilance functions to prevent misuse of steel.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (109)

78

of steel and ministry of industry who provide the framework for decision-making, (c) the ministry of environment which adopts environmental norms, (d) the provincial governments that provide incentives for industry, (e) the Steel Consumers’ Council which is at present passive, (f) the Steel Exporters Forum,55 (g) Indofer – the federation of new companies, and (h) the banks that lend to this sector – including the Industrial Development Bank of India.

Figure 4.2 Actors in the iron and steel sector.

Pre 1990, the Department/ Ministry of Steel and the Ministry of Industry made policies, controlled pricing, production and distribution.56 The production was concentrated in three companies - SAIL (and its plants Indian Iron and Steel Company – IISCO), Rashtriya Ispat Nigam Limited (RINL) and TISCO - and although TISCO was more energy efficient than SAIL, neither was efficient. Both had captive power plants. The Indian iron and steel companies, like its Brazilian counterpart, was unable to modernise its technological base, as was undertaken in Korea, where the state through strategic interventions ensured the technological modernisation of the sector (D’Costa 1999).

Since 1991, the policy is in a state of transition. The key features of this transitional policy are:

­ Liberalisation: The New Industrial Policy of July 1991 exempted the sector from compulsory licensing and iron and steel was no longer reserved for the public sector. In May 1992, the industry was included in the list of high priority industries for automatic approval of foreign equity investment up to 51% (and today up to 74%). 19 new projects have been cleared since 1991 by the All India Financial Institutions.

­ Pricing: Pricing and distribution was controlled since 1964 by the Joint Plant Committee because of steel scarcity and the government wish to guarantee availability for defence and railways.57 Since 1992, price and distribution have been deregulated but the Development Commissioner monitors and allocates steel to meet the needs of small scale industries, exporters of engineering goods and the North

55 The Steel Exporters forum, established in February 1998, was set up resolve the common challenges faced by

all actors in the field in relation to export. It is chaired by the development commissioner and includes all pro-ducers, major consumers and key ministries (Ministry of Steel 2000: 16). An Institute for Steel Development and Growth (INSDAG) was set up in Calcutta with leading producers as members and focuses on reduced costs of power and raw materials for mini steel plants, strengthening of anti-dumping rules, etc.

56 Meeting 2000: 2, 4 57 Meeting 2000: 31

Min. of steel

Min. of Ind.

Min. ofEnv.

SteelConsumers

ForumSteel Exporters

Forum

Market

BanksSAIL

TISCO

New Co.

INDOFER

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (110)

An Asian Dilemma

79

Eastern region, defence and railways have access to steel (The Ministry of Steel 1999: 11).

­ Import regime modified: Prior to 1990 there was controlled import through licensing, foreign exchange control, canalisation and high import tariffs. This has been modified and import duties have fallen.

­ Freight equalisation: The freight equalisation policy that led to common prices for all states was withdrawn in 1992 and now states closer to the mines can access the iron at cheaper prices.

­ Levy: The levy on producers to contribute to the Steel Development Fund has been abolished since 1994.

­ Export-import policy: The Ministry of Commerce and the Ministry of Steel decide on export policy; both import and export is freely allowed and the process is monitored through a Duty Entitlement Pass Book. The government, however, imposes ceilings on the export of high grade ore which may be needed for the domestic market. Exports now include high grade products such as hot and cold rolled coils, colour coated sheets and GP/GC sheets.

The Ministry of Steel (1999: 8) now facilitates the steel production process and tries to provide guidelines. They have established:

­ A Management Information System to, inter alia, monitor steel production and supply;

­ An Empowered Committee to approve and support Scientific Research Programmes to provide direction to the research efforts on iron and steel. The focus is on improving the quality of steel products, utilising waste and reducing energy consumption;

­ Policy to promote and observe the energy conservation activities in each industry, with a specific focus on certain technology options;

­ Rules to promote Environmental Management and Pollution Control plans to achieve pollution control norms by the plants (Ministry of Steel 1999).

Many of the larger plants have undertaken large tree planting activities as part of their environmental policy.

4.3.1.2 Aluminium

India has the fifth largest alumina deposits (3037 Mt) in the world, with a potential to last for 350 years of use. Most of the deposits are in Orissa, Andhra Pradesh, Madhya Pradesh, Gujarat, Maharashtra and Bihar. There is growing demand for aluminium in a developing country like India in the sectors of construction, power transmission and distribution, aircrafts, space crafts, automobiles, kitchen ware, architectural fittings, grain silos, industrial explosives, defence and packaging.

The main actors in the sector are (a) the two public sector companies (NALCO58 and BALCO59), three private companies (HINDALCO,60 INDAL61 and MALCO62), and the

58 NALCO was established in 1981 to implement the Bauxite Alumina Aluminium project in Orissa with a ca-

pacity of 800,00. It has one smelter. It used technology from Aluminium Pechiney of France. It is a multiloca-tional greenfield project. It has bauxite mines in Panchpatmalli, an alumina refinery in Damanjodi, a smelter pant in Angul, a captive power plant in Angul and port facilities in Bizag. It used captive power of 3950 mil-lion units in 1998-99. They have been having problems in performance (see Chapter 8), but expansion plans are being developed. An energy audit has been done by TERI.

59 BALCO was established in 1965 and has an integrated Alumina/Aluminium Complex at Korba in Madhya Pradesh with a capacity of 200,000. It has one smelter. It uses Soviet technology. A second unit is in West Bengal. It has captive power production. BALCO is in the process of being privatised.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (111)

80

55 smaller extrusion companies that use aluminium ingots,63 (b) the ministry of Mines64 and the Ministry of Industry which provides the framework for decision-making, (c) the ministry of environment which adopts environmental norms, (d) the provincial governments that provide incentives and no objection certificates for industry, (e) Aluminium Association of India in Bangalore,65 (f) the banks that lend to this sector,66 and (g) the scientific centres – Jawaharlal Nehru Aluminium Research development and Design Centre JRDC in Nagpur67 and the National Environmental Engineering Research Institute (NEERI) in Nagpur (see Figure 3.3).

The policy for the sector is developed by the Department of Mines in the Ministry of Steel and Mines. Pre 1990, the central government made policies, and controlled pricing, production and distribution.68 The current government policy is to simplify the privatisation process. There are two major considerations. First, the plant should not be in urban areas, and second, it should not be in areas where the small-scale sector is flourishing.69 The sector is very diverse regarding the age and quality of technologies used, making it difficult to generalise. The industry has occasionally consulted companies like EIL for energy audits.70

HINDALCO

NALCO BALCO

INDALMALCO

55 smaller co.

Min. of Commerce

Min. of Mines

Min. of Industry

Min. of Environment

ProvincialMinistries

IDBI

State Banks

JRDC

NEERI

Figure 4.3 The actors in the aluminium sector.

The sector was highly regulated till 1989 and has been gradually deregulated with the rescinding of the Aluminium Control Order in 1991. The government has:

­ Set mutually acceptable targets in a Memorandum of Understanding with NALCO and BALCO;

­ Set excise duty on aluminium and aluminium products at 15%;

60 Hindalco (1999), a private company of BIRLA, is the largest single location integrated aluminium facility in

the world with an installed capacity of 350,000 in Renukoot in Uttar Pradesh. It has one smelter. They are the lowest cost producers in the world. It produces 44% of the Indian primary aluminium.

61 Capacity of 312,000 in Muri in Bihar and Belgaum in Karnataka. It has three smelters. 62 Capacity 50,000 in Madras in Tamil Nadu. It has one smelter. 63 Meeting India 2000:19 64 The main function of the Department of Mines is the survey and exploration of non-ferrous metals including

bauxite. 65 The AAI established in 1981 represents the primary producers extruders, fabricators, foundries, downstream

product manufacturers, reeseachers, technologies and R&D institutions. 66 Meeting India 2000: 16, 19 67 The JRDC focuses, inter alia, on the digestion efficiency and precipitation characteristics in the Bayer process,

reuse of waste material, benificiation of bauxite. 68 Meeting 2000: 19 69 Meeting India 2000: 44 70 Meeting India 2000: 17

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (112)

An Asian Dilemma

81

­ Set custom duty of 20% ad valorem; ­ Granted exemption from compulsory licensing; ­ Included aluminium in the list of industries where automatic approval of foreign

equity up to 51% is available to encourage foreign investment.

The aluminium industry has itself also taken some energy and environment related measures. NALCO has adopted a system of constant monitoring of specific energy consumption figures, it has taken energy conservation measures, conducts energy audits and is exploring the possibility of using renewable energy. All the units have ISO 140001 environment management system certificates. In total 5.3 million trees have been planted by the company. Its record has been so good that it has five major awards in this field.71 Also BALCO and Hindalco have taken energy conservation measures and undertake tree planting activities.

4.3.2 Households and Lighting

Light is a basic necessity in the industrial and household sector. Lighting accounts for 34% of peak power consumption and 17% of total power consumption in India (cited in Sastry and Gadgil 1996: 804), although only 30% of the 130 million households are presently electrified. Savings are possible through replacement of conventional lamps by energy efficient ones. However, since the initial costs are high and electricity is subsidised for certain groups of consumers, the consumers are averse to the such changes. This measure is very important for peak power planning, which in its turn is important since India mainly possesses base-load plants (Kedia 1997). Urbanisation is also likely to have an impact on electricity use. One estimate shows that if urbanisation shares double, then even if per capita income remains and industrialisation unchanged, energy including electricity consumption could increase by 45% (Jones 1991: 628).

The actors in the lighting sector are (a) the companies like Surya, Philips, etc. that are producing CFLs (b) the older companies producing conventional bulbs, (c) the households, (d) commercial consumers, and (e) the SEBs possibly. The standard in India is a maximum limit on power consumption for each rated wattage (see Figure 4.4).

Figure 4.4 The actors in the light bulb sector.

The variety of energy efficient lighting available in India is GLS lamps, fluorescent tubes, high and low pressure mercury and sodium vapour lamps, allied equipment like chokes, capacitors and domestic, industrial and outdoor fittings. There is not much technology for

71 The Gem granite environment award for 197-98, the Sitaram Rungta Memorial Social Awareness Award 197-

98, Polution control Excellence Award from the Orissa State Governemnt, Best Occupational Services Award for the state and Indira Priyadarshini Briskhamitra Award for 1994.

EElamp pro-

ducers

Otherprodu-

cers

Commercialconsumers

Householdconsumers

SEBs &govt.

ENGOs

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (113)

82

production of these lamps in India and hence modernisation calls for imports (Ministry of Industry 2000: 68-69).

In the urban household sector, cooking takes about 57% of the energy, space cooling 18%, lighting – 9%, water heating 7% and others – 9% (Srivastava 1997: 945 citing an in-house publication of 1988). In a study of 2000 households in Hyderabad, it was seen that although all the houses had access to electricity, the electricity supply was not stable and was subject to load shedding, voltage fluctuations and black outs. Most houses use about 30 different appliances for lighting, heating, kitchen gadgets and entertainment and electricity is one fourth of the total energy consumed. The average consumption per household is 90kWh and the per capita rate is 15 kWh. The average price paid was Rs. 1.10 kWh while the generation costs are Rs. 1.27/kWh. For the poorest households, energy costs about 14% of their income, for the richest – it is about 3%. As a result of the subsidies, the Andhra Pradesh State Electricity Board loses Rs 150 million in the city of Hyderabad alone and is in a financial crisis. Interviews with households reveal that the richer households would support price rationalisation, while the poorer households would need price support (Alam et al. 1998).

4.3.3 Water pumps for Irrigation

Another major consumer of electricity is the sector ‘water pumps’. Water pumps in particular consume 85% of total agricultural electricity consumption (Kirloskar Borthers 1999: 10). The number of pumps today in agriculture is about 15 million consuming between 25 to 40% of the national electricity, using energy inefficient technologies. (Kirloskar Brothers 2000). It is expected that this will continue to be a major consuming sector because of the importance of agriculture to the Indian economy, and the current heavy dependence on the rains. Electric pumps in general are driven by motors and drives and used in industries, municipal works, in agriculture and domestic situations (see 4.3.4).

The actors in this sector are (a) the millions of farmers, (b) the large companies like Kirloskar,72 Lubi, Texmo, Crompton Greaves, PSG, Unnati, Sabar and Kalsi, (c) the thousands of assemblers and repairers who make a living in this sector, (d) the state governments and the SEBs, (e) IREDA, REC and other state banks, (f) the Central Board of Irrigation and Power set up by government but now a professional consultancy73 (see Figure 4.5).

In 1969 the Rural Electrification Corporation (REC) was established to provide loans for rural electrification and in the last thirty years the number of electrified water pumps have multiplied and now provide enough water to increase the food production in India to meet the growing population of the country. This in itself is a tremendous achievement.74 There is no organised policy for this sector as a whole; although there have been some initiatives. The Government of India has adopted standards of IS 10804 for the system and the pipes that are meant to guide the sector.

72 Kirloskar pumps provides to about 45% of the market and exports to 32 countries. They expect a penetration

of 800,000 pumps per year for the next 20 years (Meeting India 2000: 13). 73 The CBIP established in 1927 has specialists in water and energy management and its purpose was to advance

knowledge and technical forecasting, undertake research and establish communication with the actors in the field. Although established by Government of India, today it is a private company.

74 Meeting India 2000: 5

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (114)

An Asian Dilemma

83

Figure 4.5 The actors in the water pump sector.

Charges to farmers for agricultural pumping vary from region to region. In Delhi, tube wells and threshers pay Rs 50 per kWh for a load up to 10 kW and farmhouses pay the same as domestic rates for a load up to 25 kW. In Punjab electricity for pumping is provided free. In Rajasthan there are minimum monthly charges for pumping, depending on the horsepower of the pump. In Uttar Pradesh there is a fixed charge per pump. In Madhya Pradesh, the charges are seasonal. In Maharashtra there is a minimum charge per pump (COPU 1998).

Non-electrified pumps use diesel and these too lead to the emissions of greenhouse gases, especially when the diesel (Rs 7 per litre) is then subsequently adulterated with kerosene (Rs. 2.70 per litre; cross-subsidised through higher prices on petrol) and this leads to reduced efficiency of the pump.75 Water pumps are used mostly by large and rich farmers, small farmers that work through cooperatives but not marginal farmers. Different parts of India use different systems. The technical options available for modernising this sector are in Chapter 6, and the institutional challenges are highlighted in Chapter 9.

4.3.4 Co-generation

Co-generation calls for the more efficient use of fuel by generating electricity and heat (at a useful temperature and pressure) simultaneously. Cogeneration of heat and power can take place at three different levels: at large scale power plants, at the level of industrial parks (serving different plants) and at the individual plant level. At the individual plant level, there is a theoretical potential for cogeneration of 6500-8000 MW in the sugar, alcohol, paper, rice paddy, iron and steel, fertiliser, petrochemical, paper, aluminium and cement sectors (76 ; http://www.nic.in/indmin/india.htm). More than 50% of this potential is located in the sugar industry.

The policy in this sector is made by the Ministry of Non-Conventional Energy Sources (MNES). The Ministry of Non-Conventional Energy Sources has established a National Programme on Bagasse-Based Cogeneration in January 1994 offering several incentives which have been quite successful (Dadhich 1997, Gupta, A. 1997). A number of government supported initiatives are underway. These aim at optimising generation of surplus power for the grid from sugar mills. A large capacity is already established or under construction (see Chapter 6). Use of advanced technologies such as Biomass Integrated 75 Meeting India 2000: 6, 24 76 Meeting India 2000: 8, 26

large co.’s

assemblers

CBIP

Millions offarmers

Min. ofIndustry/

Agriculture ?

Min. of Environment ?

ProvincialMinistries

SEBs

State Banks

IREDA

REC

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (115)

84

Gasification-cum-Gas Turbine Combined Cycle which would enable production of almost twice the useful energy from the same biomass, is also being explored. A revised policy document is expected in 2002.77

The field is not very well defined and the actors are diffuse. There are research institutes promoting the issue (e.g. TERI), implementing companies (e.g. WINROCK International)78 the confederation of Indian Industry, and there are some industries interested, and potential lending agencies.

Cogeneration in the sugar industry: Except in 1998-99, with only 2.7% of the land under sugar cultivation India has been the world’s largest producer and consumer (12%) of sugar in the world. With the increase in consumption growth, population growth and junk food production, the industrial use of sugar will go up. Sugarcane is the most profitable commercial crop in India. In the 9th plan there was a 5.6% increase expected in the sugar industry. However, in other parts of the world sugar growth is stabilising; and some countries are developing high fructose corn sugar in the chemical industry as a sugar substitute. Nevertheless, it is expected that in 20 years the sugar industry will double, because of the increased demand, and the de-licensing of the sector from 1998.79

The sugar sector is interested in cogeneration and there are many identifiable actors in this sector. These include the (a) sugar industry80 and its (b) cooperatives81 producing 60% of the sugar, the (c) MNES, the (d) provincial governments that provide incentives, (e) the State Electricity Boards that need to make power purchase agreements, (f) the potential and actual lenders like the Rural Electrification Corporation82 (see Figure 4.6).

Figure 4.6 Actors in the sugar cogen sector.

The internal power of the sugar sector was always met through cogeneration. The key is-sue now is: can they improve their efficiencies to such an extent that surplus electricity will be generated which can be sold? In 1992 the sugar industry produced 150MW of

77 Meeting India 2000: 8 78 WINROCK International is funded by USAID to do technical assistance in this area and they promote capacity

building in this sector and the in-plant training. They complement the work of the MNES. The bagasse based plants usually have a plant load factor of 70-75%; the GEF funded plants have a PLF of 80% (Meeting India 2000:15).

79 Meeting India 2000: 38 80 The sector consists of about 250 mills of which 125 are in Maharashtra and the rest are in Karnataka, Gujarat,

Tamil Nadu and Uttar Pradesh (Meeting India 2000: 15, 30). 81 Each cooperative has from 5000-150,000 members, farmers, with a little bagasse. 82 Meeting India 2000: 5

cooperatives

producers

Min. ofIndustry/

Agriculture ?Min. of NCES

ProvincialMinistries

SEBs

State BanksIREDA

REC

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (116)

An Asian Dilemma

85

electricity. It has been estimated that around 3500 MW of additional power could be pro-duced if all of the sugar mills switched over to modern techniques of cogeneration (Gupta, A. 1997 or 1987). Since then the number of units and the size of the sector has gone up. In 1992 the MNES set up a scheme to subsidise demonstration cogen plants. However not much happened in practice. There was difficulty getting grants from the MNES.83

The sector is however convinced that there is considerable potential if they can sell the electricity to the grid. “The problem is the sugar industry is not doing very well at present and there is a shortage of funds in the sector. The Clean Development Mechanism or the Global Environment Facility could play a role in this sector. But the government must take the decision here. The CDM should also offer a financial rebate.”84

Box 4.4 State policy on cogen Maharashtra, which produces more sugar than Australia, has 130 mills, 128 cooperatives and 2 in the

private sector.85 For the cooperatives, equity has been a major bottleneck in developing cogenera-tion here, but the state government has very good policies.86 Maharashtra had its first cogen project in 1991. Since then they have encouraged all new mills to add a boiling house for cogen; and have invested in old mills and made deals with the SEB so that power can be sold at Rs 2.60 per unit. About one dozen units are in operation producing at 10 MW capacity; some have a capacity of about 25-30 MW. There is a state cooperative federation; and all the cooperatives have a Research and Development Institute with 120 scientists and technocrats. They focus on (a) continuously de-veloping the sugar cane, (b) developing machinery, (c) the use of by-products for cogen and alcohol based products, and (d) training. “Our experience with the paper mills is that it is not competitive for us. We cannot create enough bagasse to supply continuously for the paper mills, and so the best use of the bagasse is cogen.”87 However, although Maharashtra has good policy, there are few Inde-pendent Power Producers that are willing to take on the job of generation using the bagasse. The government offers 25% of the investment if a IPP comes in. It will provide free electricity to the sugar farmer if he can provide electricity all the year round by augmenting the bagasse in some way.88

Gujarat has no active policy implementation in this field.89 Uttar Pradesh has tried to encourage cogen, but the UPSEB pays too little and too late.90 It decided that if it pays within a month of the pay date, it should get a rebate of 2 ½ % instead of having to pay a fine!!!

Tamil Nadu has a good policy and payment system.91 The first two projects in Tamil Nadu demon-strated the possibility of increasing the efficiency and making profits in the sugar sector. In Tamil Nadu, the TNSEB was willing to pay for the electricity generated by the Cooperative Sugar Mills. For the private sector this is a win-win situation if they can get a power purchase agreement with the SEBs. In the case of Tamil Nadu, the MNES lent straight to the State Government to invest in this field, because TEDA only looks at wind energy and biomass assessment. For the cooperative sector it makes sense to collect their bagasse and sell it to an Independent Power Producer; the risk then has to be taken by the IPP and they see the potential in this sector. But there are not that many IPPs in this sector yet. The technologies for bagasse cogen are available in the country.92 Tamil Nadu agreed to give us Rs 2.25 against a base year of 94-95. There is an escalation of 5% per year.93

83 Meeting India 2000: 38 84 Meeting India 2000: 38 85 Meeting India 2000: 23 86 Meeting India 2000: 30 87 Meeting India 2000 88 Meeting India 2000: 15, 27,38 89 Meeting India 2000: 30 90 Meeting India 2000: 15, 27 91 Meeting India 2000: 27 92 Meeting India 2000:15 93 Meeting India 2000: 38

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (117)

86

4.3.5 Motors and drives

Motors and drives are used in all industrial sectors as well as the agricultural sector and household appliances, in the form of pumps, fans, blowers, compressors, cooling etc. Motors consume 74% of all industrial electricity use and a substantial part of agricultural and residential use.

There is no institutional framework as such in the sector – motors. The key actors in this field are the (a) large companies like Kirloskar (33% of the market), Crompton Greaves, NGEF (New Government Electrical Fittings), Kawat, Bharat Bijli, Siemens, ABB, Jyoti, GEC Alstom, (b) the Motor Manufacturers Association (MMA) in Bombay which represents 60% of the market, (c) the remaining 20% of non-branded motor manufacturers and assemblers consisting of about 474 companies (Kirloskar Brothers 1999: 10; 94), (d) industrial sectors, (e) consumers, (f) the ministry of industry, and (g) provincial government policy. Most of the large companies have technical tie-ups with foreign companies and most of the motors are produced through local research. The CII and the Motor Manufacturers Association have prepared manuals on motors.95

large co.’s MMA

assemblers

Min. ofIndustry

Min. of Environment ?

ProvincialMinistries

State Banks

Industry

Figure 4.7 The actors in the motors and drives sector.

The policy is that motors need to comply with Bureau of Indian Standards and that a motor should be capable of delivering its rated output with a voltage variation of + 6% and frequency variation of + 3%. India manufactures motors, transformers and generators using ISI standards which are parallel to IEC standards especially during the last ten years.96 The ISI has a variety of standards for different classes of insulation and motors – from grade A to F. Most small manufacturers are using grade E while the bigger manufacturers use some high standard.97

4.3.6 Analysis

The lack of progress in the energy conservation process in the different sectors can be attributed to (a) the absence of a comprehensive conservation policy; (b) lack of conservation awareness in medium and small industries; (c) weak financial incentives; (d) shortage of trained manpower and demonstration centres, (e) poor energy pricing policies

94 Meeting India 2000: 11 95 Meeting India 2000: 27 96 Meeting India 2000: 11 97 Meeting India 2000: 11, 28

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (118)

An Asian Dilemma

87

and subsidised electricity prices; (d) poor information and promotion programmes; (e) the cost and reliability of efficient technological options; (f) weak markets and the lack of competition and social and political consideration (Shukla 1993 or 1995, Kedia 1997). The technological options for each sector are discussed further in Chapter 6, and Chapter 9 examines the stakeholder perceptions in more detail.

4.4 Rural Issues

“One long-term policy that serves the objective of sustainable development is the promotion of rural development (Adballa 1994: 34). The bulk (70%) of the Indian population lives in rural areas. 43% of the rural population lives below the poverty line. Only one-third of the total electricity supply is consumed in the rural areas, despite three-fourths of the population living in these areas. The rest of the rural energy demand is met by fuelwood, dung cakes, crop residues, oil, LPG, CNG and coal.

The main actors involved in rural electrification are the farmers, the SEBs, the Rural Electrification Corporation that lends for such projects and the Central Institute for Rural Electrification.98 The Rural Electrification Corporation is empowered to make loans to the State Electricity Boards for the purpose of financing such electricity projects.

Rural electrification was prioritised in the 1970s and 1980’s. Since the 1980’s, rural electrification in India has not received much attention. Rural energy is used for agricultural operations, domestic activities like cooking,99 lighting and industry (pottery, flour mills etc.). At present these needs are met in general by fuelwood, human energy, kerosene, bullock energy, and electricity (Reddy 1999). In terms of consumption, the villages use electricity primarily for water pumps and lighting (see 4.3.2). Govinda Rao (1997) argues that 35% of the electricity is used by agricultural pumpsets which consume 25%-40% more energy than efficient pump sets. In India, rural electrification100 was translated into grid extension to villages. Government policy aimed at full electrification of all villages starting from the concept of one connection per village. “Rural electrification is an ongoing process. It begins with the provision of an electric connection to a village and as the demand for the load increases, the provision of load to the village has to be augmented and so the village is helped to develop. Village electrification does not thus come to an end. It provides services for basic uses and over time moves on to provide services for more sophisticated uses” explained an interviewee. The government aims to electrify all the 5,87,000 villages of the country. At present 86% of the villages (5.04 lakh villages) have access to electricity, and only about 31% of the rural households use electricity. About 81,000 villages are yet to be electrified and 76 million rural households still do not have access to electricity. Only about 15,000 villages qualify as remote or inaccessible. The remaining 65,000 lack electricity because of the lack of resources at the state level and the poor functioning of the SEBs.

98 The Rural Electrification Corporation is a financial institution that lends money to the SEBs if a proposed pro-

ject is viable for the express purpose of intensification and augmentation of the electric supply to the rural ar-eas. They finance the particularly weak financial borrowers. The Government is the only share holder.

99 Cooking, a major consumer of energy, but not electricity, uses mostly biomass. In 1984-85, the Ministry of Non-Conventional Energy Sources initiated a programme to improve the thermal efficiency of chulhas by 20-25%. However, improved cook stoves only penetrated 15% of the households (Parikh et al 1999: 539-544; Srivastava 1997: 945).

100 This was previously defined as “A village is classified as electrified if electricity is being used within its reve-nue area for any purpose whatsoever”. This definition has now been modified to: “A village will be deemed to be electrified if electricity is used in the inhabited locality within the revenue boundary of the village for any purpose whatsoever.” The data in this section is based on the old definition.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (119)

88

The maximum number of pumpsets energised by REC projects in a state by 1999 was 1.3 million in Andhra Pradesh, 1 million in Madhya Pradesh and the least was 29 pumps in Manipur (REC 2000: 44).

Rural electrification is a challenging issue since people in rural areas can generally not afford to pay for the electrification. Thus the process of rural electrification begins as a process to provide villagers services and a chance to escape from the poverty trap. Why is rural energy important? Because, world-wide 1.7 billion people live without electricity and basic lighting facilities. Because the needs of the poor need to be taken into account to guarantee less rural urban migration on the one hand, and better quality of life for the villagers. However, centralised systems of electricity generation while suitable for supply to concentrated populations, may not be suitable for dispersed housing across the land.

Rural electrification thus far has been successful to the extent that India is now self-sufficient in food grains. However, it has not been successful in jolting the village economy out of its stagnation. Further, the inability of the villagers to pay coupled with populist policies of state governments led to financial crises in the state electricity boards thereby hampering the modernisation of these Boards. What are the reasons of such failure and what does this mean for the future policy? Foley (1992b) argues that rural electrification does not cause development. He argues that only when a rural area has reached a certain degree of development and needs electricity should it be provided. Hence, he is opposed to subsidies for rural electrification, since this will never lead to a sustainable system. Areas suitable for electrification are those that have infrastructure, there is agricultural output, evidence of production, clustering of villages, improving income standard and plans for developing the region (Foley 1992b: 146). He concludes that it is not the principle of rural electrification that is the issue but the timing and level of resources that should be devoted to it.

On the other hand, this view is rejected by many from the developing countries that argue that there are many reasons for providing electricity and subsidising it for an initial set of years. Ranganathan (1993) explains that there are four rural electrification theories/ perceptions. The commodity perspective argues that rural electricity is only affordable in rich countries and income determines the demand for energy. From this perspective providing rural electrification in poor countries is an economically unviable proposition. The production input perspective argues that rural electrification can contribute to the production process of a particular rural economy. From this perspective, rural electrification helps a village to produce the products it is already producing. However, the key question here is: Does electricity demand arise from the need, or does electricity supply lead to growth? The idea of rural electricity as infrastructure implies that rural electricity can lead to secondary benefits by bringing down the costs of production. This means that if the village authorities decide to develop street lights etc., as part of the service they offer to villagers, this will bring down the costs of the electricity that is provided to the villagers since the costs of extending the grids will already have been borne by the village authorities. Here, the theory argues that if rural energy is included with other infrastructural needs, this will help to promote growth. Finally, rural electricity can be seen as a means to meet basic needs and as a means of redistributing income. In such a system the electricity is provided as part of a free package to villagers to improve their living conditions. The government of India approach has been to provide at least one connection to each village and as demand increases to try and meet the demand.

However, none of these theories suggest ways to develop an electrification scheme that becomes self-sufficient in the long run. Hence, theorists argue that if rural electricity is to pay back in the long-term, it needs to be part of a system which provides complementary inputs to the system. Rural electrification tends to fail because either there is (a) good

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (120)

An Asian Dilemma

89

demand but poor pricing, (b) low manifest demand but high latent demand,101 (c) entry barriers, (d) time lag before the demonstration effect operates, (e) lack of complementary inputs, (f) poor load factor and distance from the grid. If you provide electricity for rural industry then the costs of street lights and housing is only incremental. This makes it attractive in comparison to the alternatives to electrification. The problem is that utilities are adopting a loss minimising approach rather than a profit maximising approach (Ranganathan 1993: 148). This means that rural electrification should be a part of rural development planning and not a part of rural electrification planning. Reddy (1999) argues that rural energy systems must be economically efficient, need-oriented and equitable, self-reliant and empowering, and environmentally sound. This means that it must help to alleviate poverty, and improve the physical quality of life (PQOL) and the human development index (HDI). He argues that this means that the focus should be on energy services for cooking, water, lighting, transportation, employment and income generation and large improvements in HDI can be achieved through small energy inputs in the early stages of development. The focus should also be on poverty alleviation via improving the HDI so that the humans have the basic conditions and needs met and can move towards income generation. Reddy argues that there is need to harness the ‘blessing of the commons’, where individual interests can add up to community interests at the village level. He suggests that this means closing substance cycles at village level, and that systems should be biomass based, accessible, affordable and safe. He argues that solar home systems and PV systems are too expensive and elitist for the rural poor. However, if the PV systems are used to finance commercial activities in the village they may become viable in the long term (see Box 8.2).

It is not just the philosophy of how to provide electricity to rural areas that is of relevance, but what kind of electricity. Till recently the focus has been on grid based electricity. But as the villages are becoming more and more remote, the question is are there alternatives? Sinha and Kandpal (1991) calculate that the costs of electrifying these villages will be much higher since these are by definition more remote. On the basis of several assumptions in relation to transmission and distribution losses (35% in rural areas), with low load factors and the costs of thermal power (which ranges from Rs. 0.538kWh to Rs 0.317kWh), they calculate on the basis of several studies that the price of renewable energy is likely to range from 1.33 kWh to 35.41kWh. Solar pond costs Rs 6.80 per kWh, photovoltaic 19.98 and dish stirling Rs 5.0 per kWh; wind turbines of of 5, 8 and 10 CUF cost Rs. 35.41, 22.13 and 17.71 per kWh.

The authors conclude that for villages about 15 km from the 33 kVgrid with a peak demand of 10kW, diesel and biomass based technologies become cost-effective for all load factors. Solar thermal becomes competitive at a load factor below 0.9. Wind becomes competitive when the load factor is 0.05 and the turbine can generate 700kWh per kW of rated capacity per year. These systems may become competitive in Orissa and the North Eastern States. India is already implementing perhaps the world's largest solar photovoltaic programme for decentralised applications in rural and remote areas. About 425,000 systems aggregating to 30 MW have been installed. These include stand alone village, home and street lights; water pumps for drinking and irrigation; and , an extensive programme on solar lanterns. Appropriate integration of locally available renewable energy sources, is being attempted for total and continuous supply of electricity in the villages (Gupta, A. 1997).

101 The demand for energy (and hence electricity) is difficult to calculate. Some studies calculate such a demand

on the basis of 510 kcal or 2.13 MJ daily per person. There are no empirical studies showing an increase in energy consumption per household in the rural areas. The emphasis is thus on energy needs, a normative is-sue, as opposed to consumption, a factual issue (Sinha and Joshi 1997: 132).

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (121)

90

Kishore (1997) classifies renewable energy technologies for rural areas into four categories. The first category includes technologies that have achieved a high degree of maturity in the developed countries such as PV systems, wind electric generators, solar thermal power plants, biomethanation systems. The second category includes technologies that have achieved a high degree of maturity in India such as solar water heaters, solar cookers, wind pumps, small-hydro turbines, biomass briquetting machines, biomass gasifiers, improved metal stoves and biogas burners. The third category consists of potentially suitable for future commercialisation while the last category consists of technologies that could specially benefit the rural areas such as family sized bio-gas plants. In the case of biogas, Abdalla (1994: 32) argues that these technologies are available in the developing countries and should be used to the utmost.

Reddy (1999: 3442) argues that electricity development in rural areas would include biomass based generation, internal combustion engines coupled to generators in the short-term, biomass based generation through microturbines and IGCC turbines, PV, wind, small hydro and solar thermal in the medium-term and fuel cells for base load power in the long-term. He also shows that there is potential for cogneration through internal combustion engines in the near term, and micro turbines and integrated gasified combined cycle turbines in the medium term.

In the specific context of off-grid electricity to remote areas, the issue becomes more complicated. While on the one hand, it is precisely in these areas that renewable energy becomes competitive with non-renewable energy, this does not mean that it becomes affordable especially to the people in such remote areas. A remote area by definition is so far away from the rest of the country, that frequently there are no other good transportation or infrastructural facilities available to the people in these areas. This implies that the villagers may not be in a position to either afford such electricity or to maintain such infrastructure. For a renewable energy project to work, it needs to be combined with other infrastructural and institutional support. This makes it all the more vital to heed the warnings issued above as to the kind of criteria that must be satisfied if village electrification is to work and become self-sustaining.

On 3 March 2001, the Chief Ministers and/ or Power Ministers of the different states met in Delhi and decided that rural electrification may be treated as a Basic Minimum Service under the prime minister's progremme - Gramodaya Yojana. The states aim to complete rural electrification by the end of the 10th Plan in 2007 and all households should have a connection by 2012. This programme is to be funded partly through the Rural Development Programmes and partly through special financing for remote villages.

4.5 Analysis: First round of institutional policy options

This chapter has been an extremely complicated exercise since everything, the organisations, the laws, the policies, and the society is in a state of flux and change. For the purpose of this analysis, we divide the analysis into four periods (pre-1990 and transitional solutions, problems in the interim period and post 2000), four categories (organisational, technological, economic, and social) and three issue areas (power supply, demand side management, and rural issues).

In the pre-1990 period, the key organisational issues were the gross size of the problem,102 the lack of clarity in the division of responsibilities between centre and state and between

102 The sheer size of India, the population, the diverging social, political and management cultures, the division

into states and union territories, its population and its financial problems make it much more difficult to de-velop a manageable and efficient system in India. This problem had been initially dealt with by the Constitu-tion of India by ensuring that the centre and the state had concurrent responsibility on the issue.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (122)

An Asian Dilemma

91

different organs at both levels.103 There was also government monopoly in electricity generation (with few exceptions). The tendency towards monopolisation especially at the state level of the sector led to lethargy and indifference to consumer interests, discouragement of captive power generation by taxing producers and discouragement of cogeneration. There was also vertical integration, bureaucratic control and lack of accountability. Curiously however, the PLF is better in central power plants than in state run power plants and in private power plants. The technological factors included the poor quality of coal and the high ash but low sulphur content, the inefficient plant load factors, the high transmission and distribution losses, the poor quality of technologies in use (see Chapter 6), and the low maintenance and renovation. In terms of economic and fiscal policy, there was neglect in investment in many sectors, an irrational pricing policy, controlled pricing in other sectors, poor collection of revenues and bankrupt state electricity boards.

The end-use sectors, such as the iron and steel and aluminium sectors were under strong government control; they were monopolies with administered prices and had captive power plants. The water pump sector was heavily subsidised (or not; see Chapter 8). Cogeneration was not encouraged. Rural electrification meant the extension of a connection to each village.

In the transition period, the government liberalised the electricity sector, encouraged coal and technology imports, retrofitting of existing plants, and a gradual phase-out of subsidies and price rationalisation. It also liberalised several end-use sectors and tried to encourage demand side management.

In implementing the policy, there have been many challenges. Bureaucratic inertia and political instability104 have delayed implementation, technology imports were not always cheaper than domestic substitutes, the private sector was not forthcoming to invest in the electricity sector105, and the gradual phase-out of subsidies and price rationalisation is not politically easy. Electricity theft continues as although energy availability increased by 4.2%, 75% of the increase was stolen. The increase in tariffs have ironically made theft more attractive. The per capita consumption of electricity has gone down from 336 units to 334 units in 1996-97. The PLF of plants may be going down. Demand management is inadequate and the population has reached the 1 billion mark. The increase in public sector generation has been low in this decade and the private sector generation also dismal (Neogi 2000). Neogi argues that “islands of change if attempted in isolation, will not work till corporate traditions for conduct of business are established”. As the Chairman of PFC (2000: 4) put it: “India suffers from a 1/3rd shortage syndrome. On a long term basis only 2/3rd of planned generation gets implemented; and only 2/3 of the capacity is generated and of the generated electricity only 2/3 rd reach the consumer. Only 2/3rd of the power supplied is billed and so there is shortage of finances in the sector.”

103 For example there is an absence of a commercial and administrative mechanism to regulate the inter-regional

sharing of power; there is lack of synchronisation between generation and transmission facilities. The Naptha Jhakri Transmission System was completed in October 1999, although the Naptha Jhakri Hydro Electric Pro-ject will only be completed in December 2001 (Singh 1997).

104 ASSOCHAM (1999) argues that a key problem is that the politicians are not functioning. In the Lok and Ra-jya Sabha bills pend for a long time from 7 months to a year; New bills are yet to be put on the agenda. Court disputes take about 20 years to resolve.

105 Because of the bureaucratic problems and the lack of financial guarantees from the SEBs, the number of clearances required to set up a private power plant, the long negotiations needed for key projects like the Power Purchase Agreement and the Fuel Supply Agreement. For example, while ENRON jumped into the fray, it discovered soon that the government was not yet ready to deal with privatisation, and there have been relatively few takers in the following months.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (123)

92

Nevertheless, a number of policies and laws are being developed and implemented. Three energy bills are pending before Parliament. A number of new decisions have been taken to end theft and rationalise tariffs. The key conclusions that emerge from this chapter are as follows:

First, the organisational, institutional, legal, policy and market framework relevant for the electricity sector is in a state of structural change since 1990. At the same time, the changes are being resisted by the people whose livelihoods are affected and are being hampered by the constantly changing governments in power in the last decade. This change amidst the continuity makes it difficult to predict how soon or fast actual change will be visible in the sector. Although major structural change is on the way, we maintain that although some states find themselves well into the transformation stage, others may still be in the pre-1990 stage in terms of the actual situation in these states.

Second, what is amply clear is that a large number of measures have been taken in the energy supply side to rationalise the sector, to make it more cost-effective and efficient, which will help to reduce the greenhouse gas emissions per unit of generation since 1990. These measures include new laws such as the Coal Beneficiation Rules in 1996, the amendments to the Indian Electricity Act, the establishment of the Electricity Regulatory Commissions Ordinance, the Electricity 2000 Bill, the Renewable Energy Bill and the Accelerated Power Development Programme, as well as policy measures like the liberalisation of generation and distribution, the unbundling of the State Electricity Boards and the liberalisation of the investment rules and banking regulations. The decision to connect the regional grids will also lead to improvements in efficiency of electricity use.

Third, although end-use efficiency improvement is a relatively new concept, the liberalisation of the cement, aluminium and iron and steel sectors, the de-licensing rules, the modified pricing policy, the establishment of management information systems, conservation and environmental guidelines, the adoption of the Energy Conservation Bill, the promotion of cogeneration, indicates major structural upheaval in the consuming sector. The increasing desire of large scale industry to conform to ISO standards and the pressure from the consumers means that in this sector too the efficiency of electricity use is being actively promoted and this will have an impact on the greenhouse gas emissions.

Fourth, although in theory the rural sector is mostly electrified, electrification has yet to reach the rural homes. This is a major bottleneck that stands in the way of rural development. An integrated approach to rural development and electrification is necessary for this sector to develop. However, extension of the grid may be relatively more expensive than local grids based on renewable energy sources. To make these economically viable and affordable they have to be based on local sources, need to substitute existing unsustainable practices and need to lead to commercial gains for the villagers. The development of the rural areas may lead to an inevitable increase in electricity: the challenge is to find affordable ways of developing an environmentally and economically viable source of electricity.

These are all very promising developments and imply that the greenhouse gas emission level of India is already below a business-as-usual level from the 1990 base year level and projections (see Chapter 5).

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (124)

An Asian Dilemma

93

Table 4.2 The key issues affecting the electricity sector.

Pre-1990 problems Post 1990 policies Problems in the interim period

Policy options for beyond 2000

Power supply Organisational Problem size,

lack of clarity in the division of responsibility government monopoly in production

New administrative structure; unbundling of SEBs generation, transmission, and distribution activities, establishment of CERC and SERC;

Political delays bureaucratic inertia; teething problems; resistance from employees in some states, unbundling is in different stages in different states; valuing the assets of SEBs difficult; privatisation process slow and problematic

Learn from success stories and challenges; Continue with policy on organisational change; privatisation per sé is not the answer, increasing accountability is; need for bureaucratic “unfreezing”/institutional “unlearning”; Renewable Energy Bill; Electricity 2000 Bill

Technological poor quality of coal; inefficient plant load factors; transmission losses; poor technologies in use

coal imports; technology development and imports; retrofit existing plants; reduce transmission losses

expense of the coal/gas imports; imported technologies not always cheaper than comparable domestic technologies;

Import rationalisation: when does it make sense? Need to develop a clear institutional framework to support technology cooperation;

Economic/Financial lack of investment in grid; irrational pricing policy; bankrupt SEBs; high cost of loans

Increasing privatisation of the sector to increase investment; gradual phase-out of subsidies and price rationalisation; liberalisation of banking sector

Few interested parties in privatisation because SEBs could not provide guarantees and the bureaucratic hassles price rationalisation and subsidy phase-out not easy; interest rates are still quite high

Simplification of bureaucratic procedures; foreign company investment code; prioritisation of options; Develop policies to scrutinise contracts with foreign companies; prioritise rational pricing through CERC/SERC

Socio-economic Electricity theft/distribution losses poor energy literacy in industry poverty of consumers

Audits; compulsory metering in some areas;

Policy implementation slow

Metering and billing by 2002; Compulsory energy auditing; Public relations campaigns; making the distribution sector viable

End-use efficiency improvement Organisational

Too much government control on cement, iron and steel and aluminium; Too little attention to quality of water pumps and household appliances like lighting; and cross-sectoral issues like motors and drives, cogeneration;

Liberalisation of cement, iron and steel and aluminium sectors; reduction of price and production controls; encouragement of the private sector and competition; Policy to encourage cogen through, inter alia, demonstration projects; Energy Management Cell

Political delays bureaucratic inertia; teething problems; small enterprises unable to cope; government corporations have difficulty in changing attitudes; cogen takes of in sugar industry slowly – problem with power purchase and payments

Continuation of the policy change process. Need for policies on water pumps and motors and drives. Need for a proper and empowered agency focusing on electricity conservation. Need to push cogen further and simplify power purchase agreements; Energy Conservation Bill

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (125)

94

Pre-1990 problems Post 1990 policies Problems in the interim period

Policy options for beyond 2000

Technological (see chapters 6 and 7 for more details)

Out-dated technologies in use in most sectors; Where modern technologies used, operation and maintenance a problem;

Encouragement of new technology use; Cement sectors use modern technologies

Import expenses, some technologies available domestically, but not used because of social factors; foreign technologies expensive

Need for clear technological standards and incentives for both the large and small scale industry; adoption and implementation of the new Energy Conservation Bill

Economic/Financial Poor investment, collapse of some government enterprises, lack of incentives, price of electricity high for industry, need for captive power, lack of incentives for agriculture since price of electricity too low. Bank loans expensive

Restructuring of pricing policy; dedicated lending institutions.

Cost of domestic loans too high; slow changes in pricing policy

Need for restructuring the financial sector, incentives for energy and environment efficient industry; use of CDM to finance projects; policies to reduce electricity theft by end-use sectors thereby making incentives to invest in energy efficient technologies

Socio-economic poor energy literacy in industry; poverty of consumers

Rural energy Active policy to

connect villages to the grid; high subsidies

Policy to gradually reduce subsidies, and make the sector more market oriented

Reducing subsides difficult

A more integrated approach to rural energy needed that can cope with low purchasing capacity and relatively high latent electricity demand; need for renewable energy for remote areas

4.6 Summary

This chapter has presented the institutional framework, the laws, policies, and used the analysis that emerges from the literature. It has shown that the policy is in a state of flux, and there have been a number of legal, organisational and policy changes that have been promoted and these are expected to lead to reduced greenhouse gas emissions as compared to a business-as-usual scenario when drawn from 1990 onwards.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (126)

An Asian Dilemma

95

5. Business-as-Usual Scenario

Authors: Carolien Kroeze and Christiaan Boudri106

5.1 Introduction

The previous chapters illustrate that China and India are countries with rapidly growing economies undergoing a process of structural change. Demand for electricity is expected to increase as a result and this may have an effect on the environment. In later chapters of this report we will evaluate the feasibility of technological and institutional options in the process of modernising the electricity sector in China and India. For such an analysis a reference scenario is needed that describes the development of power generation, electricity demand, and electricity losses, including their relation to socio-economic development.

For this project, a reference scenario was found in the Regional Air pollution INformation System (RAINS-Asia), which is an integrated assessment model for acidification in Asia (Amann et al., 2000; Foell et al., 1995; Shah et al., 2000). The fact that this model offers the most detailed energy scenario presently available for these two countries is enough justification to take its Business-as-Usual (BAU) scenario as a basis for the Asian Dilemma-reference scenario.

In 1995, a base case scenario for RAINS-Asia was developed in 1995 by combining efforts of research institutes of participating Asian countries, the International Institute for Applied Systems Analysis (IIASA) (the originator of RAINS), and RMA (the developer of the energy module in RAINS-Asia). This work has consequently been accredited by the World Bank. An update of this 1995 scenario has been realised in the year 2000 in the framework of additional RAINS-Asia work. This update includes revised projections for the use of renewable energy sources. Here we refer to the updated scenario as the RAINS 2000 BAU-scenario. This scenario is described in detail in Amann et al. (2000), TERI et al. (1999) and Boudri et al. (2000a). We interpreted the RAINS 2000 BAU scenario, so that it could be used as a basis for our analyses.

The RAINS Business-as-Usual (BAU) scenario is an energy database including estimates for fuel use in 48 regions in China and India, for the period 1990 – 2020. Traditional, as well as non-traditional fuels are included in the scenario, as well as a number of end-use sectors. Thus the scenario is based on many assumptions needed to derive estimates for different sectors, fuel types and regions, from available information for the years 1990 and 1995 (and sometimes 1980 as well), and, on the other hand, assumptions on the development of this information in time. Research institutes of several Asian countries provided information and were involved in the scenario construction (Foell et al. 1995). For the RAINS 2000 scenario, use has also been made of national statistics for 1995 from IEA. Final data transformation was done at IIASA.

In this chapter we first describe the RAINS-Asia 2000 BAU-scenario and the assumptions underlying it (Section 5.2) (based on Boudri et al., 2001). The description focuses on social and economic driving factors underlying energy use projections, the fuel input categories, and the assumed energy intensity. Part of the chapter is a description of the Regional Energy Scenario GENerator (RESGEN), which was used to develop scenarios for RAINS-Asia. More information on RESGEN can be found in Foell et al. (1995) and 106 This chapter has been written on the basis of Boudri et al. (2001) and with comments from Joyeeta Gupta,

Jaklien Vlasblom and Kornelis Blok.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (127)

96

the RESGEN User’s Guide. Section 5.3 focuses on the electricity sector, and presents the BAU scenario for electricity generation as used in our study.

5.2 Business-as-Usual scenario: total energy use in China and India

5.2.1 Introduction

Starting point for our analysis are RAINS Business-as-Usual (BAU) scenarios for future use of fuels in China and India revised as of 1999. This implies that the scenarios have taken policies plans for the period up to 2020 that were developed during the nineties into account. The scenarios cover the period 1990 – 2020 and are based on demographic and economic trends for the Asian region as envisaged during the late nineties. The scenario illustrates that China and India are countries with rapidly growing economies undergoing a process of structural change. Population and economy are assumed to drive fuel use and related emissions of air pollution (Box 5.1).

Before we go into the details of the scenario used in our analyses, we would like to introduce the model for which the scenario has been developed (RAINS-Asia). RAINS is an integrated assessment model for acidification in Asia. It has the same structure as the European version of RAINS (Alcamo et al., 1990). In Europe, integrated assessment models have been used during international negotiations on transboundary air pollution policies (Tuinstra et al. 1999). The models provided national governments with a full regional picture of the problems associated with the entire causal process from energy systems and emissions through to the ultimate impact on natural and on man-made systems. In Asia, acidification is not yet a serious problem, but this may change as economies are developing quickly.

In 1992 the World Bank commissioned several research institutes to develop an assessment model for acidification in Asia (Foell, et al. 1995; Shah et al., 2000). As a first step for the integrated assessment of air pollution in east- and south-east Asia, RAINS-Asia confines itself to the acidification problem, primarily caused by emissions of sulphur dioxide (SO2). RAINS version 8.0 consists of three modules: the emission-cost module (EMCO), an acid deposition and ecosystems impact module (DEP), and an optimisation module (OPT). In the earlier versions of the model, the energy scenarios fed into RAINS were from the Regional Energy Scenario GENerator (RESGEN). The most recent version of RAINS runs separate from RESGEN, but the energy scenarios are still largely based on RESGEN projections. RAINS-Asia can be used to explore future trends in fuel use in 94 regions in Asia, and calculate the resulting acidifying deposition on a grid basis. Furthermore, the model includes information on sensitivity of ecosystems to acidification.

RAINS-Asia takes 1990 as the base year and has time intervals of ten years in the analysis, extending through the year 2020. The thirty-year horizon is consistent with the five- to ten-year implementation periods for major energy facility investments (e.g., power plants) (Foell et al. 1995). The energy scenarios are derived from simple representations of the relations between the policy input variables of the modules (e.g., economy development for the energy module, annual emissions of the atmospheric module and deposition for the impact module) and the output variables (annual emissions of the energy module, deposition of the atmospheric module and protection of an ecosystem for the impact module). For the final implementation of the integrated tool, these simple relationships are then connected with each other into an overall assessment framework allowing the comparative analysis of alternative energy and emission reduction strategies for acidifying compounds.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (128)

An Asian Dilemma

97

A number of databases were developed, including a socio-economic database (RESGEN), energy database, fuel characteristics database, and large point source database. These databases include information for the year 1990 and projections for future years up to 2020 (Foell, et al. 1995; Shah et al., 2000).

The RESGEN module estimates present and future energy supply and sectoral energy consumption for a wide variety of socio-economic and technological assumptions (Legler et al., 1996). It incorporates an elaborate database on energy demand and supply for the 94 Asian regions for the base year (1990) and necessary information to develop regional and Large Point Source (LPS) energy consumption scenarios up to the year 2020. However due to the regionalisation process, the estimates are rough.

The scenarios contain six end-use energy sectors: residential, commercial, industrial, transportation, agriculture, and non-energy use of fuels, and two energy conversion sectors: electric utilities and non-electric energy, such as petroleum refineries. It includes policy strategies such as increasing the efficiencies of energy use, fuel switch to fuels with low sulphur content, or implementing emission control measures. RESGEN permits the user to examine, at the sectoral and spatial level, the effects of energy demand changes and energy supply management policies. For details we refer to RESGEN and RAINS background documents (Foell, et al. 1995; Shah et al., 2000; Legler et al., 1996).

After 1995, two important changes to the RAINS database have been made: the development of new scenarios for the use of renewable energy, and an updated projection of primary energy consumption on a national level. We refer to the resulting scenario as RAINS 2000 BAU-scenario, and this will be the basis for the rest of our study.

The RAINS 2000 BAU scenario includes projections for use of renewables from a study of the potential for use of renewable sources of energy in China and India (Boudri et al., 2000a). Renewable energy consumption in China and India has been estimated on a regional basis for various fuel categories for the year 1990, and projections have been made for the years 2000, 2010, and 2020 for two different scenarios: a Business-as-Usual (BAU) and a Policy Scenario (TERI, et al. 1999; Li, et al. in prep; Panwar et al. in prep). The BAU projections are based on extending short term policies and trends to 2020 including considerations on sustainability, existing institutional barriers, and economic constraints. Thus the BAU scenario reflects what the researchers of the project in 1999 regarded as the likely autonomous penetration of renewable energy sources in the absence of additional policies. We therefore consider this scenario to take into account the effect of policy plans as of 1999, as well as some additional constraints on the consumption of fuel wood to a sustainable level.

The RAINS 2000 BAU scenario includes projections for total fuel use that differ from the 1995 versions of the scenarios. The updates are reported in Amann et al. (2000) and Boudri et al. (2000a). The revisions of the scenarios for use of conventional fuels for China was based on estimates supplied by the Chinese Energy Research Institute (ERI, 1999). For India, the Tata Energy Research Institute (TERI) provided a revised projection of conventional energy demand in aggregated form (TERI, 1999) that was used as a basis of the RAINS 2000 BAU scenario.

The energy system in China and India is highly dominated by coal in the BAU scenario, in line with current trends. The scenario takes into account the effect of policy plans on renewable energy as of 1999. The governments of China and India aim at decreasing the use of biomass (fuelwood mainly) as a fuel for sustainability reasons. For other sources of renewable energy policies exist on increased used.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (129)

98

Box 5.1. The Business-as-Usual Scenario The RAINS Business-as-Usual scenario is based on extending short term policies and trends to 2020

including considerations on sustainability, existing institutional barriers, and economic constraints. The scenario we use here was developed in 1999, and therefore reflects what the involved re-searcher institutes regarded as the likely autonomous penetration of fuel types in the absence of ad-ditional policies. This implies that the scenarios have taken policies plans for the period up to 2020 that were developed during the nineties into account.

The scenario covers the period 1990 – 2020 and is based on demographic and economic trends for the Asian region as envisaged during the late nineties. It includes estimates for different types of fuels used in six end-use sectors and 48 regions in China and India, for the period 1990 – 2020. Tradi-tional, as well as non-traditional fuels are included in the scenario.

The BAU scenario illustrates that China and India are countries with rapidly growing economies un-dergoing a process of structural change. The countries are experiencing rapid industrialisation, while agricultural output remains stable. The contribution of the services sector to the total eco-nomic production is assumed to increase during the coming decades, while industry will decline slightly. The assumed projections of regional economic growth have been derived through the RAINS-Asia Energy Network. The economic recession in 1998-2000 has been incorporated in the BAU scenario. The projections for population GDP, primary fuel use and CO2 emissions is well within the range of SRES A1 and B1 scenarios for Asia (IPCC, 2000). The BAU scenario is there-fore consistent with long term scenarios based on low worldwide population growth and relatively high worldwide economic growth.

Fuel use increases with economic growth in the BAU scenario, albeit at a slower rate. The efficiency of the power sector is improving in the BAU scenario and results in part from reduced transmission and distribution losses and from replacement of inefficient power plants by more efficient plants. The scenario ignores a possible gap between electricity demand and supply.

5.3 Socio-economic developments

5.3.1 Population

In the RAINS 2000 BAU scenario, the population in China increases by 30% from 1146 million people in 1990 to 1500 million in 2020 (Table 5.1). For India, the increase is 50% (from 850 million in 1990 to 1297 million in 2020). Projections for population growth are available for three time periods: 1990 to 2000, 2000 to 2010, and 2010 to 2020. The 2000 scenarios are an update of the previous 1995 scenarios (Table 5.1). For China, the revised estimates are similar, but for India a lower growth is estimated, resulting in a 300 million or almost 20% smaller population in 2020 than in the 1995 scenario. The most recent projections for both India and China may differ slightly from the population projections used here.

Regional population scenarios are also available (although not shown here) and based on projections of the annual growth rates. Since no internationally recognised sources were available when the scenarios were constructed, these projections were obtained through the RAINS-Asia Energy Network. Regional growth rates have been derived from the national values.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (130)

An Asian Dilemma

99

Table 5.1 Population of China and India according to RESGEN 1995 (as used in the RAINS 1995 scenarios) and RAINS 2000 (Foell et al., 1995; Amann et al., 2000). Unit: millions and % increase per year.

Source 1990 Growth 1990-2000

2000 Growth 2000-2010

2010 Growth 2010-2020

2020

China RESGEN 1995 1172 1.2% 1324 0.9% 1453 0.6% 1535 RAINS 2000 1146 1.3% 1300 0.7% 1400 0.7% 1500 India RESGEN 1995 847 2.2% 1048 2.1% 1294 2.1% 1597 RAINS 2000 850 1.9% 1021 1.3% 1166 1.1% 1297 Asia RESGEN 1995 2938 1.7% 3464 1.5% 4009 1.3% 4573

5.3.2 Gross Domestic Product

At the time that the 1995 scenario was constructed, many countries in Asia were experiencing rapid industrialisation, while agricultural output was stable. For the next few decades it has been anticipated that the contribution of the services sector to the total economic production will rise, and industry will decline slightly. Values for growth of gross domestic product (GDP) have been derived from region-based economic projections, accounting for different regional levels of economic growth and industrialisation. The projections of regional economic growth have been derived through the RAINS-Asia Energy Network.

In the RAINS 2000 BAU scenario, the GDP in China may grow by a factor of 7.5 between 1990 and 2020, and in India by a factor of 5.8 (Table 5.2). The RAINS 2000 projections for China are marginally higher than the earlier RAINS 1995 projections, resulting in a 2% higher national GDP in 2020. The economic recession in 1998-2000 has been incorporated in these projections. In India, GDP development is in the RAINS 2000 scenario expected to be slower than in the RAINS 1995 scenario, resulting in a 3.5% lower GDP in the year 2020 (transport not included). The main reason for the reduction seems to be the industrial sector, for which the projected growth rate in the 2000 scenario is considerably lower than envisaged in the 1995 scenario. The GDP of the commercial sector is also a few percent lower than in the 1995 scenario, and agriculture somewhat higher.

Table 5.2 Gross domestic product (GDP) in China, India and Asia according to RESGEN 1995 (used in RAINS 1995 scenarios) and RAINS 2000. Unit: million US$1990 and % increase per year.

Source Sector 1990 Growth 1990-2000

2000 Growth 2000-2010

2010 Growth 2010-2020

2020

Industry 0.1 6% 0.2 3% 0.2 5% 0.3 Agriculture 0.1 8% 0.3 6% 0.6 5% 1.0 Other 0.8 12% 0.3 8% 0.6 6% 1.0

RESGEN 1995

Total 0.3 9% 0.7 6% 1.4 5% 2.4

China

RAINS 2000 Total 0.3 8% 0.7 7% 1.4 6% 2.4 Industry 0.1 5% 0.1 4% 0.2 4% 0.2 Agriculture 0.1 4% 0.1 7% 0.2 7% 0.4 Other 0.1 10% 0.2 7% 0.3 7% 0.6

RESGEN 1995

Total 0.2 7% 0.4 6% 0.7 6% 1.3

India

RAINS 2000 Total 0.2 6% 0.4 6% 0.7 6% 1.2 Industry 0.3 4% 0.5 2% 0.6 6% 1.1 Agriculture 1.7 4% 2.7 4% 3.9 4% 5.8 Other 2.5 5% 4.0 4% 6.0 4% 8.6

Asia RESGEN 1995

Total 4.6 5% 7.1 4% 10.6 4% 15.5 Source: Foell et al. (1995); bold data derived from TERI et al. (1999)

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (131)

100

5.3.3 Regional differences

RAINS and RESGEN distinguish between 48 regions in China and India and there are considerable differences between these regions in population density, GDP and fuel use. In the following, we highlight some of these differences, based on information from RESGEN. The regional patterns in the RESGEN 1995 scenarios are the basis for the regional patterns in the RAINS 2000 BAU scenario.

5.3.3.1 China

Regional differences in China are much larger than in India. Agricultural growth ranges from 2% per year for Fujian to 26% in Taiyuan for the period 1990-2000. Also in the periods thereafter large differences occur, with even negative growths between 2000 and 2010 for Shenyang (-2.7% per year) and between 2010 and 2020 for Shandong (–7.5% per year). The ratio of agricultural GDP in 2020 to that in 1990 ranges from 1.1 to 23, with city regions like Tianjin, Beijing, Guangzhou, Guiyang, Taiyuan, Shanghai forming the top six (ratios between 10 and 23). Shandong brings up the rear with 1.1, and most other regions have ratios between 2.5 and 6.3.

Commercial growth between 1990-2000 is between 0.5% and 14% per year (with the exception of Yunnan, where it is 37%) but is estimated to diverge much less in the coming periods: 7.6 – 10% per year between 2000-2010 and 4 – 7% between 2010-2020. Commercial GDP in 2020 is 5 - 18 times as high as in 1990. Top growth regions are Shandong, Jiangsu, Hunei, Guizhou, and Guangxi. Shenyang, Guangdong-Hainan, Beijing, Jiangxi, and Fujian have relatively low ratios.

Industrial growth between 1990 and 2000 is 3–14% per year, and is, similar to the commercial sector, expected to diverge less in the coming decades: 4 – 7% per year between 2000 and 2010 and 5-7% between 2010 and 2020. The ratio of industrial GDP in 2020 and that in 1990 ranges from 4 to 13. It is remarkable that most city regions, like Shanghai Guiyang, Wuhan, Tianjin, Shanxi, Beijing, Shenyang, Guangzhou, and Chongqing are not expected to grow above average (ratios 2020/1990 of 5 to 7). Taiyuan is the only city region with high growth (ratio 2020/1990 of 13).

5.3.3.2 India

For India, RESGEN assumes that the agricultural growth is the same in all regions: 5% per year during 1990-2000 and 3.6% from 2000-2020. Exceptions are the city regions Calcutta, Madras, Bombay – where a growth of about 6% per year is assumed – and New Delhi, where agriculture is ignored.

Commercial growth is 10% per year from 1990-2000 for all Indian regions, except the city regions Calcutta, Madras, Bombay, where it is about 6 - 6.5 % per year. For the period 2000-2020 the difference is smaller: about 7% per year for most regions, and about 6% for the city regions Calcutta, Madras, and Bombay. Commercial GDP in 2020 is about 9 times as high as in 1990 for provincial regions, as well as for the city region New Delhi, 6 times in Calcutta, Bombay and Madras.

In the industrial sector, annual growth is 3.5% from 1990-2000 and 6.8% from 2000-2020 for most regions and for the city region New Delhi, whereas for the city regions Calcutta, Madras, Bombay, these values are 6 - 6.5% for the period 1990-2000; and about 6% per year for the period 2000-2020. Commercial GDP in 2020 is about 5 times as high as in 1990 for provincial regions, as well as for the city regions New Delhi, Calcutta, Bombay and Madras.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (132)

An Asian Dilemma

101

5.3.4 Total fuel use in the RAINS-Asia BAU scenario

Tables 5.3 and 5.4 present projections for fuel use in China and India together with the assumptions on population and GDP growth underlying the RAINS 2000 BAU-scenarios. Also the national energy-related emissions of CO2 are presented. Table 5.5 and Table 5.6 present the estimated energy-related SO2 emissions for the two countries. The way energy and emission scenarios have been derived will be discussed in some detail below.

In the RAINS BAU scenario, demand for primary energy in China increases from 36 EJ in 1990 to 82 EJ in 2020 (an 125% increase relative to 1990; Fig. 5.1). In India, the increase is 150%, from 16 EJ in 1990 to 39 EJ in 2020 (Fig. 5.2). In both countries, coal is the most important fuel used (Table 5.5 and 5.6). In 1990 about 20% of the fuels use is for electricity generation and in 2020 about 35%. Also in electricity generation fossil fuels are the most important energy source in China and India. However, there is a considerable increase in generation from non-fossil sources. In China, this is mainly large hydro, nuclear, and renewable energy sources. In India it is large hydropower and bagasse. In both countries the consumption of gas will increase. The projections for nuclear power in India are not consistent with policy plans; in the BAU scenario electricity production in nuclear plants is assumed to decrease after 2000, while policy plans aim at increased capacity (see also chapter 7).

As described above, the socio-economic assumptions for China for the period 1990 – 2020 include a 30 percent growth of population and a 7.5-fold increase in GDP (Table 5.3; see Boudri et al., 2000a). For India, the projections are based on a more than 50 percent increase in population accompanied by an 5.8-fold increase of GDP (Table 5.3; see Boudri et al., 2000a).

These scenarios assume that electricity supply follows the increase in electricity demand, and that there is no gap between demand and supply. In reality, however, the actual growth in electricity supply may lag behind changes in electricity demand. This may especially be the case in India, where demand for electricity has been exceeding supply (Ministry of Power, 1999; see chapter 4). Our BAU scenario ignores the possibility of such a lag, which may lead to an overestimation of the growth in electricity supply.

In China, the use of biomass is expected to decline by almost 19%. Other renewable energy sources (hydropower, wind, etc.) will largely increase their contribution and will thereby lead to almost 500% higher overall consumption of renewable energy, or an increase in primary energy share from 3% in 1990 to 9% in 2020. Although the increase of renewable energy will more than compensate the decrease in use of biomass, the share of biomass, large hydro, and other forms of renewable energy in total fuel use reduces from 26% to 17% (Table 5.3).

Also in India the use of biomass is expected to decline by almost 12%. Other renewable energy sources (hydropower, wind, etc.) will largely increase their contribution and will thereby lead to a 300% higher overall consumption of renewable energy, or an increase in primary energy share from 3.7% in 1990 to 6% in 2020. Although the increase of renewable energy will more than compensate the decrease in use of biomass, the share of biomass, large hydro, and other forms of renewable energy in total fuel use reduces from 53% to 23% (Table 5.3).

From the RAINS BAU scenarios described so far, we have derived BAU scenarios for the electricity sector (see chapter 5.4). Before we present the details of these electricity sce-narios, we would like to highlight some of the underlying features of the RAINS scenar-ios on electricity generation.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (133)

102

Figure 5.1 Final and primary energy consumption in China by sector in the BAU scenario. Note: Total conversion losses include all losses from primary to final energy (including elec-tricity use by power plants, transmission and distribution losses, etc.); Non-energy in-cludes use of fuels for other purposes than combustion

Figure 5.2 Final and primary energy consumption in India by sector in the RAINS 2000 BAU sce-nario. Note: Total conversion losses include all losses from primary to final energy (in-cluding electricity use by power plants, transmission and distribution losses, etc.); Non-energy includes use of fuels for other purposes than combustion

5.3.4.1 Electricity use by power plants and transmission and distribution losses

In the RAINS BAU scenario, gross electricity production in China is projected to be 2800 TWh in 2020, while the electricity by end-users amounts to 2393 TWh (Annex 5.1). For India gross electricity production is estimated at 1504 TWh in 2020 and end-use at 1250 TWh.

These differences between the amount of electricity used by end-users and the gross electricity production in a country reflects the net effect of transmission and distribution

Energy consumption in China

0102030405060708090

1990 2000 2010 2020year

EJ/

year

ConversionlossesIndustry

Domestic

Transport

Non-energy

Energy consumption in India

10

20

30

40

50

1990 2000 2010 2020year

EJ/

year

Conversionlosses

Industry

Domestic

Transport

Non-energy

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (134)

An Asian Dilemma

103

(T&D) losses and energy use in the electricity generation process (own use). More specifically, the difference is due to (1) transmission and distribution losses for fuels produced by the fuel conversion sector, (2) own-use of electricity and heat by the fuel conversion sector, (3) own-use of electricity and heat by the industrial auto-producers of electricity and heat, (4) own-use of electricity and heat by centralised power plants and district heating plants, and (5) electricity and heat transmission and distribution losses.

We can also distinguish between technical and commercial losses of electricity. In our scenarios, transmission and distribution losses include only the technical losses of electricity that take place during transportation of electricity from the power plant to the end-user. However, there may be commercial losses as a result of electricity tap by non-paying end-users. This is a problem in India (see chapters 4 and 8). The phenomenon of electricity tap makes it difficult to judge the technical and economic potential to improve the efficiency of the power system. Technical, social, economic, and institutional aspects are closely linked and complicate the issue. Non-paying electricity users are, for example, not sensitive to economic instruments aiming at improving the end-use efficiency. Likewise, efficiency measures for the supply-side may have a longer pay back time.

The own-use consumption and T&D losses are relatively high in many developing coun-tries in Asia, including India and China. In the RAINS-ASIA 2000 scenario it is assumed that there is some improvement in China and India over time. For China the scenario shows a decrease from 24% in 1990 to 15% in 2020 (Annex 5.1). For India, the total of own-use and T&D losses in the RAINS 2000 BAU scenario is assumed to decrease from 24% of gross electricity production in 1995 to 17% in 2020. (These percentages from the original BAU 2000 scenario presented in Annex 5.1 may differ to some extent from our interpretation of the scenario described in chapter 5.4).

For China, the BAU scenarios assumes closure of small power plants, in line with current policies; in the middle of the 1990s the Chinese government planned an improvement of the electric power sector consisting of hardware upgrades and employment, and software improvements. Closure of old and unreliable units is also part of this program (UNDDSMS 1996) and these are replaced by new and more efficient plants (Xinhua News 2000; Vlasblom 2000: 17, 18, 20). As a result, the BAU scenario already reflects a considerable efficiency improvement with time. In India, closing of small power plants is not considered in present policy plans, because the capacity is needed to meet the demand for electricity and because of employment considerations. In India the focus of improving the electricity system is more focused on improving the efficiency of the existing system.

5.3.4.2 LPS scenarios

The RAINS-Asia model identifies 355 Large Point Sources (LPS) at 332 unique locations. Eighty percent of the LPSs are located in three countries: China (133), India (47), and Japan (19). Area-source electricity production is assumed to be generated by small, dispersed plants or plants having low SO2 emission characteristics, e.g. hydro, nuclear, natural gas, and some oil-fired plants (Foell et al., 1995).

For the power generation sector, data were gathered on the location and fuel consumption at specific generating facilities. The size and location of coal-fired power generating facilities was obtained from Mannini, et al. (1990). Locations and types of oil-burning power generation facilities were obtained primarily from UN and IEA sources. Emissions calculated for these individual emission sources were assigned to their specific grid cells and were subtracted from the national emission total for power generation. Once all power generation emission sources had been identified and located, the remaining non-point source emissions were allocated to grid cells on the basis of population shares (Foell et al. 1995).

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (135)

104

For the RAINS-Asia 1995 scenario, LPS scenarios have been derived from the RAINS-Asia Energy Network, (Mannini, et al. 1990; ADB 1993; Maude, et al. 1994). In general, the RAINS-Asia project team judged expansion possibilities of existing plant sites (Foell et al. 1995).

For the new RAINS-Asia 2000 scenario, LPS scenarios have been modified, due to a change in the end-use scenarios, as well as a higher penetration of renewable energy sources. As one of the constraints in the construction of the scenario was that only area sources could be replaced by renewable energy sources, a large amount of electricity generated from LPSs was moved to the category area sources. The changes have been carried out on the basis of expert judgement by IIASA (see Amann et al. 2000). The consequence of this modification is that the definition of LPS is no longer strictly valid. Area sources can contain plants of more than 500 MWe.

5.3.5 Greenhouse gas emissions

5.3.5.1 Emission factors used

We estimate emissions of carbon dioxide (CO2), methane (CH4) and nitrous oxide for total fuel use (this chapter) and for fuels used for electricity production (later chapters). Our estimates include emissions taking place during combustion processes. For methane we also include emissions during the production and transport of fuels. For CO2 and N2O we assume that emissions taking place before fuel combustion are negligible. The emissions are estimated following the IPCC Guidelines for National Greenhouse Gas Inventories (IPCC 1997), unless mentioned otherwise. For the scenario calculations on the electricity sector in later chapters aggregated emission factors are used as presented in Annex 5-6.

Emissions of CO2 are calculated on the basis of the IPCC Reference Approach (Tier 1 method; IPCC 1997). For China, estimations on carbon content have been provided by ERI; for India, default IPCC values have been assumed. Multiplying this by the fraction of carbon oxidised, gives the CO2 emission factor. It is important to note that the fraction used here is a default value. In the scenario calculations other values may be used, e.g. if a change of coal combustion technologies is considered (see also IPCC 1997). Where possible, country-specific emission factors were used.

Disregarding the uncertainty in the carbon content of fossil fuels, the IPCC Reference Approach provides an upper bound to CO2 emissions, because carbon that is emitted as CH4, carbon monoxide (CO), or non-methane VOCs is included in the emission factor. Because we calculate CH4 emissions separately, we have corrected the CO2 emission factors to avoid double counting.

CH4 and N2O emissions from fuel combustion have been calculated on the basis of IPCC Tier 1 method (IPCC, 1997).

For methane we not only estimate emissions from fuel combustion, but also emissions from venting of natural gases from coal mining and handling, and emissions from flaring of natural gases. The IPCC recommends global average CH4 emission factors of 10 to 25 m3/ton of coal mined for underground mines, and 0.3 to 2 m3/ton for surface mines (not including post-mining operations). For post-mining activities, another 0.9 to 4.0 (coal from underground mines), and 0 to 0.2 (coal from surface mine is recommended; IPCC 1997). For the calculations in the present chapter, an intermediate value has been taken of 10 m3/ton of hard coal mined, which is equivalent to 350 kg/TJ. Emissions of CH4 from lignite mining have been ignored.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (136)

An Asian Dilemma

105

For fugitive methane emissions from oil and natural gas production, no clear recommendations were available in 1997. On the basis of (Houghton et al. 1997), estimations should lie between 1 and 7 kg/TJ for oil, and between 156 and 436 kg/TJ for gas. For the calculations in the present chapter we have chosen intermediate values of 4.1 kg/TJ for oil and 300 kg/TJ for gas.

It is assumed that biomass energy sources are produced on a sustainable basis, so that CO2-emissions from biomass burning are not included in the calculations. However, CH4 and N2O emissions from biomass used as fuel have been included.

5.3.5.2 Emissions

For China, we calculate that CO2-equivalent emissions of CO2, CH4 and N2O from fuel use increase from 2.5 Pg CO2-equivalents in 1990 to 5.7 Pg in 2020 (Table 5.3). About one-third of these emissions are from the power sector. Carbon dioxide is by far the most important greenhouse gas emitted from energy use in China, contributing by at least 90% to total energy-related emissions.

For India, we also calculate an increase in CO2-equivalent emissions of CO2, CH4 and N2O from fuel use: energy-related emissions increase from 0.7 Pg CO2-equivalents in 1990 to 2.6 Pg in 2020 (Table 5.4). The power sector contributes by about 40% to these emissions. Like in China, carbon dioxide is by far the most important greenhouse gas emitted from energy use, contributing by at least 87% to total energy-related emissions.

Our calculations indicate that the power generation sector in China is the second-most important source of energy-related greenhouse gas emissions (following the industrial sector), and in India the power sector is the main contributor to energy-related greenhouse gas emissions (Fig. 5.4).

5.3.5.3 Comparison with other studies

Our calculated emissions for China and India are in line with estimates by Amann et al. (2000) and Boudri et al. (2000a). For India, our estimates for 1990 (0.7 Pg CO2-equivalents) and 2020 (2.6 Pg) are somewhat higher than the 0.5 Pg (1990) in India´s Na-tional Greenhouse Gas Inventory (www.ccasia.teri.res.in/country/india/ ghg/tables.htm) and the 2.3 Pg (2020) estimated in the ALGAS project. These differences may result from the underlying socio-economic assumptions, the emission factors used or from the fact that we also include emissions of methane during the production of natural gas, which may be not included in other inventories.

We also compared the BAU scenario to the IPCC SRES scenarios. There are four groups of SRES scenarios. Of these, most of the A1 and B1 scenarios assume a population in-crease in Asia of about 40% between 1990 and 2020, which is in line with the BAU as-sumptions (30% for China and 50% for India). The other SRES scenarios show higher population growth. The population in India and China is about 70% of the population of the SRES Asia region. The SRES A1 and B1 scenarios assume that 2020 GDP in Asia is 5 – 12 times (A1) and 3.5 – 12 times (B1) the 1990 level while the BAU scenario assumes a 7.5 (China) and 5.8 (India) fold increase. The 2020 primary fuel use in China and India is 2.3 times the 1990 level in the BAU scenario, respectively, while the SRES A1 and B1 scenarios show a 1.5 – 8 fold increase. Emissions of energy-related CO2 in the BAU sce-nario from India and China are about 65% of the estimated SRES emissions for the year 1990. The SRES A1 and B1 scenarios estimate that 2020 emissions are 1.5 – 5 times the 1990 level. Thus the increase in population, GDP, primary fuel use and CO2 emissions is well within the range of SRES A1 and B1 scenarios for Asia. The BAU scenario is there-fore consistent with long term scenarios based on low worldwide population growth and relatively high worldwide economic growth.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (137)

106

Table 5.3 Demand for primary energy (EJ) and emissions of the greenhouse gases (GHG) CO2, CH4 and N2O (Pg CO2-equivalents) for China in the RAINS 2000 BAU scenario. Modified from Amann et al. (2000) and Boudri et al. (2000a)1.

Fuel 1990 1995 2000 2010 2020 Coal 21.2 28.1 33.1 37.7 42.1 Biomass 8.3 8.6 7.9 7.3 6.7 Oil 4.5 6.4 8.5 11.8 15.6 Gas 1.0 1.9 1.9 4.8 7.9 Hydro 0.8 1.8 1.7 3.0 4.7 Nuclear - 0.1 0.1 1.1 2.2 Renewable 0.4 0.5 0.7 0.9 2.3 Total 36.2 47.2 54.0 66.7 81.5 Of which for electricty production3 7.7 12.7 14.0 19.5 28.3 GDP (1990=100) 100 153 224 431 754 Population, million 1146 1209 1300 1400 1500 Total GHG 2.5 3.3 4.0 4.9 5.7 GHG from power (%)2 25% 31% 28% 26% 32% CO2 (%)2 90% 90% 91% 91% 92% 1 Differences are due to including CH4 and N2O, excluding Hong Kong from fuel and emission esti-mate and use of more detailed emission factors 2 Percentage of total energy-related GHG emissions 3 Annex 5.2

Table 5.4 Demand for primary energy (EJ) and emissions of the greenhouse gases (GHG) CO2, CH4 and N2O (Pg CO2-equivalents) for India in the RAINS 2000 BAU scenario. Modified from Amann et al. (2000) and Boudri et al. (2000a)1

Fuel 1990 1995 2000 2010 2020 Coal 4.4 6.0 7.2 10.5 15.7 Biomass 7.8 8.3 7.2 7.0 6.8 Oil 2.4 3.1 4.5 7.3 10.7 Gas 0.5 0.7 1.0 1.9 3.5 Hydro 0.6 0.7 0.7 1.4 2.2 Nuclear 0.1 0.1 0.1 0.1 0.0 Renewable 0.0 0.0 0.0 0.1 0.2 Total 15.6 18.9 20.7 28.2 39.1 Of which for electricity production3 3.6 5.4 6.4 9.4 14.6 GDP (1990=100) 100 138 181 327 582 Population, million 850 937 1021 1166 1297 Total GHG 0.7 0.9 1.1 1.7 2.6 GHG from power (%)2 37% 45% 43% 39% 40% CO2 (%)2 87% 88% 90% 92% 93% 1 Differences are due to including CH4 and N2O, and use of more detailed emission factors 2 Percentage of total energy-related GHG emissions 3 Annex 5.2

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (138)

An Asian Dilemma

107

Table 5.5 Emissions of SO2 by fuel in China1 in a scenario assuming no emission control. Unit: million tons.

Fuel 1990 1995 2000 2010 2020 Coal 19.7 22.6 26.8 30.7 34.7 Oil 0.5 0.6 0.8 0.9 1.0 Other 0.6 0.8 0.7 0.8 0.9 Total 20.8 23.9 28.3 32.4 36.7 1 Source: NOC scenario from Amann et al. (2000); including Hong Kong

Table 5.6 Emissions of SO2 by fuel in India1 in a scenario assuming no emission control. Unit: mil-lion tons.

Fuel 1990 1995 2000 2010 2020 Coal 2.3 3.2 3.8 5.5 8.1 Oil 1.2 1.4 1.8 2.7 4.4 Other 0.3 0.4 0.3 0.4 0.5 Total 3.7 5.0 6.0 8.6 13.0 1 Source: NOC scenario from Amann et al. (2000)

Figure 5.3 Emissions of CO2, CH4 and N2O from fuel use in China, as calculated for the RAINS-Asia 2000 BAU Scenario.

Sectoral GHG emissions in China (excl. Hong Kong)

1

10

100

1000

10000

1990 2000 2010 2020year

Mt

CO

2-eq

./yea

r

Total GHG-emission

Conversion +Losses

Power generationand districtheating

Industry

Domestic

Transport

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (139)

108

Figure 5.4 Emissions of CO2, CH4 and N2O from fuel use in India, as calculated for the RAINS-Asia 2000 BAU Scenario.

5.4 The Business-as-Usual scenario for the power sector

5.4.1 Description of the BAU scenario

So far, we have given an overview of existing RAINS scenarios for total fuel use in China and India. In this project, however, we focus in particular on the production of electricity. RAINS scenarios include information on fuel use for electricity production by region and by year. From these RAINS scenarios this, we know that total electricity production in China and India may increase considerably during the coming decades (TERI et al., 1999; Boudri et al., 2000a; see section 5.2). In the following, we interpret the RAINS scenarios in such a way, that it allows for an analysis of options to reduce emissions of air pollutants from the power sector in China and India in Chapter 7.

Partly based on RAINS information and partly based on other information on power generation in China and India, we estimate the fuel use and electricity production for fossil and renewable fuels:

Et,c,l = Ct,c,l * cft,c,l * u (5.1)

Ft,c,l = Et,c,l / eft,c,l (5.2)

Where

C = total capacity (MW) E = gross electricity production (PJ/year) F = demand for primary energy for electricity production (PJ/year) cf = capacity factor (fraction)

Sectoral GHG emissions in India

1

10

100

1000

10000

1990 2000 2010 2020

year

Mt

CO

2-eq

./yea

r

Total GHG-emission

Conversion +losses

Powergeneration

Industry

Domestic

Transport

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (140)

An Asian Dilemma

109

ef = electrical efficiency (fraction) u = full load power generation factor = 8.76 * 3.6 = 31.54 PJ/MW/year = 31.54 109

sec/year indices t = fuel type c = capacity class of power plants (MW); only for coal/oil fired power plants l = lifetime class of power plant (building year); only for coal/oil fired power plants

The demand for primary energy reflects primary energy equivalents that are defined as

­ the net calorific input of fossil fuels or biomass (equal to the input in tons multiplied by the net calorific value), expressed in PJ, or

­ an equivalent amount of primary energy for processes without direct fuel consumption (wind, geothermal, hydro, nuclear, etc.,) in accordance with the convention adopted in United Nations Statistics. For electricity producing facilities (both grid and non-grid connected) this is: 1 PJ of primary energy equivalent = 0.38 PJ of gross electricity produced. For heat producing facilities, this is: 1 PJ of primary energy equivalent = 1 PJ of gross heat produced.

5.4.1.1 China

For natural gas, nuclear power and renewables, the information was largely taken from the RAINS 2000 Business-as-Usual scenario as described in TERI et al. (1999) and Boudri et al. (2000a).

For coal and oil-fired power we subdivided the RAINS information into classes of power plants of varying capacity (c) and age (l). To this end, we used the following information from the RAINS 2000 BAU scenario described in TERI et al. (1999) and Boudri et al. (2000a) as a basis:

­ Total national demand for primary energy in the power sector for fossil and renewable fuels by type of fuel (Ft);

­ Total electricity production (E)

From these data, and additional information from RAINS on large point sources, we constructed an electricity generation scenario, in which we distinguished between the following capacity classes (c) for coal- and oil fired power plants:

< 50 MW, low or medium pressure < 50 MW, high pressure 50 – 125 MW 125 – 200 MW > 200 MW

And we used the following lifetime classes (l) for coal- and oil fired power plants

­ built before 1990 ­ built between 1990 and 2000 ­ built between 2000 and 2010 ­ built after 2010

The total capacities (C) and the electrical efficiencies (ef) were estimated, while the capacity factors (cf) and the age of power plants (size of classes l) were partly based on RAINS information and partly on other sources. We assumed that the cogeneration capacity amounts to 12% of the total capacity. See Annex 5-7 for details.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (141)

110

5.4.1.2 India

For natural gas, nuclear power and renewables, all information was taken from the RAINS Business-as-Usual scenario as described in TERI et al. (1999) and Boudri et al. (2000a).

For coal and oil-fired power we subdivided the RAINS information into classes of power plants of varying capacity (c) and age (l). To this end, we used the following information from the RAINS BAU scenario described in TERI et al. (1999) and Boudri et al. (2000a) as a basis:

­ Total national demand for primary energy in the power sector for fossil and renewable fuels (Ft);

­ Total electricity production (E).

In RAINS-ASIA, a distinction is made between large point sources and so-called area sources of air pollution. The large point sources in earlier RAINS versions include electricity production facilities with capacities of 500 MW or more. Although these definitions changed to some extent, we here follow the RAINS-ASIA 8.0 subdivision and distinguish between the following capacity classes (c) for coal- fired power plants:

­ large point sources (LPS) ­ other power plants

And we used the following lifetime classes (l) for coal-fired power plants

Large point sources:

­ built before 1990 ­ built between 1990 and 2000 ­ built between 2000 and 2010 ­ built after 2010

Other power plants:

­ built before 2000 ­ built after 2000

The electrical efficiencies (ef) and the age of power plants (size of classes l) were either taken from RAINS-ASIA, or estimated from the literature. Additional assumptions were made on cogeneration. (see Annex 5-8). For India we did not quantify total capacities (C).

5.4.2 Electricity production in the BAU scenario

5.4.2.1 China

In the BAU scenario, total electricity production in China increases from 2.2 EJ in 1990 to 10.1 EJ in 2020 (Fig. 5.5). In 1990, about 70% of the electricity was produced in coal/oil fired power plants and by 2020 about 60%. The average capacity of power plants increases considerably over time. By 2020, almost 95% of the electricity from coal/oily fired power plants is produced in plants with a capacity of more than 200 MW, while in 1990 power plants larger than 200 MW contributed less than 50% to electricity produced by coal/oil fired power plants in China. About 20% of the electricity is produced from renewables, of which large hydropower is the most important.

5.4.2.2 India

In the BAU scenario, total electricity production in India increases from 1 EJ in 1990 to 5.2 EJ in 2020 (Fig. 5.7). In 1990, about 65% of the electricity was produced in coal-fired

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (142)

An Asian Dilemma

111

power plants and by 2020 about 60%. About 17% of the electricity is produced from renewables, of which large hydropower is the most important.

5.4.3 Emissions of air pollutants in the BAU scenario

We use aggregated emission factors reflecting the emissions per unit of primary energy equivalent (Annex 5-6). For CO2, N2O and SO2 the emissions included emissions during the production of electricity. For methane, the emission factors include both emissions during fuel combustion and those occurring before the actual electricity production (during mining and transport). For the other gases, we assume that these pre-combustion emissions are negligible and only calculate emissions from electricity generation. The emission factors for cogeneration only reflect the emissions that can be assigned to electricity production. The calculated emissions therefore do not include additional emissions that are assigned to heat production (see Annex 5-6).

In China, the total greenhouse gas emissions from electricity production are calculated to increase from 510 Tg CO2-equivalents in 1990 to 1554 CO2-equivalents in 2020 (Fig. 5.6). More than 90% of these emissions are CO2 emissions, while CH4 and N2O contribute less than 10%.

In India, the total greenhouse gas emissions from electricity production are calculated to increase from 256 Tg CO2-equivalents in 1990 to 978 Tg CO2-equivalents in 2020 (Fig. 5.8). Like for China, more than 90% of these emissions are CO2 emissions, while CH4 and N2O contribute less than 10%.

5.5 Summary

In this chapter we summarized the BAU scenario for the power sector that we used as the basis for our scenario analyses in chapters 7 and 9. To this end, we used the RAINS-Asia 2000 BAU scenario and interpreted its data in such a way that we can use the scenario as a starting point for the analysis of options to reduce greenhouse gases. This chapter presents BAU scenarios revised as of 1999. This implies that the scenario has taken policies plans for the period up to 2020 that were developed during the nineties into account. The implications of the research are as follows.

First, the BAU 2000 scenario has lower projections for power generation and consumption and the related greenhouse gas emissions in the year 2020 than the BAU 1995 scenario, which already included a number of policies implemented before 1999. Although there may be other reasons for the revisions of the scenario, the downward adjustments are in line with policy measures developed after 1995. These developments have two implications in relation to the climate change convention. (a) They indicate that both countries have measures (see chapters 3, 4) that have incidentally led to a reduction of the growth of their power consumption and related greenhouse gas emissions in the period 1990-2000 and the period thereafter till 2020. (b) A second point to note is that although the revised scenarios include policy measures, these may not, in fact, be implemented since both countries suffer from an implementation deficit (see Chapters 3, 4).

Second, for China the BAU scenario assumes a 30% growth of population and a 7.5-fold increase in GDP, while total primary energy demand is expected to increase by 125%. As a result of this energy-related emissions of CO2 are by 2020 calculated to be more than twice the 1990 level. Emissions from the power sector contribute by about 30% to total greenhouse gas emissions. The total greenhouse gas emissions from electricity production are calculated to increase from 510 Tg CO2-equivalents in 1990 to 1554 CO2-equivalents in 2020. More than 90% of these emissions are CO2 emissions, while CH4 and N2O

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (143)

112

contribute less than 10%. Emissions of greenhouse gases from the power sector increase by a factor of three, while total electricity production increases by a factor of five, illustrating that total emissions per unit of electricity are expected to decrease considerably over time.

Third, for India, the BAU scenario assumes a more than 50% growth of population and a 5.8-fold increase in GDP, while total primary energy demand is expected to increase by 150%. As a result of this energy-related emissions of CO2 are by 2020 calculated to be more than three times the 1990 level. Emissions from the power sector contribute by about 40% to total greenhouse gas emissions. The total greenhouse gas emissions from electricity production are calculated to increase from 256 Tg CO2-equivalents to 978 Tg CO2-equivalents. Like for China, more than 90% of these emissions are CO2 emissions, while CH4 and N2O contribute less than 10%. Emissions of greenhouse gases from the power sector increase by a factor of four between 1990 and 2020, while total electricity production increases by a factor of five, illustrating that total emissions per unit of electricity are expected to decrease considerably over time.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (144)

An Asian Dilemma

113

Figure 5.5 The BAU scenario for China: Demand for primary energy for electricity production (top) and electricity production (bottom).

Electricity production in China (BAU)

2000

4000

6000

8000

10000

12000

1990 2000 2010 2020

Time (Year)

Ele

ctri

city

pro

duct

ion

(PJ)

Natural Gas

Nuclear

Other renewables

Large hydro

Biomass

Cogeneration

Coal/Oil > 200 MW

Coal/Oil 125-200 MW

Coal/Oil 50-125 MW

Coal/Oil < 50 MW

Demand for primary energy by power sector in China (BAU)

5000

10000

15000

20000

25000

30000

1990 2000 2010 2020

Time (year)

Ene

rgy

dem

and

(PJ)

Natural Gas

Nuclear

Other renewables

Large hydro

Biomass

Cogeneration

Coal/Oil > 200 MW

Coal/Oil 125-200 MW

Coal/Oil 50-125 MW

Coal/Oil < 50 MW

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (145)

114

Figure 5.6 The BAU scenario for China: Emissions of greenhouse gases (CO2, CH4 and N2O) (top) and sulphur dioxide (bottom) from the electricity sector.

Emissions of CO2, CH4 and N2O from power plants in China (BAU)

200

400

600

800

1000

1200

1400

1600

1800

1990 2000 2010 2020

Time (year)

Em

issi

ons

(Tg

CO

2-e

q)

Natural Gas

Nuclear

Other renewables

Large hydro

Biomass

Cogeneration

Coal > 200 MW

Coal 125-200 MW

Coal 50-125 MW

Coal < 50 MW

Emissions of SO2 from power plants in China (BAU)

2

4

6

8

10

12

14

16

1990 2000 2010 2020

Time (year)

SO

2 em

issi

ons

(Tg

SO

2)

Natural Gas

Nuclear

Other renewables

Large hydro

Biomass

Cogeneration

Coal > 200 MW

Coal 125-200 MW

Coal 50-125 MW

Coal < 50 MW

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (146)

An Asian Dilemma

115

Figure 5.7 The BAU scenario for India: Demand for primary energy for electricity production (top) and electricity production (bottom).

Demand for primary energy by power sector in India (BAU)

2000

4000

6000

8000

10000

12000

14000

16000

1990 2000 2010 2020

Time (year)

Ene

rgy

dem

and

(PJ)

Natural Gas

Nuclear

Other renewables

Large hydro

Bagasse

Oil

Cogeneration

Coal, LPS, >2000

Coal, LPS, <2000

Coal, other, >2000

Coal, other, <2000

Electricity production in India (BAU)

1000

2000

3000

4000

5000

6000

1990 2000 2010 2020

Time (Year)

Ele

ctric

ity p

rodu

ctio

n (P

J)

Natural Gas

Nuclear

Other renewables

Large hydro

Bagasse

Oil

Cogeneration

Coal, LPS, >2000

Coal, LPS, <2000

Coal, other, >2000

Coal, other, <2000

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (147)

116

Figure 5.8 The BAU scenario for India: Emissions of greenhouse gases (CO2, CH4 and N2O) (top) and sulphur dioxide (bottom) from the electricity sector.

E m i s s i o n s o f C O2, C H 4 and N 2O f rom power p l an t s i n Ind ia (BAU)

2 0 0

4 0 0

6 0 0

8 0 0

1000

1200

1990 2000 2010 2020

T ime (year )

Emis

sion

s (T

g CO

2-eq

)

Natural Gas

Nuclear

Other renewables

Large hydro

Bagasse

Oil

Cogeneration

Coal, LPS, >2000

Coal, LPS, <2000

Coal, other, >2000

Coal, other, <2000

Emissions of SO2 from power plants in India (BAU)

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

1990 2000 2010 2020

Time (year)

SO

2 em

issi

ons

(Tg

SO

2)

Natural Gas

Nuclear

Other renewables

Large hydro

Bagasse

Oil

Cogeneration

Coal, LPS, >2000

Coal, LPS, <2000

Coal, other, >2000

Coal, other, <2000

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (148)

An Asian Dilemma

117

ANNEX 5.1 DETAILS ON RAINS-Asia BAU SCENARIO

Table A5.1.1 Overview of electricity supply and demand in China (excl. Hong Kong) in the RAINS-Asia 2000 scenario.

Electricity generation needs (TWh) RAINS-ASIA 2000 BAU 1990 1995 2000 2010 2020 Electricity demand 511 767 972 1494 2393 Industry* 382 535 697 1148 1752 Domestic 119 221 246 302 587 Transport 11 11 28 44 54 Own use and T&D losses (%) 18 24 19 17 15 Own use and T&D losses (TWh) 110 236 228 305 407 Gross Electrical output needed 621 1002 1200 1800 2800 Electricity generation sources Net import (+)/Export(-) -1 -5 1 0 -1 Fossil plants 497 807 943 1294 1972 Biomass* 1 1 1 3 6 Hydro 86 142 184 321 501 Renewable* 39 47 56 67 94 Nuclear 0 13 16 117 235 Total electricity generation 621 1008 1199 1800 2801 * Renewables and biomass that are used for district heating (GTH and part of WSF and BGS) has been substracted

Table A5.1.2 Overview of electricity supply and demand in India in the RAINS-Asia 2000 scenario.

Electricity generation needs (TWh) RAINS-ASIA 2000 BAU 1990 1995 2000 2010 2020 Electricity demand 215 315 459 752 1250 Industry* 109 144 210 345 575 Domestic 102 165 241 395 659 Transport 4 6 9 12 16 Own use and T&D losses (%) 26 24 22 21 17 Own use and T&D losses (TWh) 75 101 131 200 253 Gross Electrical output needed 291 416 590 952 1504 Electricity generation sources Net import (+)/Export(-) 1 -2 1 -1 -1 Fossil plants 221 338 501 792 1256 Bagasse 4 5 6 10 15 Hydro 61 72 78 148 230 Renewable 0 0 2 6 15 Nuclear 7 8 9 7 3 Total electricity generation 289 418 589 953 1504

* Bagasse based own generation included

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (149)

118

ANNEX 5.2 SUMMARY TABLES FOR ELECTRICITY PRODUCTION IN CHINA

Table A5.2.1 Demand for primary energy1 for electricity production in China in the Business-as-Usual scenario. Adapted from RAINS 2000 BAU scenario (see text). Unit: PJ/year.

1990 1995 2000 2010 2020 Coal/Oil < 50 MW 1723 2767 2767 2333 0 Coal/Oil 50-125 MW 738 1189 1189 1127 543 Coal/Oil 125-200 MW 517 815 815 772 442 Coal/Oil > 200 MW 2221 3434 4562 7478 14243 Cogeneration 1190 2323 1913 2422 4019 Biomass 89 89 124 167 226 Large hydro 812 1341 1742 3039 4743 Other renewables2 371 474 533 638 886 Nuclear3 0 122 147 1113 2228 Natural Gas 63 112 185 398 1006 Total 7724 12665 13977 19487 28336 1 The demand for primary energy reflects primary energy equivalents. For fossil fuels and biomass

these are defined as the net calorific input of fossil fuels or biomass (equal to the input in tons multiplied by the net calorific value), expressed in PJ. An equivalent amount of primary energy for processes without direct fuel consumption (wind, geothermal, hydro, nuclear, etc.,) are in accordance with the convention adopted in United Nations Statistics. For electricity producing facilities (both grid connected and non-grid connected) this is: 1 PJ of primary energy equivalent = 0.38 PJ of gross electricity produced. For heat producing facilities, this is: 1 PJ of primary energy equivalent = 1 PJ of gross heat produced.

2 Geothermal used for electricity production, wind and small hydropower.

Table A5.2.2 Production of electricity in China in the Business-as-Usual scenario. Adapted from RAINS 2000 BAU scenario (see text). Unit: PJ/year.

1990 1995 2000 2010 2020 Coal/Oil < 50 MW 486 780 780 666 0 Coal/Oil 50-125 MW 221 357 357 338 164 Coal/Oil 125-200 MW 166 267 267 253 147 Coal/Oil > 200 MW 755 1216 1645 2820 5610 Cogeneration 123 209 243 353 603 Biomass 3 3 4 10 21 Large hydro 308 509 662 1155 1802 Other renewables1 141 180 202 242 337 Nuclear 0 46 56 423 847 Natural Gas 35 61 102 219 553 Total 2237 3628 4317 6479 10084 1 Geothermal, wind and small hydropower.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (150)

An Asian Dilemma

119

ANNEX 5.3 SUMMARY TABLES FOR EMISSIONS IN CHINA

Table A5.3.1 Emissions of CO2 from electricity production in China in the Business-as-Usual scenario. Unit: Tg CO2/year.

1990 1995 2000 2010 2020 Coal < 50 MW 148 238 238 201 0 Coal 50-125 MW 64 102 102 97 47 Coal 125-200 MW 45 70 70 66 38 Coal > 200 MW 191 296 393 644 1227 Cogeneration 20 38 32 40 66 Biomass 0 0 0 0 0 Large hydro 0 0 0 0 0 Other renewables1 0 0 0 0 0 Nuclear 0 0 0 0 0 Natural Gas 4 6 10 22 56 Total 471 752 846 1071 1435 1 Geothermal, wind and small hydropower.

Table A5.3.2 Emissions of CH4 from electricity production in China in the Business-as-Usual scenario. Unit: Tg CO2-equivalents/year.

1990 1995 2000 2010 2020 Coal < 50 MW 11.5 18.4 18.4 15.5 0.0 Coal 50-125 MW 4.9 7.9 7.9 7.5 3.6 Coal 125-200 MW 3.4 5.4 5.4 5.1 2.9 Coal > 200 MW 14.8 22.9 30.4 49.8 94.8 Cogeneration 1.5 3.0 2.4 3.1 5.1 Biomass 0.1 0.1 0.1 0.1 0.1 Large hydro 0.0 0.0 0.0 0.0 0.0 Other renewables1 0.0 0.0 0.0 0.0 0.0 Nuclear 0.0 0.0 0.0 0.0 0.0 Natural Gas 0.4 0.7 1.2 2.5 6.4 Total 36.6 58.3 65.8 83.7 113.0 1 Geothermal, wind and small hydropower.

Table A5.3.3 Emissions of N2O from electricity production in China in the Business-as-Usual scenario. Unit: Tg CO2-equivalents/year.

1990 1995 2000 2010 2020 Coal < 50 MW 0.7 1.1 1.1 0.9 0.0 Coal 50-125 MW 0.3 0.5 0.5 0.5 0.2 Coal 125-200 MW 0.2 0.3 0.3 0.3 0.2 Coal > 200 MW 0.9 1.4 1.8 3.0 5.7 Cogeneration 0.1 0.2 0.1 0.2 0.3 Biomass 0.1 0.1 0.2 0.2 0.3 Large hydro 0.0 0.0 0.0 0.0 0.0 Other renewables1 0.0 0.0 0.0 0.0 0.0 Nuclear 0.0 0.0 0.0 0.0 0.0 Natural Gas 0.0 0.0 0.0 0.0 0.0 Total 2.3 3.6 4.1 5.1 6.8 1 Geothermal, wind and small hydropower.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (151)

120

Table A5.3.4 Total greenhouse gas emissions (CO2, CH4 and N2O) from electricity production in China in the Business-as-Usual scenario. Unit: Tg CO2-equivalents/year.

1990 1995 2000 2010 2020 Coal < 50 MW 161 258 258 217 0 Coal 50-125 MW 69 111 111 105 51 Coal 125-200 MW 48 76 76 72 41 Coal > 200 MW 207 320 425 697 1328 Cogeneration 21 41 34 43 72 Biomass 0 0 0 0 0 Large hydro 0 0 0 0 0 Other renewables1 0 0 0 0 0 Nuclear 0 0 0 0 0 Natural Gas 4 7 11 25 63 Total 510 813 916 1160 1554 1 Geothermal, wind and small hydropower.

Table A5.3.5 Emissions of SO2 from electricity production in China in the Business-as-Usual scenario. Unit: Tg SO2/year.

1990 1995 2000 2010 2020 Coal < 50 MW 1.6 2.5 2.5 2.1 0.0 Coal 50-125 MW 0.7 1.1 1.1 1.0 0.5 Coal 125-200 MW 0.5 0.7 0.7 0.7 0.4 Coal > 200 MW 2.0 3.1 4.1 6.7 12.8 Cogeneration 0.2 0.4 0.3 0.4 0.7 Biomass 0.0 0.0 0.0 0.1 0.1 Large hydro 0.0 0.0 0.0 0.0 0.0 Other renewables1 0.0 0.0 0.0 0.0 0.0 Nuclear 0.0 0.0 0.0 0.0 0.0 Natural Gas 0.0 0.0 0.0 0.0 0.0 Total 4.9 7.8 8.8 11.0 14.5 1 Geothermal, wind and small hydropower.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (152)

An Asian Dilemma

121

ANNEX 5.4 SUMMARY TABLES FOR ELECTRICITY PRODUCTION IN INDIA

Table A5.4.1 Demand for primary1 energy for electricity production in India in the Business-as-Usual scenario. Adapted from RAINS 2000 BAU scenario (see text). Unit: PJ/year.

1990 1995 2000 2010 2020 Coal, other, <2000 465 1254 1699 1275 854 Coal, other, >2000 0 0 0 1990 2628 Coal, LPS, <2000 1907 2389 2574 1360 1094 Coal, LPS, >2000 0 0 0 1060 3824 Cogeneration 0 240 333 500 667 Oil 112 99 121 159 190 Bagasse 318 422 500 821 1280 Large hydro 581 681 735 1398 2175 Other renewables2 0.50 2 21 57 145 Nuclear 67 72 81 68 33 Natural Gas 140 226 350 723 1693 Total 3591 5385 6414 9412 14583 1 The demand for primary energy reflects primary energy equivalents. For fossil fuels and biomass these are defined as the

net calorific input of fossil fuels or biomass (equal to the input in tons multiplied by the net calorific value), expressed in PJ. An equivalent amount of primary energy for processes without direct fuel consumption (wind, geothermal, hydro, nuclear, etc.,) are in accordance with the convention adopted in United Nations Statistics. For electricity producing facilities (both grid connected and non-grid connected) this is: 1 PJ of primary energy equivalent = 0.38 PJ of gross electricity produced. For heat producing facilities, this is: 1 PJ of primary energy equivalent = 1 PJ of gross heat produced.

2 Wind and small hydropower.

Table A5.4.2 Production of electricity in India in the Business-as-Usual scenario. Adapted from RAINS 2000 BAU scenario (see text). Unit: PJ/year.

1990 1995 2000 2010 2020 Coal, other, <2000 107 339 578 433 290 Coal, other, >2000 0 0 0 756 998 Coal, LPS, <2000 572 741 816 484 394 Coal, LPS, >2000 0 0 0 403 1453 Cogeneration 0 36 50 75 100 Oil 32 29 39 58 71 Bagasse 9 12 14 22 35 Large hydro 221 259 279 531 827 Other renewables1 0 1 8 22 55 Nuclear 25 27 31 26 12 Natural Gas 77 124 193 398 931 Total 1043 1568 2007 3209 5168 1 Wind and small hydropower.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (153)

122

ANNEX 5.5 SUMMARY TABLES FOR EMISSIONS IN INDIA

Table A5.5.1 Emissions of CO2 from electricity production in India in the Business-as-Usual scenario. Unit: Tg CO2/year. LPS = Large Point Source1.

1990 1995 2000 2010 2020 Coal, other, <2000 43 116 158 118 79 Coal, other, >2000 0 0 0 185 244 Coal, LPS, <2000 177 221 239 126 101 Coal, LPS, >2000 0 0 0 98 354 Cogeneration 0 4 6 8 11 Oil 9 8 9 12 15 Bagasse 0 0 0 0 0 Large hydro 0 0 0 0 0 Other renewables2 0 0 0 0 0 Nuclear 0 0 0 0 0 Natural Gas 8 13 20 40 95 Total 236 362 430 588 899 1 Large Point Sources are defined in RAINS-Asia as electricity producing facilities with a capacity

of more than 500 MW

2 Wind and small hydropower.

Table A5.5.2 Emissions of CH4 from electricity production in India in the Business-as-Usual scenario. Unit: Tg CO2-equivalents/year. LPS = Large Point Source1.

1990 1995 2000 2010 2020 Coal, other, <2000 3.4 9.2 12.5 9.4 6.3 Coal, other, >2000 0.0 0.0 0.0 14.7 19.4 Coal, LPS, <2000 14.1 17.6 19.0 10.0 8.1 Coal, LPS, >2000 0.0 0.0 0.0 7.8 28.2 Cogeneration 0.0 0.3 0.4 0.7 0.9 Oil 0.0 0.0 0.0 0.0 0.0 Bagasse 0.2 0.3 0.3 0.5 0.8 Large hydro 0.0 0.0 0.0 0.0 0.0 Other renewables2 0.0 0.0 0.0 0.0 0.0 Nuclear 0.0 0.0 0.0 0.0 0.0 Natural Gas 0.9 1.4 2.2 4.6 10.7 Total 18.6 28.9 34.5 47.7 74.3 1 Large Point Sources are defined in RAINS-Asia as electricity producing facilities with a capacity

of more than 500 MW

2 Wind and small hydropower.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (154)

An Asian Dilemma

123

Table A5.5.3 Emissions of N2O from electricity production in India in the Business-as-Usual scenario. Unit: Tg CO2-equivalents/year. LPS = Large Point Source1.

1990 1995 2000 2010 2020 Coal, other, <2000 0.2 0.5 0.7 0.6 0.4 Coal, other, >2000 0.0 0.0 0.0 0.9 1.1 Coal, LPS, <2000 0.8 1.0 1.1 0.6 0.5 Coal, LPS, >2000 0.0 0.0 0.0 0.5 1.7 Cogeneration 0.0 0.0 0.0 0.0 0.1 Oil 0.0 0.0 0.0 0.0 0.0 Bagasse 0.4 0.5 0.6 1.0 1.6 Large hydro 0.0 0.0 0.0 0.0 0.0 Other renewables2 0.0 0.0 0.0 0.0 0.0 Nuclear 0.0 0.0 0.0 0.0 0.0 Natural Gas 0.0 0.0 0.0 0.0 0.1 Total 1.4 2.1 2.5 3.6 5.4 1 Large Point Sources are defined in RAINS-Asia as electricity producing facilities with a capacity

of more than 500 MW

2 Wind and small hydropower.

Table A5.5.4 Total greenhouse gas emissions (CO2, CH4 and N2O) from electricity production in India in the Business-as-Usual scenario. Unit: Tg CO2-equivalents/year. LPS = Large Point Source1.

1990 1995 2000 2010 2020 Coal, other, <2000 47 126 171 128 86 Coal, other, >2000 0 0 0 200 264 Coal, LPS, <2000 192 240 259 137 110 Coal, LPS, >2000 0 0 0 107 384 Cogeneration 0 4 6 9 12 Oil 9 8 9 12 15 Bagasse 1 1 1 2 2 Large hydro 0 0 0 0 0 Other renewables2 0 0 0 0 0 Nuclear 0 0 0 0 0 Natural Gas 9 14 22 45 105 Total 256 393 467 639 978 1 Large Point Sources are defined in RAINS-Asia as electricity producing facilities with a capacity

of more than 500 MW

2 Wind and small hydropower.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (155)

124

Table A5.5.5 Emissions of SO2 from electricity production in India in the Business-as-Usual scenario. Unit: Tg SO2/year. LPS = Large Point Source1.

1990 1995 2000 2010 2020 Coal, other, <2000 0.2 0.4 0.6 0.4 0.3 Coal, other, >2000 0.0 0.0 0.0 0.7 0.9 Coal, LPS, <2000 0.6 0.8 0.8 0.4 0.4 Coal, LPS, >2000 0.0 0.0 0.0 0.3 1.3 Cogeneration 0.0 0.0 0.0 0.0 0.0 Oil 0.0 0.0 0.0 0.0 0.0 Bagasse 0.1 0.1 0.2 0.3 0.4 Large hydro 0.0 0.0 0.0 0.0 0.0 Other renewables2 0.0 0.0 0.0 0.0 0.0 Nuclear 0.0 0.0 0.0 0.0 0.0 Natural Gas 0.0 0.0 0.0 0.0 0.0 Total 0.9 1.4 1.6 2.2 3.3 1 Large Point Sources are defined in RAINS-Asia as electricity producing facilities with a capacity

of more than 500 MW

2 Wind and small hydropower.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (156)

An Asian Dilemma

125

ANNEX 5.6 EMISSION FACTORS

For the calculations presented in 5.4, chapters 7 and 9, the emission factors presented in Table A5.6.1 were used.

Table A5.6.1 Emission factors used for calculations for China in chapters 5.4, 7 and 9. Source: IPCC (1996) for greenhouse gases; Foell et al (1995)1 for SO2. Emission factor for cogeneration only includes emissions assigned to electricity production2.

CO2 CH4 N2O SO2 t C/TJ kg CH4/TJ kg N2O/TJ kt SO2/PJ Coal/Oil < 50 MW 23.5 317 1.3 0.9 Coal/Oil 50-125 MW 23.5 317 1.3 0.9 Coal/Oil 125-200 MW 23.5 317 1.3 0.9 Coal/Oill > 200 MW 23.5 317 1.3 0.9 Cogeneration (Coal) 4.5 61 0.2 0.2 Cogeneration (Gas) 7.2 142 0.05 0.005 Biomass 0 30 4 0.4 Large hydro 0 0 0 0 Other renewables 0 0 0 0 Nuclear 0 0 0 0 Natural Gas 15.22 301 0.10 0.01 1 Current versions of RAINS-ASIA may use updated emission factors for SO2 2 Emissions factors for cogeneration only include emissions that can be assigned to the electricity

generated and are excludung emissions assigned to heat production. Hence, the emission factor (per ton of coal input) of electricity generated via cogeneration, is lower than of electricity generated without heat production. The emission factor of gas-based cogeneration is higher than that of coal-based cogeneration because the ratio of heat to electricity is lower for gas-based cogeneration, re-sulting in less emissions assigned to heat production. To calculate the emission factor per unit of fuel input (TJ-p), the following formula could be used: (1-(ηCHP heat production/ηCHP system))*emission factor fuel power plant, in which the system efficiency equals the summation of electric and heat effi-ciencies. To calculate the emission factor per unit of electricity output (TJ-e), the following formula could be used: ((1/ηCHP electric)-(ηCHP heat production/(ηelectric*ηsystem)))*(emission factor fuel power

plant/ηconversion power plant).

Table A5.6.2 Emission factors used for calculations for India in chapters 5.4, 7 and 9. Source: Houghton et al. (1997) for greenhouse gases; Foell et al (1995) for SO2. Emission factor for cogeneration only includes emissions assigned to electricity production.

CO2 CH4 N2O SO2 t C/TJ kg CH4/TJ kg N2O/TJ kt SO2/PJ Coal, small, <2000 25.3 351 1.4 0.33 Coal, small, >2000 25.3 351 1.4 0.33 Coal, large, <2000 25.3 351 1.4 0.33 Coal, large, >2000 25.3 351 1.4 0.33 Cogeneration (coal) 4.5 62 0.2 0.06 Cogeneration (gas) 7.2 142 0.05 0.005 Oil 20.9 7.1 0.6 0.26 Bagasse 0.0 30 4 0.33 Large hydro 0.0 0 0 0 Other renewables 0.0 0 0 0 Nuclear 0.0 0 0 0 Natural Gas 15.2 301 0.1 0.01

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (157)

126

ANNEX 5.7 DETAILS ON POWER SECTOR IN 2020 FOR CHINA – Business-as-usual

Table A5.7.1 Power sector in China in 1990 in the Business-as-Usual scenario (based on TERI et al., 1999; Boudri et al., 2000a).

Primary energy demand1 (F) Electricity produced

Efficiencies2 Capacities

Total Coal Oil Electricity (E)

el.eff (ef)

capacity (C)

cap.factor (cf)

PJ PJ PJ PJ fraction GW fraction Built before 1990 <= 50 MW low pressure 1144 1030 114 312 0.27 22 0.45 <= 50MW high pressure 579 521 58 174 0.30 11 0.50 50 – 125 MW 738 664 74 221 0.30 12 0.60 125 – 200 MW 517 466 52 166 0.32 9 0.60 >= 200 2221 1999 222 755 0.34 40 0.60 cogeneration 1190 1071 119 123 0.10 13 0.31 Totals Coal/Oil 5199 4679 519 1628 0.31 106 Cogeneration (coal) 1190 1071 119 123 Natural Gas 63 35 0.55 Nuclear 0 Geothermal (PP) 1 0 0.38 Waste Fuel 0 0 0.23 Bagasse 89 2 0.03 Wind 0 0 0.38 Large Hydro 812 308 0.38 Small hydro 370 140 0.38 Total 7724 5751 638 2237 0.29 For comparison: total from RAINS-BAU Sce-nario

7723 5751 638 2237

1 The demand for primary energy reflects primary energy equivalents. For fossil fuels and biomass these are defined as the net calorific input of fossil fuels or biomass (equal to the input in tons multiplied by the net calorific value), expressed in PJ. An equivalent amount of primary energy for processes without direct fuel consumption (wind, geothermal, hydro, nuclear, etc.,) are in accordance with the convention adopted in United Nations Statistics. For electricity producing facilities (both grid connected and non-grid connected) this is: 1 PJ of primary energy equivalent = 0.38 PJ of gross electricity produced. For heat producing facilities, this is: 1 PJ of primary energy equivalent = 1 PJ of gross heat produced.

2 Electrical efficiency = (gross electricity output / fuel input)*100

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (158)

An Asian Dilemma

127

Table A5.7.2 Power sector in China in 1995 in the Business-as-Usual scenario (based on TERI et al., 1999; Boudri et al., 2000a).

Primary energy demand1 (F) Electricity produced

Efficiencies2 Capacities

Total Coal Oil Electricity (E)

el.eff (ef)

Capacity (C)

cap.factor (cf)

PJ PJ PJ PJ fraction GW fraction Built before 1990 <= 50 MW low pressure 1144 1066 78 312 0.27 22 0.45 <= 50MW high pressure 579 539 40 174 0.30 11 0.50 50 – 125 MW 738 687 51 221 0.30 12 0.60 125 – 200 MW 517 482 35 166 0.32 9 0.60 >= 200 2221 2068 152 755 0.34 40 0.60 cogeneration 1190 1109 82 123 0.10 13 0.31 Built: after 1990 <= 50 MW low pressure 718 669 49 196 0.27 12 0.50 <= 50MW high pressure 327 304 22 98 0.30 6 0.50 50 – 125 MW 451 420 31 135 0.30 6 0.70 125 – 200 MW 297 277 20 101 0.34 5 0.70 >= 200 1214 1130 83 461 0.38 21 0.70 cogeneration 1133 1055 78 86 0.08 7 0.40 Totals Coal/Oil 8205 7643 562 2619 0.32 163 Cogeneration (coal) 2323 2164 159 209 Natural Gas 112 61 0.55 Nuclear 122 46 0.38 Geothermal (PP) 2 1 0.38 Waste Fuel 0 0 0.23 Bagasse 89 2 0.03 Wind 8 3 0.38 Large Hydro 1341 509 0.38 Small hydro 465 177 0.38 Total 12665 9806 721 3628 0.29 For comparison: total from RAINS-BAU Sce-nario

13076 9806 721 3628

1 The demand for primary energy reflects primary energy equivalents. For fossil fuels and biomass these are defined as the net calorific input of fossil fuels or biomass (equal to the input in tons multiplied by the net calorific value), expressed in PJ. An equivalent amount of primary energy for processes without direct fuel consumption (wind, geothermal, hydro, nuclear, etc.,) are in accordance with the convention adopted in United Nations Statistics. For electricity producing facilities (both grid connected and non-grid connected) this is: 1 PJ of primary energy equivalent = 0.38 PJ of gross electricity produced. For heat producing facilities, this is: 1 PJ of primary energy equivalent = 1 PJ of gross heat produced.

2 Electrical efficiency = (gross electricity output / fuel input)*100

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (159)

128

Table A5.7.3 Power sector in China in 2000 in the Business-as-Usual scenario. (based on TERI et al., 1999; Boudri et al., 2000a).

Primary energy demand1 (F)

Electricity produced

Efficiencies2 Capacities

Total Coal Oil Electricity (E)

el.eff (ef)

Capacity (C)

cap.factor (cf)

PJ PJ PJ PJ fraction GW fraction Built before 1990 <= 50 MW low pressure 1144 1066 78 312 0.27 22 0.45 <= 50MW high pressure 579 539 39 174 0.30 11 0.50 50 – 125 MW 738 688 50 221 0.30 12 0.60 125 – 200 MW 517 482 35 166 0.32 9 0.60 >= 200 2221 2069 151 755 0.34 40 0.60 cogeneration 1190 1109 81 123 0.10 13 0.31 Built: after1990 <= 50 MW low pressure 718 669 49 196 0.27 12 0.50 <= 50MW high pressure 327 304 22 98 0.30 6 0.50 50 – 125 MW 451 420 31 135 0.30 6 0.70 125 – 200 MW 297 277 20 101 0.34 5 0.70 >= 200 2342 2183 159 890 0.38 40 0.70 cogeneration 722 673 49 120 0.17 9 0.40 Totals Coal/Oil 9333 8698 635 3048 0.33 Cogeneration 1913 1782 130 243 Natural Gas 185 102 0.55 Nuclear 147 56 0.38 Geothermal (PP) 2 1 0.38 Waste Fuel 4 1 0.23 Bagasse 120 3 0.03 Wind 15 6 0.38 Large Hydro 1742 662 0.38 Small hydro 516 196 0.38 Total 13977 10481 765 4317 0.31 For comparison: total from RAINS-BAU

13978 10481 765 4317

1 The demand for primary energy reflects primary energy equivalents. For fossil fuels and biomass these are defined as the net calorific input of fossil fuels or biomass (equal to the input in tons multiplied by the net calorific value), expressed in PJ. An equivalent amount of primary energy for processes without direct fuel consumption (wind, geothermal, hydro, nuclear, etc.,) are in accordance with the convention adopted in United Nations Statistics. For electricity producing facilities (both grid connected and non-grid connected) this is: 1 PJ of primary energy equivalent = 0.38 PJ of gross electricity produced. For heat producing facilities, this is: 1 PJ of primary energy equivalent = 1 PJ of gross heat produced.

2 Electrical efficiency = (gross electricity output / fuel input)*100

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (160)

An Asian Dilemma

129

Table A5.7.4 Power sector in China in 2010 in the Business-as-Usual scenario. (based on TERI et al., 1999; Boudri et al., 2000a).

Primary energy demand1 (F)

Electricity produced

Efficiencies2 Capacities

Total Coal Oil Electricity (E)

el.eff (ef)

Capacity (C)

cap.factor (cf)

PJ PJ PJ PJ fraction GW fraction Built before 1990 <= 50 MW low pressure 710 674 36 199 0.28 14 0.45 <= 50MW high pressure 579 549 30 174 0.30 11 0.50 50 – 125 MW 676 642 35 203 0.30 12 0.55 125 – 200 MW 474 450 24 152 0.32 9 0.55 >= 200 2072 1967 106 705 0.34 40 0.56 cogeneration 1103 1047 56 114 0.10 12 0.31 Built: 1990-2000 <= 50 MW low pressure 718 681 37 196 0.27 12 0.50 <= 50MW high pressure 327 310 17 98 0.30 6 0.50 50 – 125 MW 451 428 23 135 0.30 6 0.70 125 – 200 MW 297 282 15 101 0.34 5 0.70 >= 200 2342 2222 120 890 0.38 40 0.70 cogeneration 722 685 37 120 0.17 9 0.40 Built: 2000-2010 <= 50 MW low pressure 0 0 0 0 0.28 0 0.50 <= 50MW high pressure 0 0 0 0 0.30 0 0.50 50 – 125 MW 0 0 0 0 0.34 0 0.70 125 – 200 MW 0 0 0 0 0.36 0 0.70 >= 200 3064 2907 157 1225 0.40 56 0.70 cogeneration 597 566 30 119 0.20 8 0.50 Totals Coal/Oil 11710 11180 530 4077 239 Cogeneration (coal) 2422 2313 110 353 Natural Gas 398 219 0.55 Nuclear 1113 423 0.38 Geothermal (PP) 5 2 0.38 Waste Fuel 25 6 0.23 Bagasse 142 4 0.03 Wind 47 18 0.38 Large Hydro 3039 1155 0.38 Small hydro 586 223 0.38 Total 19487 13492 640 6479 0.33 For comparison: total from RAINS-BAU sce-nario

19493 13492 640 6479

1 he demand for primary energy reflects primary energy equivalents. For fossil fuels and biomass these are defined as the net calorific input of fossil fuels or biomass (equal to the input in tons multiplied by the net calorific value), expressed in PJ. An equivalent amount of primary energy for processes without direct fuel consumption (wind, geothermal, hydro, nuclear, etc.,) are in accordance with the convention adopted in United Nations Statistics. For electricity producing facilities (both grid connected and non-grid connected) this is: 1 PJ of primary energy equivalent = 0.38 PJ of gross electricity produced. For heat producing facilities, this is: 1 PJ of primary energy equivalent = 1 PJ of gross heat produced.

2 Electrical efficiency = (gross electricity output / fuel input)*100

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (161)

130

Table A5.7.5 Power sector in China in 2020 in the Business-as-Usual scenario. (based on TERI et al., 1999; Boudri et al., 2000a)

Primary energy demand1 (F)

Electricity produced

Efficiencies2 Capacities

Total Coal Oil Electricity (E)

el.eff (ef) Capacity (C)

cap.factor (cf)

PJ PJ PJ PJ fraction GW fraction Built before 1990 <= 50 MW low pressure 0 0 0 0 0.27 0 0.45 <= 50MW high pressure 0 0 0 0 0.30 0 0.50 50 – 125 MW 92 89 4 28 0.31 2 0.50 125 – 200 MW 145 139 6 46 0.32 3 0.50 >= 200 672 645 27 228 0.34 14 0.53 Cogeneration 164 164 0 25 0.15 3 0.31 Built: 1990-2000 <= 50 MW low pressure 0 0 0 0 0.27 0 0.50 <= 50MW high pressure 0 0 0 0 0.30 0 0.50 50 – 125 MW 451 433 18 135 0.30 6 0.70 125 – 200 MW 297 286 12 101 0.34 5 0.70 >= 200 2342 2248 94 890 0.38 40 0.70 Cogeneration 585 585 0 88 0.15 7 0.40 Built: 2000-2010 <= 50 MW low pressure 0 0 0 0 0.28 0 0.50 <= 50MW high pressure 0 0 0 0 0.30 0 0.50 50 – 125 MW 0 0 0 0 0.34 0 0.70 125 – 200 MW 0 0 0 0 0.36 0 0.70 >= 200 3064 2941 123 1225 0.40 56 0.70 Cogeneration 796 796 0 119 0.15 8 0.50 Built: after 2010 <= 50 MW low pressure 0 0 0 0 0.27 0 0.50 <= 50MW high pressure 0 0 0 0 0.30 0 0.50 50 – 125 MW 0 0 0 0 0.31 0 0.60 125 – 200 MW 0 0 0 0 0.32 0 0.60 >= 200 8166 7840 327 3267 0.40 173 0.60 cogeneration 2475 2475 0 371 0.15 24 0.50 Totals Coal/Oil 15229 14620 609 5921 338 Cogeneration (coal) 4019 4019 0 603 Natural Gas 1006 553 0.55 Nuclear 2228 847 0.38 Geothermal (PP) 13 5 0.38 Waste Fuel 75 17 0.23 Bagasse 150 4 0.03 Wind 84 32 0.38 Large Hydro 4743 1802 0.38 Small hydro 788 300 0.38 Total 28336 18639 609 10084 For comparison: total from RAINS-BAU scenario

27161 17396 584 10084

1 The demand for primary energy reflects primary energy equivalents. For fossil fuels and biomass these are defined as the net calorific input of fossil fuels or biomass (equal to the input in tons multiplied by the net calorific value), expressed in PJ. An equivalent amount of primary energy for processes without direct fuel consumption (wind, geothermal, hydro, nuclear, etc.,) are in accordance with the convention adopted in United Nations Statistics. For electricity producing facilities (both grid connected and non-grid connected) this is: 1 PJ of primary energy equivalent = 0.38 PJ of gross electricity produced. For heat producing facilities, this is: 1 PJ of primary energy equivalent = 1 PJ of gross heat produced.

2 Electrical efficiency = (gross electricity output / fuel input)*100.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (162)

An Asian Dilemma

131

ANNEX 5.8 DETAILS ON POWER SECTOR IN 2020 FOR INDIA – Business-as-usual

Table A5.8.1 Power sector in India in 1990 in the Business-as-Usual scenario. (based on TERI et al., 1999; Boudri et al., 2000a).

INDIA 1990 Demand for primary energy (F)1

(PJ)

Gross electricity pro-duction (PJ)

Efficiencies2 (fraction)

Total Coal Oil Total Coal Oil Coal Built <1990 Other power plants 487 465 22 112 107 5 0.23 Large point sources 1997 1907 90 599 572 27 0.3 Cogeneration 0 0 0 0 0.15 All fuels Coal 2372 679 Cogeneration (coal) 0 0 Oil 112 32 Natural gas 140 77 0.55 Nuclear 67 25 0.38 Bagasse 318 9 0.03 Wind 0.40 0.15 0.38 Large hydro 581 221 0.38 Small hydro 0.10 0.04 0.38 Total 3591 1043 Total BAU-EU 3591 1042 1 The demand for primary energy reflects primary energy equivalents. For fossil fuels and biomass

these are defined as the net calorific input of fossil fuels or biomass (equal to the input in tons multiplied by the net calorific value), expressed in PJ. An equivalent amount of primary energy for processes without direct fuel consumption (wind, geothermal, hydro, nuclear, etc.,) are in accordance with the convention adopted in United Nations Statistics. For electricity producing facilities (both grid connected and non-grid connected) this is: 1 PJ of primary energy equivalent = 0.38 PJ of gross electricity produced. For heat producing facilities, this is: 1 PJ of primary energy equivalent = 1 PJ of gross heat produced.

2 Electrical efficiency = (gross electricity output / fuel input)*100

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (163)

132

Table A5.8.2 Power sector in India in 1995 in the Business-as-Usual scenario. (based on TERI et al., 1999; Boudri et al., 2000a)

INDIA 1995 Demand for primary en-ergy (F)1

(PJ)

Gross electricity pro-duction (PJ)

Efficiencies2 (fraction)

Total Coal Oil Total Coal Oil Coal Other power plants 1288 1254 34 348 339 9 0.27 Built <1990 Large point sources 2143 2086 57 643 626 17 0.3 Built >1990 Large point sources 311 302 8 118 115 3 0.38 Cogeneration 240 240 36 36 0.15 All fuels Coal 3643 1079 Cogeneration (coal) 240 36 Oil 99 29 Natural gas 226 124 0.55 Nuclear 72 27 0.38 Bagasse 422 12 0.03 Wind 1.6 1 0.38 Large hydro 681 259 0.38 Small hydro 0.5 0 0.38 Total 5385 1568 Total BAU-EU 5385 1505 1 The demand for primary energy reflects primary energy equivalents. For fossil fuels and biomass

these are defined as the net calorific input of fossil fuels or biomass (equal to the input in tons multiplied by the net calorific value), expressed in PJ. An equivalent amount of primary energy for processes without direct fuel consumption (wind, geothermal, hydro, nuclear, etc.,) are in accordance with the convention adopted in United Nations Statistics. For electricity producing facilities (both grid connected and non-grid connected) this is: 1 PJ of primary energy equivalent = 0.38 PJ of gross electricity produced. For heat producing facilities, this is: 1 PJ of primary energy equivalent = 1 PJ of gross heat produced.

2 Electrical efficiency = (gross electricity output / fuel input)*100

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (164)

An Asian Dilemma

133

Table A5.8.3 Power sector in India in 2000 in the Business-as-Usual scenario. (based on TERI et al., 1999; Boudri et al., 2000a)

INDIA-2000 Demand for primary energy (F)1

(PJ)

Gross electricity pro-duction (PJ)

Efficiencies2 (fraction)

Total Coal Oil Total Coal Oil Coal Other power plants 1747 1699 48 594 578 16 0.34 Built <1990 Large point sources 2083 2026 57 625 608 17 0.3 Built >1990 Large point sources 563 548 15 214 208 6 0.38 Cogeneration 333 333 50 50 0.15 All fuels Coal 4273 1394 Cogeneration (coal) 333 50 Oil 121 39 Natural gas 350 193 0.55 Nuclear 81 31 0.38 Bagasse 500 14 0.03 Wind 16 6 0.38 Large hydro 735 279 0.38 Small hydro 5 2 0.38 Total 6414 2007 Total BAU-EU 6415 2121 1 The demand for primary energy reflects primary energy equivalents. For fossil fuels and biomass

these are defined as the net calorific input of fossil fuels or biomass (equal to the input in tons multiplied by the net calorific value), expressed in PJ. An equivalent amount of primary energy for processes without direct fuel consumption (wind, geothermal, hydro, nuclear, etc.,) are in accordance with the convention adopted in United Nations Statistics. For electricity producing facilities (both grid connected and non-grid connected) this is: 1 PJ of primary energy equivalent = 0.38 PJ of gross electricity produced. For heat producing facilities, this is: 1 PJ of primary energy equivalent = 1 PJ of gross heat produced.

2 Electrical efficiency = (gross electricity output / fuel input)*100

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (165)

134

Table A5.8.4 Power sector in India in 2010 in the Business-as-Usual scenario (based on TERI et al., 1999; Boudri et al., 2000a)

INDIA-2010 Demand for primary en-ergy (F)1

(PJ)

Gross electricity pro-duction (PJ)

Efficiencies2 (fraction)

Total Coal Oil Total Coal Oil Coal Built <2000 Other power plants 1310 1275 36 446 433 12 0.34 Built >2000 Other power plants 2046 1990 56 778 756 21 0.38 Built <1990 Large point sources 835 813 23 284 276 8 0.34 Built 1990-2000 Large point sources 563 548 15 214 208 6 0.38 Built 2000-2010 Large point sources 1089 1060 30 414 403 11 0.38 Cogeneration 500 500 75 75 0.15 All fuels Coal 5686 2077 Cogeneration (coal) 500 75 Oil 159 58 Natural gas 723 398 0.55 Nuclear 68 26 0.38 Bagasse 821 22 0.03 Wind 47 18 0.38 Large hydro 1398 531 0.38 Small hydro 9 4 0.38 Total 9412 3209 Total BAU-EU 9412 3430 1 The demand for primary energy reflects primary energy equivalents. For fossil fuels and biomass

these are defined as the net calorific input of fossil fuels or biomass (equal to the input in tons multiplied by the net calorific value), expressed in PJ. An equivalent amount of primary energy for processes without direct fuel consumption (wind, geothermal, hydro, nuclear, etc.,) are in accordance with the convention adopted in United Nations Statistics. For electricity producing facilities (both grid connected and non-grid connected) this is: 1 PJ of primary energy equivalent = 0.38 PJ of gross electricity produced. For heat producing facilities, this is: 1 PJ of primary energy equivalent = 1 PJ of gross heat produced.

2 Electrical efficiency = (gross electricity output / fuel input)*100

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (166)

An Asian Dilemma

135

Table A5.8.5 Power sector in India in 2020 in the Business-as-Usual scenario (based on TERI et al., 1999; Boudri et al., 2000a).

INDIA-2020 Demand for primary energy (F)1

(PJ)

Gross electricity pro-duction (PJ)

Efficiencies2 (fraction)

Total Coal Oil Total Coal Oil Coal Built <2000 Other power plants 874 854 19 297 290 7 0.34 Built >2000 Other power plants 2687 2628 59 1021 998 23 0.38 Built <1990 Large point sources 556 544 12 189 185 4 0.34 Built 1990-2000 Large point sources 563 551 12 214 209 5 0.38 Built 2000-2010 Large point sources 1089 1065 24 414 405 9 0.38 Built > 2010 Large point sources 2821 2759 62 1072 1048 24 0.38 Cogeneration 667 667 100 100 0.15 All fuels Coal 8400 3136 Cogeneration (coal) 667 100 Oil 190 71 Natural gas 1693 931 0.55 Nuclear 33 12 0.38 Bagasse 1280 35 0.03 Wind 129 49 0.38 Large hydro 2175 827 0.38 Small hydro 16 6 0.38 Total 14583 5168 Total BAU-EU 14582 5416 1 The demand for primary energy reflects primary energy equivalents. For fossil fuels and biomass

these are defined as the net calorific input of fossil fuels or biomass (equal to the input in tons multiplied by the net calorific value), expressed in PJ. An equivalent amount of primary energy for processes without direct fuel consumption (wind, geothermal, hydro, nuclear, etc.,) are in accordance with the convention adopted in United Nations Statistics. For electricity producing facilities (both grid connected and non-grid connected) this is: 1 PJ of primary energy equivalent = 0.38 PJ of gross electricity produced. For heat producing facilities, this is: 1 PJ of primary energy equivalent = 1 PJ of gross heat produced.

2 Electrical efficiency = (gross electricity output / fuel input)*100.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (167)

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (168)

An Asian Dilemma

137

6. Technological analysis of end-use energy efficiency

Author: Jaklien Vlasblom107

6.1 Introduction

This chapter studies the energy conservation potential in several important electricity end-use sectors. Most end-use studies focus on fuel efficiency and deal with electricity consumption in the peripherals. However, since this project studies the potential for modernisation of the electricity sector, the fuel consumption by end-use sectors is only described briefly, and fuel efficiency improvement potentials are based on rough assumptions. The selection of sectors for detailed analysis is based on their current share in total electricity consumption and the expected share in 2020 based on the growth in from 1980 to 1995 (see Table 6.1).

Table 6.1. Shares of sectoral electricity consumption in 1995 and the average annual growth in China and India.

India Share of total electricity

consumption

China Share of total electricity

consumption

China Growth (1980-1995)

Industry 46% 69% 7% Cement 4% of national cons. 6% of national cons. 12% Iron and Steel 4% of national cons. 12% of national cons. 7% Aluminium 3% of national cons. 4% of national cons. 10% Residential 17% 13% 15% Commerce 8% 7% 12% Agriculture 27% 7% 6%

The sectors have been introduced in Chapters 3 and 4 for India and China respectively. They can be divided into three categories: 1) the industrial sectors (cement, iron and steel, and aluminium) produce with suboptimal efficiency; 2) the residential, commercial and agricultural sectors use appliances and devices which consume more electricity than necessary; 3) two cross-cutting sectors are the cogeneration of heat and power and energy efficient electric motors and drives, which should be adopted where possible.

The methodology of the sector studies has been described in detail in Chapter 2, under ‘scenario approach’. A bottom-up analysis is used to describe the sector structure (historic output, number of plants etc. (also see Chapter 5) and technological options are studied and compared to the Global Best Practice technology. This detailed sectoral information is used as input to construct three scenarios: an end-use Business-as-Usual scenario (compatible with the Rains-Asia 2000 BAU scenario – see Chapter 5), and an end-use Best Practice Technology scenario per sector. Extrapolations were needed to construct the ‘other industries’ and transport sector in order to obtain full end-use sector coverage. The final result is an estimation of the technical energy savings potential per sector, and a set of technical options can help achieve those savings.

It is necessary to define the term ‘end-use Best Practice Technology (BPT) scenario’. It refers to the set of assumptions and calculations made on end-use efficiency in this chapter, of which only the integrated result is used as an option in the Best Practice Technology scenario in Chapters 7 and 9. Secondly, the following criteria are used for the

107 With contributions from Kornelis Blok, Jan-Willem Bode, Joyeeta Gupta.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (169)

138

technical options included in the scenario: currently available on the international market, already adopted by some actors in other countries, low- or reasonably priced108, reasonable turn-over of stock109, appropriate technology110. Hence, our potential includes more than an economic potential (some options are more expensive and are assumed to have implementation possibilities via special policies or international cooperation), and less than a pure technical potential because that often does not take any cost or other barriers into account.

A ‘frozen efficiency scenario’ has been added to each sector’s scenario construction, which shows the development of energy consumption assuming that energy efficiency remains constant at the level of the year 2000, irrespective of product mix changes. This means that the difference between the frozen efficiency and BAU scenario shows the effect of the efficiency improvement measures assumed to be taken in the BAU scenario (autonomous technological progress).

6.2 Cement Industry

6.2.1 Current situation (1990-2000)

6.2.1.1 Sector structure

Limestone, coal and electricity form the most important input in the cement production process (see Figure 6.1). Natural gas could, in principle, be used as a substitute for coal, but its availability is low in China as well as India (Das and Kandpal 1997; Sarathy and Chakravarty 1999: 54).

crushinggrinding, etc

limestone

calcinationsintering

Cement grinding

fuels

crushedadditives

Raw

mat

eria

lspr

epar

atio

nK

iln:

clin

ker

prod

ucti

onC

emen

tgr

indi

ng

preheaterprecalciner

cement

electricity

Figure 6.1 Schematic description of the cement production process.

The average annual growth of Chinese cement production was high (12%) in the period 1980-1998. This is about 50% higher than the average annual GDP growth (ca. 8.4%) and almost twice as high as the industrial average GDP growth in that period (5.9%) (see Section 5.2.2). The low output growth of recent years is caused by domestic reforms and the Asian crisis (see Figure 6.2). In India the average annual growth rate was 7.3% from the years 1985/86 until 1996/97. This growth was relatively constant compared to the

108 When expected that the technology will never be adapted at large scale in developed countries because of its

high price, it is not expected that China or India will achieve a high penetration rate. 109 It cannot be expected that all current technologies in use will be discarded or all current plants be closed long

before their economic life. 110 For example, not all ball mills in the cement industry is likely to be replaced by roller mills, because the latter

need high quality input material which cannot be obtained in all situations.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (170)

An Asian Dilemma

139

large fluctuations in the Chinese production growth (see Figure 6.2). In 1985, the cement production in China exceeded that in India by a factor 4.5 and in 1997 the difference increased to a factor 5.8. The expected production volume in 2020 can be seen in Tables 6.3 and 6.4. In 1997 the per capita production was around 450 kg/yr in China and 80 kg/yr in India (own calculations) compared to 450 kg/yr per capita consumption average for the EU in 2000 (Cembureau website 2001).

100

200

300

400

500

600

1980 1985 1990 1995 2000

Cem

ent

Pro

du

ctio

n (

Mto

n/y

ear)

ChinaIndia

Figure 6.2 Output of Cement (MTon/yr) in China (NBS 1999) and India111 (CMA 1998).

In both countries, a very large number of plants exists. In India (see Chapter 4), most plants are owned by private entities while in China, up to recently, state-ownership dominated. The average plant size is low: India had 14 plants in 2000 (www.cementindia/net) and China 12 plants in 1995 with an annual production capacity over 2 Mton, maximum 40 plants between 1 and 2 Mton and hundreds (India) and thousands (China) of mini plants producing below 300 Kton per year. The resulting small average capacity has a negative impact on the energy efficiency (112; Sarathy and Chakravarty 1999: 244; CMA 1998) However, large plants (>1 Mton) often consist of several small kilns, which might be similar to the kilns in small plants (UNDP 1993). Conclusions regarding economies of scale cannot therefore be easily drawn. The reason for the large number of small plants in China is the sudden economic growth and construction in the beginning of the 1990s (see Figure 6.3), resulting in the unparalleled fast construction of simple, vertical kiln cement plants, to satisfy the large demand for cement.113 The scale of the plants may impact the energy efficiency, together with the mix of production processes (see paragraph on ‘Sectoral Energy Consumption’).

The different production processes can be divided into vertical and rotary kilns (shares: see Figures 6.3 and 6.4). In China, about 80% of the total cement production is made in vertical kilns. This is an old technology which, in its simplest form, leads to low quality cement (it is therefore not allowed to be used in Chinese urban areas). However, after extensive retrofit, high efficiency and product quality can be reached. Most manually operated kilns have been converted into mechanised kilns to increase production output and quality.114 Traditional rotary kilns (lepol and long kilns) are slowly being phased out in China because of their inefficiency. The inefficient wet rotary kilns have not yet been phased out totally because they allow for low quality input. Modern processes exist such as the pre-heater, pre-calciner cement plant with integrated cogeneration.115 In India, the share of dry kilns has increased considerably up to almost 90% in 1997/98 but this

111 Indian data are for the fiscal year starting from the May in the year mentioned on the x-axis, upto April of the

next year. 112 Interviews (JV) 2000: 2 113 Interviews (JV) 2000: 2 114 Interviews (JV) 2000: 2, 3 115 Interviews (JV) 2000: 1

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (171)

140

includes vertical and rotary kilns (detailed data have not been found) However the share of wet kiln production is reducing drastically, resulting in an increased energy efficiency.

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

1985 1990 1995 1997

dry (new rotary)dry (old rotary)dry (vertical)wet (rotary)

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

1960 1970 1980 1993 1997/98

dry (rotary & vertical)semi dry (rotary)wet (rotary)

Figure 6.3 Process mix changing over time (1985-1997) of cement production in China.116

Figure 6.4 Process mix changing over time (1960-1997/98) in India (TERI 1994), (CMA 1998)

6.2.1.2 Sectoral Energy Consumption

The cement sector is an important sector to study because its 1995 share of national electricity consumption was 6% and 2.5% for China and India respectively, and 5 and 9% relative to industrial electricity consumption. The consumption of fuel accounted for an even higher share of national and industrial consumption (State Statistical Bureau 1998) (Das and Kandpal 1997). The total consumption of fuel and electricity in the cement industry has grown significantly (see Figure 6.5). The specific fuel consumption has decreased over the years, but the electricity consumption per ton of cement has been stable due to the compensating effects of the closure of old inefficient plants on the one hand and the construction of new plants with electricity intensive quality and emissions control and electricity intensive grinders.117 and 118 The costs of energy are high, and energy efficiency investments are therefore viable (119; Sarathy and Chakravarty 1999)120. The specific fuel consumption has reduced faster in India and is currently at a lower level than in China, possibly because of the higher share of large scale plants and a lower share of vertical kilns out of the dry process production.

116 Interviews (JV) 2000: 1 117 The closure of wet plants and replacement by more efficient dry plants is another example: wet grinding needs

less electricity than dry grinding (109 kWh/ton cement versus 122 kWh/ton), but the overall efficiency of wet plants is low (>6 GJ-final per ton clinker versus 4 GJ for dry plants) (TERI, 1995).

118 Interviews (JV) 2000: 1, 2 119 Interviews (JV) 2000: various 120 India: roller presses, high efficiency separators, grate coolers, cogeneration, etc. (Sarathy and Chakravarty

1999: 25).

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (172)

An Asian Dilemma

141

200

400

600

800

1000

1200

1400

1600

1800

1980 1985 1990 1995 2000

PJ

fin

al

fuel chinafuel indiaelectricity chinaelectricity india

1

2

3

4

5

6

7

8

1980 1985 1990 1995 2000

GJ

fin

al p

er t

on

cem

ent

(ele

ctri

city

) o

r cl

inke

r (f

uel

)

fuel Indiafuel Chinaelec Indiaelec China

Figure 6.5 Annual total fuel and electricity consumption in PJ-final/yr (various sources in Asian Dilemma scenario calculations, i.e. State Statistical Bureau (China))

Figure 6.6 Historical Specific Energy Con-sumption of Cement production in China and India in GJ-electricity/ton cement and GJ fuel/ton clinker (various sources in Asian Dilemma scenario calcula-tions)

6.2.2 Technological Options for Energy Conservation

The average specific energy consumption (SEC) per ton of cement is higher in China and India than the Best Practice plants in the world, because part of the plants use outdated technologies and the operation and maintenance is not optimal. For India it has been said that the large scale plants are generally up-to-date and that mainly the small scale sector has low efficiencies (Sarathy and Chakravarty 1999). Success stories in the 1990s have reduced fuel consumption considerably. In Table 6.1 the SEC values of China and India are compared to the SEC of the Global Best Practice (GBP) plant. This results in the maximum potential of energy conservation, in this case for the mid-1990s, of 40% of fuel consumption in China and maximum 30% in India,121 and at least 25% of electricity consumption in India and 20% in China122.

In future, BAU efficiency savings will take place, and the Global Best Practice will improve as well. In the following, the most important energy saving options will be discussed that could be adopted in the future. The 2020 Best Practice savings potential will be calculated in Section 6.2.3.

Table 6.2 Specific Energy Consumption (GJ-f/ton cement) compared to the Global Best Practice 123.

India (1997) China (1995) Global Best Practice Fuel consumption 4.4 GJ/ton clinker # 5.0 GJ/ton clinker ~ 3.05 GJ/ton clinker ^

3.24 GJ/ton clinker* 2.77 GJ/ton cement*

Electricity consump-tion

0.4 GJ-e/ton cement #

0.36 GJ-e/ton cement ~ 0.29 GJ-e/ton cement^ 0.34 GJ-e/ton cement*@

121 It is mainly the small scale sector that has large savings potentials in India. 122 The specific electricity consumption in China is low due to low-tech plants. As mentioned before, the state of

the art technologies generally have in a higher quality product and lower fuel consumption, accompanied by a relatively high electricity consumption. An improvement of the Chinese plants will therefore initially lead to an increase in SEC-elec.

123 Worrell (1995a): 0.36 GJ-e/ton ground clinker(+ assume 80% clinker per ton cement) *Japan 1992 (UNIDO, 1998) at 85.5% clinker/cement ratio; @ 0.25 GJ-e/ton cement possible (Sarathy and Chakravarty 1999: 339); ~ (SSB, 1998); various sources in Asian Dilemma scenario calculations.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (173)

142

Based on a detailed techno-economic analysis of energy efficiency options, a cost-effectiveness (supply) curve can be constructed. The following Box Item shows such a curve generated by Bode (1999) on technical options and their current potential to reduce energy consumption in the cement sector in India. The figure shows for each numbered technical option, the savings potential (horizontal axis) and the costs (vertical axis).

Box 6.1 Cost effectiveness curve for cement production in India (Bode 1999)

-6

-5

-4

-3

-2

-1

1

2

3

4

5

0 20 40 60 80 100 120 140 160 180 200

cumulative energy savings (PJ)

spec

ific

co

sts

(US

$/G

J)

1

2

3

4 5

7

6

89

10

11

12

1314

15

16

1 High-efficiency motors 9 New burners, including dual firing sys-

tem 2 Closed circuit milling 10 6 stage suspension pre-heater 3 Adjustable speed drives 11 Waste heat recovery 4 Process management systems 12 Conversion of wet to dry process with

suspension pre-heater systems 5 Replace old cyclone pre-heaters by new 13 Fluidised bed furnace 6 Adding new pre-heater with pre-calcination 14 Roller press as pre grinder 7 Improved housekeeping 15 Mineralisers 8 Grate cooler modification 16 Installation of vertical roller mills Options 1 and 3 account for a significant potential through the use of increased motor efficiency. This

will be dealt with in Chapter 6.8. Options 4 and 7 deal with a high savings potential via improved management and housekeeping. Those

exist of a list of management and small technical measures. Transforming a wet plant into a dry process, has a high fuel saving potential per retrofitted plant. But

since the share of wet plants has reduced drastically in recent years (see Figure 6.3 and 6.4), and the price is very high (cheaper options have been utilised), it is not considered to be an option in this study (Bode 1999). There are at least 59 wet kilns part of the Cement Manufacturers Association (CMA). Those are joint to bigger companies. An unknown share of the other 300 existing small kilns is likely to be using the wet production process (CMA 1998).

The fluidised bed furnace (nr 13) promises a large energy savings potential. This technology is not available on the market right now, and it is not known when market penetration of this technology can be expected. Fletcher et al (1998) assume this technology not being implemented before 2020.

The roller press and vertical rolling mill (Options 14 and 16) have a large potential per plant, but in In-dia the current penetration rate is higher than that of other options and the total potential is therefore not higher. The costs are higher than other options, and the total costs of saved energy are positive: the investment can therefore not be earned back during the life of the technology under current prices. The big advantage for this option is that it results in mainly electricity savings, which are fo-cussed on within this project.

Within this project, it was not possible to develop a comparable cost-effectiveness curve for cement production in China and neither for other sectors studied (Sections 6.3-6.8) due to data constraints. Therefore the most important technological options have been focussed on and will be discussed below. Feasibility issues are dealt with in Chapter 8.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (174)

An Asian Dilemma

143

New Capacity addition at Global Best Practice level

In the BAU scenario, new plants or capacity added by retrofitting124 are assumed to be based on domestic technologies125. For the Best Practice Technology (BPT) scenario, new capacity is assumed to be built at the Global Best Practice level. For projections for the future it is assumed that the specific fuel consumption with the Best Practice Technologies decreases by 0.5% per year. Considering the development of electricity use in cement production in the recent past, it is assumed that the electricity consumption remains unchanged in future.

Process mix

The process mix has improved in the last decade: production by the use of wet processes has decreased and the oldest vertical kilns have been taken out of production (China). New, modern pre-calciner and pre-heater plants have been built (see Figures 6.3 and 6.4) These measures were partly taken for product quality reasons (issue-linkage: see Chapter 2) and partly for environmental reasons. In the BAU scenario it is assumed that 70 MTon of production (100 MTon capacity) from old cement kilns will be taken out of production in China up to 2020, consisting of inefficient vertical kilns, wet and other old rotary kilns.126 In the end-use Best Practice Technology scenario 140 MTon of production could be reasonably stopped. Mechanical but inefficient vertical kilns need to close at a rate of 1% per year, on top of the above mentioned categories in the BAU scenario.

A major bottleneck of closing small plants is that their local importance is large: they provide a cheap product (often low quality) for rural areas where transportation would be either impossible or expensive. Furthermore, the local authorities keep the plants open for tax and employment reasons.127 There is a trend towards small plants merging locally in China. The policy should be towards reaching efficiency improvement in those larger plants, which might not occur in the BAU due to capital and administrative approval constraints.

Grinding system

The grinding (and mixing) system is the major electricity consuming process128. More efficient grinding systems exist, which simultaneously increases output quality but often an even higher quality is aimed for which results in a net increase of electricity requirement.129 The traditional ball/tube mill (AIT 1997) can be replaced by a roller mill or complemented by the roller press and an efficient classifier130. Roller mills and classifiers produced in China are said to be of low quality and their penetration rate is therefore low (131 ; Liu et al 1995).

124 In recent years, a large share of the capacity addition was achieved by retrofitting existing plants. New plants

are often not built due to administrative difficulties or location problems (Interviews (JV) 2000: 1,2). The effi-ciency of the additional capacity is therefore hard to predict.

125 The small-to medium capacity precalciner kiln is the most efficient plant manufactured by China (Interviews (JV) 2000: 1) and modern vertical kilns are expected to be built (Liu et al, 1995). In India precalcinators can be made upto 7.5 MT which are large scale (Ministry of Industry 1999: 60)

126 Interviews (JV) 2000: 1, 2 127 Interviews (JV) 2000: 2 128 70% of total electricity consumption (Interviews (JV) 2000: 1,2) of cement production takes place in the two

grinding steps: raw input material and clinker grinding towards final cement production (also see Figure 6.1). 12000 grinding mills were working in China in the beginning of the 1990s (UNDP, 1993)

129 Interviews (JV) 2000: 2 130 The technology which separates larger particles to be returned for further grinding. It reduces waste and there-

fore increases the cement output (by 8%) (Liu et al, 1995). If also increased output quality. 131 Interviews (JV) 2000: 1,2

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (175)

144

An improved grinding system can save 8-10 kWh/ton clinker out of total 25 kWh required on average for raw materials grinding input. For finish grinding (excluding grinding of mineral addition), 15-20 kWh/ton clinker could be saved relative to the 45 kWh average consumption (132 ; Cembureau 1997). When assuming average electricity consumption to equal 100 kWh/ton cement, the total electricity savings in this study are assumed to be at 25-30% per improved grinding system installed. This is similar to the UNDP (1994) estimated savings potential of 20-30% of electricity consumption.

The current and potential penetration rate of improved grinding systems is difficult to predict. 50% of India’s dry plants is said to have already adopted an improved grinding system (AIT 1997), which might refer to large plants only. This option is expensive for small scale plants, and as long as low priced and low quality cement is in demand in rural areas, the small-scale sector cannot be expected to make this type of investment.133 A merger between local plants and a regulation regarding grinders might be an option, but it would still be high-cost. Other barriers are the material input quality requirements of roller mills and presses, and the fact that owners do not want to dispose of the current system (sunk costs). It is illustrative that new plants in China use ball mills, which are sometimes even imported.134

Increased blending of cement

Blending of cement refers to the step in which clinker is mixed with additives to form cement. In the last decades, the share of clinker in cement has decreased from 90% to 84% in China and has been stable at 88% in India (CMA 1998) (State Statistical Bureau 1998). Increased blending of cement reduces the clinker demand and therefore the fuel consumption per ton of cement (Worrell et al 1995a). An extra CO2 emission reduction takes place on top of the fuel based emission reduction: the chemical process related CO2 emissions will also reduce per ton of cement.

Three major varieties of cement each have different characteristics regarding share of clinker, type of additives and strength135. When estimating the maximum potential blending, the limitations need to be taken into account, e.g. the total availability of additives -especially (granulated) blast furnace slag and pozzolane material-, the demand for additives from other sectors, as well as their geographic location in relation to the location of cement plants. The following assumptions have been made:

­ In the Business-as-Usual scenario for India the share of clinker in cement stays con-stant at 89% (which requires growth of additives use equal to total cement output growth). The Best Practice Technology (BPT) potential entails a reduction of 6%-points, to 83%136. The fuel savings in the BPT scenario are in that case 7% while the electricity consumption will rise slightly due to extra additives grinding and mixing.

132 Interviews (JV) 2000: 2 133 Interviews (JV) 2000: 2 134 Interviews (JV) 2000: 2 135 Ordinary Portland Cement (OPC) with 95% clinker and the rest gypsum, with a high early strength; Portland

Pozzolana (PPC) with 15-20% gypsum, fly-ask, brick bats, broken tiles etc. which cannot be used for high strength concrete and has 10% lower emissions than OPC (Das and Kandpal, 1997) OR 30% fly-ash and poz-zolanes135 (volcanic material) and a higher final strength than OPC (Worrell et al, 1995); Portland Slag Ce-ment (PSC) which includes 25-65% blast furnace slag and gypsum, has a lower early and higher final strength than OPC (Worrell et al, 1995) and 40% lower emissions than OPC (Das and Kandpal, 1997).

136 It is assumed that the output of OPC cement is sufficient for future purposes, that output growth will mainly be realised via PPC production and that PSC increases slightly, through more BF slag availability via a larger effort, e.g. the iron industry needs to produce more granulated slag instead of air-cooled slag, for which mini-mal investments are needed (Worrell et al, 1995). Das and Kandpal (1997) assume BF slag cement cannot in-crease and therefore arrive at a lower blending potential.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (176)

An Asian Dilemma

145

­ In the Business-as-Usual scenario for China the share of clinker in cement stays con-stant at 84%137. The Best Practice Technology (BPT) potential entails increased blending by 0.35% annually to 78% in 2020138. Improved government policy and awareness creation will increase additives availability and use up to levels mentioned by the expert.139 Fuel savings are then at a maximum of 7% and electricity use will increase slightly.

Implementation barriers are140: costs of additives are high because of transportation and competitive demand from other sectors; the general opinion is that blended cement has a lower quality than Ordinary Portland Cement (OPC)141 resulting in a lower market price. In industrialised countries the image of blended cement was also negative in the beginning; quality standards were not present and blended cements were limited in building codes. In the meantime it has generally been realised in industrialised countries that blended cement is functioning well and that it is even more suitable than OPC in certain applications (Worrell et al 1995). The lower quality might be existing if the grinding/mixing technology is not sufficient for blending, which might be the case in small, low-tech plants (personal communication Worrell 1999).

The Chinese government is in favour of using blended cements since the policy is that the producer will get tax benefits when blending more than 30% (clinker less than 70%). However, there are implementation difficulties since the local authorities are responsible for the enterprise taxes and is not cooperating with this policy of the central government.142

6.2.3 Scenarios and Saving Potential up to 2020

In the previous paragraphs, a bottom-up study was carried out. Knowledge was acquired on a) the historic development of production output, the sector structure, fuel and electricity consumption, and b) possible technological options to reduce energy consumption. This knowledge serves as a foundation of various assumptions to be made for this sector’s scenario analysis. Assumptions were made on the growth of physical output until 2020, on the autonomous Specific Energy Consumption (SEC) reduction in the BAU scenario and the reduction of the SEC under the BPT scenario for new as well as existing plants. Furthermore, the share of blended cement in both scenarios were projected. The assumptions are presented in Table 6.3 for China and Table 6.4 for India, given in the end of Section 6.2.

The following graphs show the total primary energy consumption in the frozen efficiency143, end-use BAU and end-use BPT scenarios for the cement sector. The expected growth of energy consumption is much larger in India than in China, in all scenarios, resulting in a possible absolute reduction of primary energy consumption in the Chinese Best Practice Technology scenario, whereas in India the energy consumption will be growing even in the BPT scenario. The 2020 maximum potential savings for fuel in

137 Expert’s opinion is that additive availability does not grow faster than cement output (Interviews (JV) 2000:

1) 138 Besides BF slags, slags from the non-ferro industry are expected to have a high potential availability (Inter-

views (JV) 2000: 1). Other interviewed cement experts as well as literature didn’t have information on in-creased blending in China

139 Interviews (JV) 2000: 1 140 Interviews (JV) 2000: 1 141 Small-plant owners feel that their quality is already low, and they don’t want to make it any lower by in-

creased blending (Interviews (JV) 2000: 1) 142 Interviews (JV) 2000: 1 143 See explanation in Section 6.1 Introduction. This scenario shows the energy consumption in case no efficiency

measures were taken from the year 2000 onwards.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (177)

146

China and India are estimated at 23-27%, whereas the electricity savings potential is much higher in India than in China (see Table 6.2). The results are explained and discussed in the overview (see Section 6.2.4) and conclusions will be drawn in the end of Chapter 6.

Throughout the demand sector studies it is assumed that the conversion factor from primary to final electricity is 35%, so that the countries can be compared to each other without involving the efficiency (changes) of the power supply side.

500

1000

1500

2000

2500

3000

3500

4000

4500

1980 1985 1990 1995 2000 2005 2010 2015 2020

PJ

pri

mar

y/ye

ar

Frozen EffBAUBP

200

400

600

800

1000

1200

1400

1600

1800

2000

1985 1990 1995 2000 2005 2010 2015 2020

PJ

Pri

mar

y /y

r

Frozen EffBAU-IndiaBP-India

Figure 6.7 Primary energy consumption for the Chinese cement industry under the assumptions of the (Frozen Effi-ciency), Business-as-usual (BAU) and the Best Practice (BP) scenario

Figure 6.8 Primary Energy consumption under the assumptions of the (Frozen Efficiency), end-use BAU and the end-use BPT scenario for the Indian cement industry

Table 6.2 Best Practical Technology savings potential relative to the end-use BAU scenario (PJ-final and Share of BAU consumption)

CHINA (2020) INDIA (2020) Fuel savings 680 PJ (27%) 220 PJ (23%) Electricity savings 47 PJ-e (14%) 42 PJ-e (31%) Total Primary savings 814 PJ-primary (23%) 339 PJ-primary (25%)

6.2.4 Overview

The annual output growth of cement has been very large in China (12% average between 1980-1998) and in India (7.3% average between 1985-1996), as is the number of plants in both countries. The average capacity per plant is very small and the plants are widely distributed over the countries due to high transportation costs and insufficient infrastructure. Availability of capital is another factor. Old process technologies are slowly being replaced by newer processes, often domestically produced and in a few cases imported technologies. The average specific fuel consumption has been reducing strongly over the last decades, but is still 30-40% higher than the Global Best Practice plant in 1995. The specific electricity consumption has stayed relatively stable and is less than 20% higher than the Global Best Practice. It is expected that in a BAU situation, the specific fuel consumption will reduce autonomously, but that the electricity consumption will increase slightly due to new air pollution control measures and the construction of new plants which have higher general control measures and output quality, resulting in lower fuel but higher electricity use.

A set of measures have been identified that can be used to reduce energy consumption on top of the BAU scenario. Important technological measures are: a) closing small, inefficient vertical kilns, wet process plants and old rotary kilns; b) installing high

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (178)

An Asian Dilemma

147

efficiency, modern pre-heater pre-calcination plants; c) improving the grinding system through installing roller mills, roller presses and high-efficiency classifiers; and d) increasing the share of additives to clinker in cement. For some of the options, the individual energy savings potential has been calculated.

The Best Practice Technology scenario shows the lower energy consumption possible when introducing new technologies and retrofit options at a reasonable rate (reasonable capital overturn and price not higher than industrial countries would be willing to pay). To construct the BPT scenario, assumptions were made on 1) production output: in China the output growth is assumed to be 2.5% between 2000 and 2010 and 1.5% from 2010-2020, in India 7% and 6% respectively. The reason for the low growth in China compared to the past decades is that there is already a large production capacity and a small growth is sufficient to cover the future additional cement demand; 2) the share of blended cement increases at a certain rate; 3) the Specific Energy consumption changes by a certain rate annually. All data and assumptions are presented and explained in Tables 6.3 and 6.4.

1. Deducing the BPT scenario energy consumption from the BAU, the maximum elec-tricity savings potential is calculated at 47 PJ-e (33%; China) and 42 PJ-e (14%; In-dia) of its BAU electricity consumption in the cement sector. The primary energy sav-ings are around 25% of BAU consumption for both countries. The reason that the relative savings are higher in India than in China, is that the expected output growth and therefore capacity addition (including replacement) is larger in India than in China, and that the 1995 specific electricity consumption of Indian cement production showed a larger gap with the Global Best Practice than the Chinese consumption, re-sulting in a higher Indian electricity savings potential. The fuel savings potential is larger in China for a similar reason: the gap with the Global Best Practice was larger in 1995.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (179)

148

Table 6.3 The main assumptions made in the scenario analysis for China GLOBAL BEST PRACTICE (1995) IS 3.1GJ fuel/ton clinker and 0.29 GJ elec/ton cement.

Current Situation (1995)

Business-as-usual scenario Best Practice scenario

Production 475 MTon cement

• 810 MTon cement in 2020 • 2.5% growth 2000-2010, 1.5% growth 2010-2020144

• Equivalent to BAU scenario

Existing plants • SECfuel decreases 2.1% per year (SEC 2020 equals GBP of 1995) • SECelec decreases 0% 1995-2010 (fuel saving and air pollution

reducing retrofit results in initial higher intensity) and 0.5% from 2010-2020 resulting in a SECelec 2020 of 0,35

New Plants

SEC fuel 5.0 GJ/ton clinker SEC elec 0.36 GJ/ton cement

• SEC fuel reduction of 1% per year (autonomous reduction145) to 3.9 GJ/ton clinker

• SEC elec increase of 0.5% per year146 to 0.41 GJ/ton cement

• SECfuel and SECelec equal the Global Best Practice of that moment, which reduces with 0.5% per year up to a 2020 level of 2.8 and 0.33 respectively.

Blending 84%

• 84% constant clinker share in the period 1995 to 2020 (requiring the share of available and utilised additives to grow at the same speed as the cement demand147)

• Share of blending increases with 0.35% annually so that clinker share reduces to 78% in 2020 (active government policy results in a higher utilisation (involving price, transportation) and higher availability of additives 147

144 11% growth 1985-1995 (NBS, 1999), 3% growth 1995-2000. Around 500 Mton will be produced in 2020 (Interviews (JV) 2000: 1, 2), (World Bank, 1995) 145 In the period 1981-1995 an annual SEC fuel reduction in key plants occurred equal to 1.2% (Liu et al, 1995), (NBS, various years). This resulted from a combination of efficiency improve-

ment in old plants and the construction of new plants (Liu et al, 1995). A slightly lower percentage (1%) is chosen for the future BAU energy efficiency improvement since other than key-plants need to be included, which are smaller and in a larger number, and therefore harder to retrofit. Furthermore, the growth of capacity, and therefore the installation of new plants, will be lower than in the past.

146 In the period 1981-1990 an annual SEC elec increase occurred in key plants, equal to 1.2% (Liu et al, 1995), whereas this increase was only 0.7 in ALL plants from 1980-1995 (NSB, vari-ous years). This resulted from increasing automation, pollution control etc, which might have happened at a higher rate in the key plants. New plants are also expected to have a higher en-ergy consumption, but since output growth from 2000-2020 is much lower than in the previous years, the number of new plants decreases and the electricity intensity increases at a lower rate (0.5% annually).

147 Based on calculations made in Paragraph 6.2.2 (option ‘blended cement’).

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (180)

An Asian Dilemma

149

Table 6.4 The main assumptions made in the scenario analysis for India GLOBAL BEST PRACTICE (1995) IS 3.1GJ fuel/ton clinker and 0.29 GJ elec/ton cement.

Current situation (1995)

Business-as-usual scenario Best Practice scenario

Production 65 MTon • 310 MTon in 2020148 • 7% growth from 2000-2010 and 6% growth from 2010-

2020

• Equivalent to BAU scenario

Existing plants

• SEC fuel decreases 2% per year, resulting a SEC 2020 of 2.9 GJ/ton cement • SEC elec decreases 0.5% per year up to 2020, arriving at a SEC 2020 of 0.37

GJ/ton New Plants

SEC fuel 4.1 GJ/ton clinker SEC elec 0.41 GJ/ton cement

• SEC fuel 1.2% reduction per year (autonomous) up to 2020, resulting in SEC of 3.4 GJ/ton clinker 149

• SEC elec 0% increase per year up to 2020 resulting in a SEC 2020 0.46 GJ-e/ton cement 150 • SECfuel and SEC elec equal the Global Best Practice of that moment, which

reduces with 0.5% per year, resulting in a SEC fuel 2020 of 2.8 GJ/ton clinker and SEC elec 2020 of 0.26 GJ-e/ton cement

Blending 89% • 89% constant clinker share in the period 1995 to 2020 (requiring the share of available and utilised additives to grow at the same speed as the cement demand 151

• Share of blending increases with 0.35% annually so that the clinker share reduces to 83% in 2020 151

148 The growth rate over the period 1985-1997 was 7.6% (Cembureau, ?). Partha Sarathy (1998) expect an 8% output growth in the coming decade. The Ministry of Industry expects around

200-250 Mt of cement output in 2020. In the 310 small plants the capacity is 9 Mt (Ministry of Industry 1999: 64; CMA 1999). The per capita consumption is 78 kgs in 1996 compared to 328 in USA, 333 in China and 642 in Japan (Sarathy and Chakravarty 1999: 244).

149 From 1985-1994 the SEC fuel reduction is 2.4% average, including retrofit and construction of new capacity. This is assumed to stay at half of this level, at 1.2% reduction per year upto 2020, since this high autonomous improvement is hard to maintain, and the reasons are not known within this study. Older plants can be renovated to achieve power consumption of 90-100kWh per tonne (Sarathy and Chakravarty 1999: 339).

150 The SEC elec has reduced from 0.50 to 0.41 from 1985 to 1995 and is assumed to stay stable since new plants and fuel savings result in an increasing electricity consumption, which com-pensates the ongoing retrofit of electricity consuming process steps.

151 Based on calculations in Paragraph 6.2.2, option ‘blended cement’.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (181)

150

6.3 Iron and Steel Industry

6.3.1 Current situation (1990-2000)

6.3.1.1 Sector Structure

Steel can be either produced from iron ore (primary steel) or from steel scrap (secondary steel). Primary steel is nowadays produced in Blast Furnace Basic Oxygen Furnace (BF/BOF). Another primary steel process which has been phased out in industrialised countries, but is still used in China and India, is the Open Hearth Furnace (OHF). Secondary steel is made out of scrap in an Electric Arc Furnace (EAF). Relatively new processes are the direct reduction of iron (DRI) and smelt reduction. The main processes are depicted in Figures 6.9 and 6.10.

co*ke

Blast Furnace

Hot metal

Basic OxygenFurnace

Continuouscasting

Batchcasting

steel

Slab,bloom,billet

Section, wire,rod, plate,pipe

Coal

Coal,electricity

Iron

mak

ing

Stee

lm

akin

gFi

nish

ing

scrappreparation

Electric ArcFurnace

continuouscasting

ingotcasting

slab,bloom,billet

section,wire, rod,plate, pipe

electricity

coal,electricity

Waste iron/steel

Inp

ut

prep

arat

ion

Stee

lm

akin

gfi

nish

ing

Figure 6.9 The main input material and process steps for producing primary steel through the BF/BOF process.

Figure 6.10 The main input material and process steps for producing secondary steel through the EAF process.

The growth of total output (see Figure 6.11) has been 5.4% p.a. in India152 and 7.4% p.a. in China in the period 1990-1999. The high average growth in China is mainly caused by the peak in the first years of the 1990s. The average output growth of the period 1971-1998 was 6.5% in China (MMI 1994; IISI 1997).

The share of the inefficient OHF production process is larger in India than in China, but is decreasing through shut down and no new construction of OHF, and transformation of OHF plants into BOF. The share of secondary steel production (EAF) is diminishing in China whereas it has been practically stable in India (see Figures 6.12 and 6.13) A reason is that EAF figures in India included Direct Reduction of Iron, which is increasing whereas the share of scrap input is reducing as in China (interviews India 2001: 15,16).

152 In terms of planning and projections by the Indian government, it is expected that the sector is all set for rapid

growth. From 1950-1970 the average annual growth rate was 8%, then it dropped to 5.7% in the 70s and rose to 6.4% in the 80s (Ministry of Steel 1999: 10). With liberalisation, the production of finished steel has jumped from 14.33 Mt in 1991-1992 to 23.37 in 1997-98. The Government of India aimed to reach 38 MT by the end of the 9th plan, i.e. almost a doubling of existing capacity. It is expected that internal demand for steel will increase to 48Mt and supply to 57.8 in 2006 by the end of the tenth plan. The goal is unlikely to be reached because of the depression in the economy. The current capacity is 32 Mt (Meeting India 2000: 32).

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (182)

An Asian Dilemma

151

20

40

60

80

100

120

140

1985 1987 1989 1991 1993 1995 1997 1999

MT

on

Cru

de

Ste

el p

rod

uct

ion

ChinaIndia

Figure 6.11 The annual production of crude steel in India and China (IISI 1997; IISI 2000b).

.

0,0%

10,0%

20,0%

30,0%

40,0%

50,0%

60,0%

70,0%

80,0%

90,0%

100,0%

1970 1975 1980 1985 1990 1995 2000

Sh

are

of

Pro

cess

in T

ota

l Ou

tpu

t

BOFEAFOHF

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002

shar

e o

f p

roce

sses

in t

ota

l ou

tpu

t

BOFEAFOHF

Figure 6.12 The shares of the 3 processes In the total steel output for CHINA in the period 1972-1998 (IISI 1997)

Figure 6.13 The shares of the 3 processes in the total steel output for INDIA in the period 1982 – 1995 and 1999 (IISI 1996; IISI 2000b).

The average size of primary steel plants is low in China and India153. Various steel products are manufactured, which are not high quality and complicated in China. The government policy is to reduce low quality production and start using modern equipment so that the import of steel (complex products) will reduce and export will increase. Foreign technologies might be needed for the quality upgrading, for example improved casting techniques but Chinese enterprises prefer small technological changes based on domestically available technologies because of capital restrictions.154 The current years might be most suitable to make this transition since the total demand for steel is low in these year.155 In India the situation is similar with the difference that modern and high-tech technologies are often manufactured domestically (in Indian or joint-venture machinery plants).

6.3.2 Sectoral Energy Consumption

The Indian and Chinese iron and steel sector accounts for a considerable share of the national and industrial energy consumption and is therefore an important sector to

153 The number of large primary steel plants in 1993 was very small in India (8 larger than 1 MTon) and China

(21 larger than 1 Mton and 20 between 0.5 and 1 Mton) between 1000 and 2000 small plants exist in both countries (MMI, 1994). EAF plants also have a small average plant size: in China almost all are smaller than 15 kTon/yr and the largest produces 50 kTon per year. In India 180 EAFs produce 50 kTon per year on aver-age.

154 Interviews (JV) 2000: 4 155 Interviews (JV) 2000: 5

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (183)

152

study156. It is likely that the plant owners are interested in savings since the costs for energy out of total costs is high due to inefficient plants and -operation as well as high unit cost of energy157. The total consumption of fuel and electricity has risen significantly (see Figure 6.14). The specific fuel consumption has reduced strongly whereas the specific electricity consumption is stable in both countries (Figure 6.15). It can be concluded that it is difficult in this sector to decrease electricity consumption, and efficiency improving options will therefore have to be supported actively.

500

1000

1500

2000

2500

3000

3500

1984 1986 1988 1990 1992 1994 1996 1998

En

erg

y co

nsu

mp

tio

n (

PJ-

f/yr

)

China fuelChina elecIndia FuelIndia Elec

5

10

15

20

25

30

35

40

45

50

1984 1986 1988 1990 1992 1994 1996 1998S

pec

ific

En

erg

y co

nsu

mp

tio

n (

GJ-

f/yr

)

China fuelChina electIndia fuelIndia elec

Figure 6.14 Annual fuel and electricity consumption (PJ-f per year) in the I&S sector in China and India (1980-1995).

Figure 6.15 Specific Energy and Electricity Consumption of crude steel production in China and India (GJ-f/ton steel*yr).

6.3.3 Technology options for Energy Conservation

The specific energy consumption (SEC) per ton of steel in China and India is higher than the Global Best Practice and higher than the average of the world, because of outdated technologies, non-optimal operation and maintenance practices, and –especially in the case of India, the high ash-content of coal. The maximum savings potential equals the difference between the Global Best Practice and the average Chinese and Indian SEC. The potential which can be achieved with currently available technologies is 35-50% per ton of produced steel, and is even higher when the future Best Practice Technology is accounted for (see last column of Table 6.5 and the last bar in Figure 6.16) with the newest technologies such as Smelting Reduction and Near Net Shape Casting (Worrell et al 1995b)158. In Section 6.3.3 the potential for the year 2020 will be calculated which is different from the above potential because of autonomous energy efficiency improvement in the Business-as-Usual scenario.

156 Out of national Chinese electricity and fuel consumption, 10% and 9% respectively are used by the steel sec-

tor. Relative to the industrial consumption, these figures are 15% and 18%. For India the share of national electricity and fuel consumption is 4% and 12%, relative to industrial consumption: 8% and 22%

157 For India, 35% was mentioned by some authors, whereas this is around 20% in industrialised countries. 158 Up to now smelting reduction has not shown to result in substantial energy use reduction

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (184)

An Asian Dilemma

153

Table 6.5 Global Best Practice and Indian and Chinese SEC in GJ-final/ton steel (various sources and assumptions159).

(1995) INDIA b) CHINA a) GBP Generally available Technol.

GBP Advanced Techn e)

SEC-elec Primary steel: 2.2 Secondary steel: 3.4

Average steel: 2.9 (prim+ secondary)

Primary steel 1.55 d) Secondary steel 2.67 d),f)

Primary steel 1

SEC-fuel All steel: 27 All Steel: 30 Primary steel 17 d) Secondary steel 3.83 d)

Primary steel 6

SEC Total g)

32 GJ-p/ton steel 38 GJ-p/ton steel

Primary steel 19.2 (Japan) c) Primary steel 21.5 d) Secondary steel 11.5 d)

Primary steel 9

5

10

15

20

25

30

35

40

CHINA INDIA GBP now GBP future

GJ-

pri

mar

y/to

n s

teel

Figure 6.16 Specific primary Energy consumption in China, India, current Global Best Practice (GBP) and the GBP expected in the future, from Table 6. (GJ-primary/ton Steel).

The SEC of both countries can be reduced towards the Global Best Practice by implementing certain changes in the production processes, in existing plants and via the closure of old plants and construction of new, more efficient ones. These options generally have an impact on fuel as well as electricity consumption, even though this study’s focus is on electricity savings.

Share of secondary steel: The EAF process is fed with scrap160 and requires less primary energy input per ton of steel output, compared to the primary steel process (see Table 6.5). The share of EAF has been stable at 25-28% in India (IISI 1996) and has reduced to 16% in China.161 The expansion of EAF is hampered by scrap scarcity162 and –in the case of India- the unreliable electricity supply and high price. The Indian scrap scarcity has

159 a) (MMI, 1994&1998); b) (TERI, 1996), (IEA, 1998); c) (SSB, 1998); d) Worrell, 1995, technical minimum

with current technologies, including 100% cold rolling (cold strip mill), and 15% scrap addition in the BOF process, full use of BOF gas and steam; e) Worrell, 1995, Smelt reduction and Near net shape casting ; f) 2.35 for a German plant in 1986: 450 kWh/ton (+200 for casting and rolling) (Johansson etc, 1989), but this figure is not used because the electricity use could have been increased in the period after 1986; g) assume BAU share: EAF 16% (China) and 25% (India) (IISI, 1996) and an electricity generation efficiency of 35% for both countries, to make comparison possible and for the Best Practice Technology scenario: EAF 30% (China) and 40% (India).

160 or directly reduced iron. 161 Interviews (JV) 2000: 5 162 Low cumulative steel usage in the decades upto 2000. Currently scrap is being imported which amount might

need to increase and improved waste collection methods will be necessary (Vlasblom 2000: 5).

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (185)

154

enhanced the development of Directly Reduced Iron163 which can be used as an alterna-tive for scrap. India wants to limit import of scrap because it drains foreign exchange and reduces the chance of survival of the domestic DRI industry (Soman and Bedekar, year unknown; 164). Other problems in the Chinese EAF sector (not checked for India) are the low quality and limited variability of output products, which is keeping the market de-mand low (Vlasblom 2000: 3). The Chinese government is promoting the closure of small EAF plants so that a few large scale plants can be built in the future (Vlasblom 2000:3).

The global share has reached 34% in 2000 and is expected to rise to 40% (IISI 2000a and b). It is assumed that in the BAU, the share of EAF steel will stay constant at the 1995 level while it will increase to 30% in China and 40% in India in the end-use Best Practice Technology scenario165. Implementation (feasibility) problems mentioned above, are also dealt with in Chapter 8.

Conversion from OHF to BOF: Most studies stress the option of reducing the share of OHF. Figure 6.12 shows that the output share has decreased drastically in China up to 2% in 1998 (Vlasblom 2000: 4,5). This is in accordance with the government policy to reduce it to 0% in 2000 (Vlasblom 2000: 4,5). This is therefore not an option for the Chinese end-use BPT scenario. The OHF use in India is showing a similar trend with a reduction from 41% in 1985 to 14% in 1999 (IISI 2000a and b); the BPT scenario can include an accelerated close-down compared to the BAU, but since all OHF plants can assumed to be closed in 2020 under the BAU, this option will not increase the 2020 savings potential.

Improved Casting Techniques: Since the share of Continuous Casting has increased tremendously over the last decade (see Figure 6.18), it is assumed that it will be adopted to the maximum extent in the BAU scenario166. The Chinese government is –after OHF production has been successfully limited- focussing on continuous casting technology, which increases the enterprises’ chance to obtain funding for investment.167

163 In India, 18 plants have a total capacity of 5.6 MTon producing (sponge) iron via DRI, making India the sec-

ond largest global producer (Department of Steel 1999: 3; Meeting India 2000: 31 ). 60% of capacity is gas based and 40% coal based whereas the share of coal based processes is only 8% globally (Spaan, 2000). The capacity is expected to increase to 7 MTon in 2000 (output 6 - 7 MTon). The output has grown from 102 kTon in 1985 to 4.4 Mton in 1995-96, but the export has risen as well, to 0.8 MTon in 1995-96 (IISI, 1996). The coal based process still has a high energy consumption. This process has to be supported by the government to grow further since the low availability of natural gas and non-co*king coal in India.

164 Interviews India 2001:15 165 This is based on the planned (but not achieved) 36% of secondary steel in India for the year 2001/2002 which

includes DRI technology (Steel authority of India ltd 6th Five Year Plan). The Chinese estimation it is based on a Chinese steel expert’s opinion of 25% in 2015 (Vlasblom 2000: 5). See footnotes Tables 6.7 and 6.8

166 Continuous Casting is an important option with its savings potential of 4.4 GJ primary/ton of milled product, but is assumed to be part of the BAU. Maximum penetration in China is estimated at 90% since it is not feasi-ble for small plants (Vlasblom 2000: 4). In the beginning of the 1990s 80% of the mini-plants has adopted continuous casting, and only 15% of the integrated steel plants (Schumacher, 2000).

167 Interviews (JV) 2000: 4

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (186)

An Asian Dilemma

155

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

1980 1985 1990 1995 2000 2005

CC/ ChinaCC/ India

Figure 6.17 The share of Continuous Cast steel output over time (IISI 1996). 168)

Future improvements of the casting process are expected by near net shape casting, which entails direct casting of the metal into (or near to) the final desired shape, e.g. strips or sections169. It replaces the step of hot rolling, saving heating energy and material losses. The implementation of this technology is assumed to be part of the Best Practice scenario to a limited extent170. Limitations include the fact that this is currently a very advanced technology even for developed countries, that it is not suitable for the casting of all products, and that existing plants that have (recently adopted) full continuous casting capacity, are not likely to invest in a near-net shape casting.171 The simple pay back period is around 3 years for industrialised countries. The savings of energy are calculated at maximal 4.2 GJ primary/ton crude steel for the western situation, for which continuous casting is in this project assumed to be the base line (International Working Group 2000).

Efficiency improvement: various172

35 kWh/ton iron (15-40 kWh in US situation (Worrell et al 1999) can be generated using a top gas recovery turbine (TRT) with the blast furnace173 and 174. The retrofit investment costs are relatively high (RMB 4000/kW ~ US$ 500/kW) but the payback period of around 3 years could be acceptable for plant owners and banks.175

The Blast Furnace gas can be used for different purposes: heating gas for the Blast Furnace process itself, generating electricity or using it for the rolling process.

Waste heat is generally utilised, especially in Integrated Steel Plants. Limitations are formed by the current high share of non-integrated plants in China (but the policy is to 168 Interviews (JV) 2000: 5 169 Slabs are produced with a thickness of 30-60mm., compared to the 120-300 mm slabs produced in continuous

casting. (International Working Group, 2000) A next step of improvement is Direct Strip Casting (1-3 mm). In China, sheets can be produced with 50-70 mm thickness, and the goal is to allow for 10-50 mm production. Less than 10 mm product output is very advanced for industrial countries (Interviews (JV) 2000: 4).

170 The ‘Technology Vision: 2020’ carried out by TIFAC resulted in a vision on the steel industry including the near net shape casting producing bulk tonnages of steel by the year 2010 in India.

171 Interviews (JV) 2000: 4,5 172 For India, it is known that the focus is on coal dust injection in the blast furnaces, mixed gas firing in stoves

and blast furnaces, on line ceiling of steam, blast and gas leakage; fuel efficient burners; optimisation of com-bustion and modification of thermal regime. These are measures taken by SAIL; TISCO is using higher by-product gases, lower petro fuel consumption, and has introduced a rich CO gas firing system in Sinter Plant. ESSAR is investing in change of reformer fuel, retrieving power from then turbo expander, decreasing tap to tap time in EAF, and Ferro Alloy Corporation is using hot charge mix directly to produce low carbon ferro chrome

173 Economic feasibility with minimum size 1000 m3, which are currently 44 furnaces in China, of which 12-16 have already been equipped with TRT and are producing half of current national output (Interviews (JV) 2000: 5)

174 Interviews (JV) 2000: 5 175 Interviews (JV) 2000: 5

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (187)

156

close the smaller plants of this category), and the current use of heat in, for example, district heating.176

Fuzzy Logic is a computer system that is more advanced than the standard computers or manual regulation, and adjusts the heat input to the amount of product processed which varies with time.177 Output quality improves and 40 kWh/ton steel can be saved in a US situation (Worrell et al 1999) but this might be depending on the plant size. Information has not been found on the current penetration rate of any computer regulation is not known in this project. In an EAF plant the pay-back period could be 1 year.

Waste heat can be used for scrap preheating before entering the EAF or BOF. (Levine et al 1995) (Worrell et al 1999). Electricity savings for US EAF plants were estimated at 0.36 GJ-e/ton steel, with additional benefits of flue gas emission reduction, reduced electrode consumption and increased productivity. The electricity savings depend on the scrap used and the oxygen levels in the combustion. The total pay back period is calculated at 1-2 years for large US furnaces (International Working Group 2000). The savings could be lower (and PBP higher) since the equipment as well as the scrap in China is often not of high quality (scarcity of scrap inhibits selectivity).178 Scrap preheating represents a particularly attractive retrofit option for Electric Arc Furnaces due to their high electricity consumption179. In 1991 Nadel et al estimated a 30% savings potential in Indian EAF plants, i.e. ca. 1 GJ-electric/ton.

The low share of Integrated Steel Plants in China results in a high average energy intensity in China. The sensible hot-metal heat losses could amount to 7.3 GJ-p/ton crude steel. Furthermore, the potential for scrap addition in the BOF decreases due to the heat losses. This is an additional loss since every ton of scrap used in the BOF instead of EAF saves 5.8 GJ-primary (generally scrap accounts for 10% of BOF input).

New Technologies: Pulverised Coal and Oil injection reduce the input of co*kes into the Blast Furnace (co*kes production is energy inefficient and polluting). Smelting Reduction produces hot metal from coal without the intermediate step of co*kes production, resulting in less pollution and increased energy efficiency (some of the smelting reduction processes are not more energy efficient than the original co*kes + Blast Furnace combination)180. Direct reduction of iron and fuelling the EAF with DRI was already mentioned in the first technology option (‘Share of secondary steel’).

176 Interviews (JV) 2000: 5 177 Interviews (JV) 2000: 22 178 Interviews (JV) 2000: 4 179 Technology options include: pretreatment of scrap (segregation and selective charging; pay-back period (PBP)

< 0.5 year); replace small by large plants; improve ladle preheating; scrap preheating (see Option 5); DC-EAF which saves 5-10% in US situation with PBP 3-4 years, however, only 4-5% savings in China (Interviews (JV) 2000: 4); Process automation: a varied set of options with PBP between 1.7 and 6 years; Variable Speed Drives on motors (see Chapter 6.8), (Worrell et al, 1999), (Interviews (JV) 2000: 4).

180 Several smelting reduction processes are still under development. COREX is already in the commercial stage. However, since there is no co*kes shortage and global capacity addition is small, there is no present demand. 4 plants have been built using the COREX process and 3 more companies have bought the design but have not built the plant up to now (Spaan, 2000). Capital investment, reduced plant space and coal gas generated are economic advantages of this technology, including the fact that also lower quality coal can be used as an input (Spaan, 2000). A Chinese expert is of the opinion that smelting reduction will not be used in China since the coal gas cannot be used for electricity generation (low heating value) so other utilisation will have to be con-sidered (Interviews (JV) 2000: 5). Opinions differ since this state-of-the-art technology is said to be under consideration (negotiation stage). It has a big potential and is not too expensive. Several demonstration plants might be in place in 2020. It is however not expected to be used at a larger scale since no new plants are ex-pected to be constructed (capacity addition often takes place via retrofit of existing plants) (Interviews (JV) 2000: 4). A Chinese institute (Chemical Metallurgy) has given an effort to developing a smelting reduction process (Liand and Xu , 1996).

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (188)

An Asian Dilemma

157

6.3.4 Scenarios and Saving Potential up to 2020

In the previous paragraphs, a bottom-up study was carried out. Knowledge was acquired on a) the historic development of production output, the sector structure, fuel and electricity consumption, and b) possible technological options to reduce energy consumption. This knowledge serves as a foundation of various assumptions to be made for this sector’s scenario analysis. Assumptions were made on the growth of physical output until 2020, on the autonomous Specific Energy Consumption (SEC) reduction in the BAU scenario and the reduction of the SEC under the BPT scenario for new as well as existing plants. Furthermore, the share of secondary steel production via EAF in both scenarios had to be projected. The assumptions are presented in Table 6.7 for China and Table 6.8 for India, given in the end of Section 6.3.

The following graphs show the total primary energy consumption in the frozen effi-ciency181, end-use BAU and end-use BPT scenarios for the iron and steel sector. The ex-pected growth of energy consumption is much larger in India than in China, in all scenar-ios, resulting in a possible absolute reduction (compared to 2000) of primary energy con-sumption in the Chinese Best Practice Technology scenario, whereas in India the energy consumption will be growing even in the BPT scenario. The 2020 maximum potential savings for fuel in India are –under the set of assumptions- much higher than in China, whereas the electricity savings potential is much higher in China than in India (see Table 6.6). The results are explained and discussed in the overview (see Section 6.3.4) and con-clusions will be drawn in the end of Chapter 6.

Throughout the demand sector studies it is assumed that the conversion factor from primary to final electricity is 35%, so that the countries can be compared to each other without involving the efficiency (changes) of the power supply side.

1000

2000

3000

4000

5000

6000

1980 1985 1990 1995 2000 2005 2010 2015 2020

Pri

mar

y E

ner

gy

Co

nsu

mp

tio

n P

J/yr

Frozen EffBAUBP

200

400

600

800

1000

1200

1400

1600

1800

2000

1980 1985 1990 1995 2000 2005 2010 2015 2020 2025

Pri

ma

ry E

ne

rgy

Co

ns

um

pti

on

(P

J/y

r)

frozen efficiency

BAU

Best Prac

Figure 6.19 Primary energy consumption until 2020 for different scenarios (PJ-primary/yr) CHINA.

Figure 6.20 Energy consumption in India in the three scenarios.

181 See explanation in Section 6.1 Introduction. This scenario shows the energy consumption in case no efficiency

measures were taken from the year 2000 onwards.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (189)

158

Table 6.6 The energy savings (PJ-final) and Share of BAU consumption in the year 2020 when the End-use Best Practice Technology scenario takes place instead of the Business-as-usual scenario.

INDIA CHINA Fuel savings 562 PJ (43%) 900 PJ (25%) Electricity savings 17 PJ-e (14%) 145 PJ-e (33%) Total Primary savings 612 PJ-primary (37%) 1314 PJ-primary (27%)

6.3.5 Overview

Similar to the cement sector, the annual output growth was high in both countries (7.4% in China, 5.4% in India in the period 1990-1999), and production share of the inefficient process (OHF) has reduced significantly over the last decades. The plants are relatively small, and especially in China, there exists a large number of specialised plants producing either iron or steel, whereas an Integrated Iron and Steel plant can have a higher efficiency level. The specific fuel consumption has decreased considerably in the past, but the electricity efficiency has reduced only slightly. The reason could be that electricity conservation is difficult to carry out, or that it has not been given priority. For India, another reason could be that the share of EAF has increased, which has a high electricity consumption (and a low fuel consumption). The average specific electricity consumption for the primary and secondary process routes is 35-50% higher than the best practice of currently operating plants. In future new technologies could become commercially available that will decrease the Global Best Practice even further, increasing the conservation potential.

The following energy conservation measures have been identified: a) increasing the share of secondary steel; b) near net shape casting; c) increasing the efficiency in the EAF through different smaller measures; d) miscellaneous options such as top gas recovery, fuzzy logic and scrap preheating; e) introducing new technologies when commercially available such as directly reduced iron, pulverised coal injection and smelting reduction; f) increasing the production share of integrated steel plants.

The Best Practice Technology scenario shows the lower energy consumption possible when introducing new technologies and retrofit options at a reasonable rate (reasonable capital overturn and price not higher than industrial countries would be willing to pay). To construct the BPT scenario, assumptions were made on 1) production output: in China the output growth is assumed to be 1.5% between 2000 and 2010 and 1% from 2010-2020, in India 4%. The reason for the low growth in China compared to the past decades is that there is already a large production capacity and a small growth is sufficient to cover the future additional steel demand; 2) the share of EAF is assumed to grow to 30% and 40% in 2020 in the best practice situation; 3) the Specific Energy consumption changes by a certain rate annually. All data and assumptions are presented and explained in Tables 6.7 and 6.8.

Deducing the BPT scenario energy consumption from the BAU, the maximum electricity savings potential is calculated at 33% (China) and 14% (India) of its BAU electricity consumption in 2020. The primary energy savings can be 24% and 37% respectively. It can be seen that the fuel savings potential is larger for India than for China and that the electricity savings potential is higher in China. This is based on the EAF potential that has been estimated higher for India and the fact that the Chinese specific electricity consumption shows a larger gap with the Best Practice in 1995.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (190)

An Asian Dilemma

159

Table 6.7 Assumptions on which the Chinese Business-as-usual and End-use Best Practice Technology Scenarios are based. GLOBAL BEST PRACTICE IN 1995 is 13.05 GJ fuel/ton steel AND 1.89 GJ elec/ton steel, assuming a share of 30% secondary steel.

Current Situation (1995)

Business-as-usual scenario End-use Best Practice Technology scenario (changes occur only after the year 2000. From 1995 – 2000, the BAU data are valid).

Production 95 MTON steel • 150 MTON steel in 2020 182 • 1.5% from 2000-2010 and 1% from 2010-2020

• Equivalent to BAU scenario

Existing plants • SEC fuel reduces 1.4% per year to end up in 2020 at 19.4 GJ/ton steel, 50% above the GBP 1995185 183

• SEC elec reduces 1% per year to result in a 2020 SEC at 2.17 GJ-e/ton steel, 15% above the GBP 1995 184

New Plants

SEC fuel 29.7 SEC elec 2.94

• SEC fuel 0.75% annual reduction up to 2020 183, resulting in a 2020 SEC of 22.1 GJ/ton steel

• SEC elec 0.5% per year improvement,184 resulting in a 2020 SEC of 2.39 GJ-e/ton steel

• SEC fuel and elec equal the GBP which improves by 0.5% per year Share of EAF/ secondary steel output

16% • Constant up to 2020 at the 2000 level of 16%. 186 • Is assumed to increase with 3.2% annually, as was predicted by the experts 186 arriving at a share of 30% in 2020.

182 The expert estimation is 140-145 MT (2015); 150 MT (2020) (Interviews (JV) 2000: 5). The government doesn’t give a long term estimation for this sector (Interviews (JV) 2000: 5). This

output in 2020 results in a per capita production of 100 kg annually, which seems reasonable given the per capita productions of 1992 (72 kg), 1998 (91 kg) and the global average in 1992 (143 kg). The annual output growth in the period 1980-1999 was 6.5% average (IISI, 1997; Interviews (JV) 2000: 5). This growth is assumed to reduce drastically to 1.5% from 2000-2010 and 1% from 2010-2020.

183 SEC fuel has reduced at an average rate of 1.4% per year from 1987-1996 (retrofit + new capacity). The future autonomous SEC reduction is assumed to be smaller (0.75%) since the pro-duction growth is assumed to be very low compared to the previous decade. The Best Practice reduction of retrofit of existing plants, is assumed to be equal to 1.4%. The 2020 SEC will not reach the 1995 GBP since the gap is too large (3.3% annual reduction via retrofit would be necessary).

184 The SEC elec has decreased at less than 1% annually between 1985-1995 (retrofit + new capacity). This is assumed to be even lower in the BAU future (0.5%) due to the low output growth and therefore low construction of new capacity. For the Best Practice scenario, it is assumed that merely retrofit of existing plants can reach that level of 1%.

185 One of the experts believes that the average Chinese plant will in the year 2020 be at the level of the average western plant, since Chinese plants are improving much faster than the western plants (Interviews (JV) 2000: 4). However, there is still a gap with the GBP expected in this scenario analysis.

186 For the BAU scenario a constant share is assumed (requiring scrap use growth equal to steel output growth) since the scrap availability is currently low and is not expected to grow signifi-cantly. The Best Practrice scenario is based on the assumptions of (Interviews (JV) 2000: 5): EAF: 15.8% in 1998; 20% in 2005; 25% in 2015.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (191)

160

Table 6.8 Assumptions on which the Indian Business-as-usual and End-use Best Practice Technology Scenarios are based. THE GLOBAL BEST PRACTICE (1995) EQUALS 11.7 GJ FUEL/TON STEEL AND 2.0 GJ-ELEC/TON STEEL, ASSUMING 40% OUTPUT FROM EAF.

Current Situation (1995) Business-as-usual scenario End-use Best Practice Technology scenario (changes occur only after the year 2000. From 1995 – 2000, the BAU data are valid).

Production 24 MTON steel • 55 MTON in 2020; 4% annual growth 187 • idem BAU scenario Existing plants • SEC fuel 2.8% reduction per year so that SEC 2020 is 16.9 GJ/ton cement

• SEC elec 1% reduction/yr so that SEC 2020 equals 1.96 New Plants

SEC fuel 27.4 GJ/ton steel SEC elec 2.51 GJ/ton steel

• SEC fuel 1.4% reduction/yr so that SEC 2020 is 19 GJ 188 • SEC elec 0.5% reduction/yr so that SEC 2020 is 2.17

GJ/ton steel • SEC fuel and elec equal in 2000 the 1995 GBP and improve with 0.5% annually Share of EAF/ secondary steel output

26% • Share of secondary steel output (and capacity) stays constant after the year 1995 189

• the share of secondary steel is increasing to 40% in 202 since India is active in building large EAF plants and using DRI technology189

187 The average annual growth of the period 1985-1998 was 5.4%. An extrapolation of this growth would result in a 2020 output of 73 MT, which is almost triple the 2000 output. This does

not seem correct, considering the opinion that the output should not more than double in the next 20 years (Meeting India 2000: 32). On the other hand, the per capita steel production would only rise to 46 kg/year in the year 2020, which is still low compared to the global average of 148 (in 1992). The Indian per capita production was 25 kg in 1995. Furthermore, the In-dian government estimation was an output of 57 MT in 2012 (and 37 MT in 2000) (Roa, ?). This seems overestimated since the 2000 production is below that number. Another high estima-tion came from Soman and Bedekar (year unknown) who assumed a GDP and steel output growth of 6.1% resulting in 52 Mt production in 2012. Other sources have mentioned 4-10% growth, and this study assumes the lower boundary of 4%.

188 The average SEC fuel has reduced at a rate of 2.8% per year in the period 1988/89-1994/95, when the production growth was on average 7% per year. Since the future capacity addition is expected to be lower due to the lower output growth (4% per year) the SEC reduction will also be lower in the BAU future, in this study at 50% of the autonomous rate, at 1.4%. The aver-age SEC fuel in 2000 is much higher than the GBP 1995 and can therefore not be expected to reach much closer to the GBP 1995 in the year 2020. The Best Practice scenario assumes the rate of improvement in existing plants can be 2%.

189 Steel Authority of India Ltd. The 6th Five Year Plan has presented a planned 36% of secondary steel in the year 2001-2002. Assuming that this has not been reached, but that the govern-ment and sectoral interest is still present, it is assumed that a 40% share can be reached in the future in the Best practice scenario. Business-as-usual, it can be expected that the EAF share stays constant, as was seen in China.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (192)

An Asian Dilemma

161

6.4 Aluminium Industry

6.4.1 Current situation (1990-2000)

6.4.1.1 Sector Structure

The Bayer-Hall-Heroult process is used to produce aluminium from bauxite190. This process has remained largely unchanged since 1886 (Ministry of Industry 1988). Alumina is extracted from bauxite, followed by production of aluminium by ways of electrolysis191. The aluminium is then shaped into various products (see Figure 6.21). Secondary aluminium is produced from scrap and is not depicted in the figures since the production volume is not known.

Bauxite(crushed/slurry)

alumina

Caustic soda

Alumina refining

alumiunium

Red mud, gas, dust

Electrolysis in smelter

Hal

l Her

oult

Bay

er

Electrolyte

gas

Ingot casting

0.5

1

1.5

2

2.5

3

1975 1980 1985 1990 1995 2000

MT

on

Alu

min

ium

Pro

du

ctio

n

CHINAINDIA

Figure 6.21 Schematic description of the (primary) aluminium production process.

Figure 6.22 The output of aluminium in India and China (Mton/yr).

Indian aluminium output growth (at 7.2% per year) was lower but more constant than in China (averaging 12% per year) in the period 1985 through 1998 (see Figure 6.22). In the 1980s, the growth rate in India was only 3.8% per year, partially caused by the government influence on the product mix (50% of the end product had to have a certain quality to be used in electrical industry) (also see Chapter 3).

The 10 largest aluminium plants (100-220 Kton per year capacity) in China produced 1.55 Mton of aluminium in 1998, and are called the ‘key plants’ which are generally state-owned, even though privatisation takes place within the recent reforms. The remaining 0.8 Mton was produced by approximately 90 small plants (below 35 Kton capacity per year), of which around half are privately owned.192 In China, there exist 4 medium to large companies (100-160 yr/yr capacity) that in 1996/97 jointly accounted for a large share of production (500 yr per year) (Das and Kandpal 1998; ADB 1996); Roy et al (1998). 2 large companies are state-owned, the remaining are in the private sector (Das

190 Export of aluminia and aluminium is restricted in China, (at least with taxes, and possibly also using other

regulations) since the domestic demand for aluminium is large while there is not sufficient bauxite. Therefore the Chinese aluminium should be used for the domestic market (Interviews Workshop China, 2000). India however has large deposits of bauxite, ranking 5th in the world (Wadhawan, 1992).

191 During the electrolysis, CO2 is released at the carbon anode. Even though this accounts for more than 10% of total CO2 emission (Das & Kandpal, 1998) it is not included in the project on hand since it is not an energy re-lated emission.

192 Interviews (JV) 2000: 7

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (193)

162

and Kandpal 1998). There probably exists a large number of small plants comparable to the Chinese situation. It is possible that merely casting takes place in those small plants.

6.4.1.2 Sectoral Energy Consumption

It is important to study the electricity savings in the aluminium sector, since it accounts for 4% of national electricity consumption and 6% of industrial electricity consumption.193 These numbers are 3% and 6% for India (Das and Kandpal 2000).

Table 6.9 shows the average electricity consumption per process step, which is similar for India and China. The electricity consumption per ton of aluminium differs widely per plant (also see Table 6.10). The Indian figure for aluminium production from alumina is an average of two larger plants with a SEC of 13700-15000 kWh/ton and two medium sized plants with a SEC around 18000 kWh/ton aluminium.

Table 6.9 Electricity consumption per step per kilogram of product (kWh/ton aluminium AC).

INDIA CHINA194 Electricity Electricity Bauxite -> Alumina 400 *# 500 Alumina -> Aluminium 16250 * 16050 Final Shaping of Aluminium 3000-3500 Auxiliaries 4-7% * 16778 (Das and Kandpal 1998); 16500 (ADB 1996) 16250 from Table 6.10; Average electricity consumption North America: 16015, Europe 15339; # lower figure than Chinese consumption because of higher grade ore available.195

The electrolysis of alumina to obtain aluminium (in the smelter) is the main energy (elec-tricity) consuming step, and will therefore be focussed on in this sector study. It is in in-ternational comparisons often taken as the base for comparison. In Table 6.10 it can be seen that Balco uses the normally inefficient Soderberg196 technology, and has a high electricity intensity, but its design value is lower than for the HINDALCO plant which is using the pre-baked technology.197 This might be caused by the age of plants and exten-sive renovation in later years. In general, the pre-baked technology has a higher efficiency because this technology has been developed further.

193 Interviews (JV) 2000: 7 194 Interviews (JV) 2000: 7 195 Interviews (JV) 2000: 7 196 The anodes used for electrolysis can be of two types: Soderberg (continuous self baking during electrolysis)

and the Prebaked anodes. Prebaked anodes have been prepared before use and are the more modern and effi-cient type (ADB, 1996).

197 Meeting India 2000: 16, 19, 44

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (194)

An Asian Dilemma

163

Table 6.10 Energy performance of the various plants in India in 1994/95. Sources: (Das 1998), completed by (Saxena 1999).

Actual per-formance

Anode type Alumina plant Smelter Smelter – design values

Company Steam T/T

coal Ton/T

Fuel oil kg/T

Power kWh/T

kWh/T kWh/T

HINDALCO Pre-baked Renukoot (UP) 4.2 1.0 76 362 15,341 18,000 BALCO Soderberg Korba (MP) 3.3 0.6 121 470 18,022 16,020 INDAL Total Indal 2.4 - 220 250 17,921 18,500 Soderberg Aluparam (Kera-

la) N/a N/a N/a N/a N/a

Pre-baked Belgaum #,* - - - 17,000 Pre-baked Muri * - - - 18,500 Soderberg Hirakud (Orissa)* N/a N/a N/a N/a 17,000 NALCO Pre-baked Angul (Orissa) N/a N/a N/a N/a 15,548 13,742 # Belgaum smelter not under operation, due to non-availability of power. * Design norms, actual performance data are not available. Total average as given in table however is weighted average of all INDAL plants.

6.4.2 Technology options for Energy Conservation

The current electricity efficiency gap between average Indian and Chinese plants versus the Global Best Practice is 25% (see Table 6.11). The plants in India are said to use technologies supplied by reputed international companies (Wadhawan 1992) but these are still less efficient than Global Best Practice. Retrofit and improved operation and maintenance is necessary to make the plants run at their design value. The calculated potentials are supported by ADB (1996) saying that a 15-20% reduction can be reached by modernisation and modification of almost all operations. It would be expected that the plants are interested in savings energy because energy costs account for 50-78% of total production costs in Indian plants (Das and Kandpal 1998). ADB (1996) gives the share of 40% for total energy costs and 30% for electricity input costs.

Table 6.11 Average Indian, Chinese and Global Best Practice (GBP) energy consumption per ton of aluminium (GJ-final/ton*yr) in the year 1995 (various sources 198).

INDIA CHINA GBP (GJ/ton steel) SEC-elec 63 b) 61 c) 47 a) SEC-fuel 30 b) 25 e) 18 d) SEC Total (final) 93 86 65 SEC Total (primary) f) 221 210 160

Studying the technical options and their potential of energy conservation is difficult199: a) limited information is available in China due to the high strategic importance and state-owned status of the sector; b) different sizes and types of electrolysis cells exist, which each have their own conservation potential; c) large plants are not automatically the most efficient plants. The efficiency depends partly on the size of the electrolysis cells; large plants often consist of a set of smaller cells and are therefore not more efficient than

198 a) 47 GJ-e (Levine et al, 1995): newest smelters in the beginning of the 1990s. 240 kWh (Interviews (JV)

2000: 7) + 12500 kWh/tonne aluminium (Phylipsen et al, 1998); b) 16778 kWh + 7.25 gcal fuel (Das and Kandpal, 2000); 16500 (ADB, 1996) + 400 kWh for alumina production; c) (Interviews (JV) 2000: 7); d) Slade in Germany (Ministry of Industry 1995), equals (Alber et al, 1992) in (Phylipsen et al, 1998); e) own es-timation based on (Interviews (JV) 2000: 7); f) assume 33% electricity generation efficiency

199 Interviews (JV) 2000: 6, 7

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (195)

164

plants with a small capacity200 and 201; d) electrolysis does not consist of several smaller steps which could be optimised: replacing the total cell is possible but can be considered equal to building a new aluminium plant with corresponding costs; e) it is not known if past retrofit options in larger plants202 have also been carried out in smaller plants. Some important options are mentioned here.

Change Soderberg into Prebaked electrodes: In China, the share of aluminium produced using the inefficient Soderberg anodes203 decreased from 80% in 1990 to 50% in recent years. Of the 10 key plants, already 70% of output is based on the alternative, more efficient, pre-baked anode- process204 and 205. In India, 2 large companies (60% of capacity) are equipped with pre-baked electrodes (Das and Kandpal 1998). Retrofit of plants from Soderberg to Prebaked electrodes has occurred in the past, and significant savings can be achieved, but it is an expensive option206. The construction of new plants (or extension of existing plants with new electrolysis cells) will increase the share of pre-baked electrodes. The Chinese government will force smaller Soderberg plants to either close or make the transition to pre-baked anodes207. The government might provide a special loan (70% of total costs).208 Closure of small plants might be the best efficiency improvement option since larger plants are generally more energy efficient.209

The savings could be 7.2 GJ-e/ton aluminium210, and assuming a 40% penetration potential in India, 1.5 PJ-e could be saved in the current Indian situation and 4PJ-e in China (4-5% of the sectoral electricity use for both countries). This savings potential will be smaller in the future because old plants will be closed and new ones with pre-baked anodes can be expected to be built under the BAU scenario.

Increase share secondary aluminium production: Secondary aluminium production requires only 5% of energy needed for primary aluminium production (Levine et al 1995). There is no information on the current share of secondary aluminium production in China or India211. In China, aluminium waste from the primary process is added to the process again; separate plants for secondary production do not exist (interview China workshop 2000). It should be realised that the quality is often lower than primary aluminium, reducing its suitability for certain high-quality products (Phylipsen et al 1998). An important barrier is the currently limited availability of waste do to low cumulative historic use and disposal of aluminium (similar to scrap in the iron and steel sector). 200 The Indian plants of nr 1 and 2 in size are also nr 1 and 2 with respect to electricity efficiency (a partial

explanation might be the recent commissioning of the nr 1 plant) (ADB, 1996). 201 Interviews (JV) 2000: 7 202 Increasing the quality and size of the electricity input line; improving and increasing the shape of the electrode

so that the electrolysis reaction becomes more efficient etc (Interviews (JV) 2000: 7). 203 If it has been developed further, this would have been an efficient technology (Bode, 1999). 204 Electrolysis cells based on Soderberg anodes are small sized (20-75 kA); most cells using prebaked anodes are

around 160 kA. In China, three plants exist with prebaked-based cells larger than 280 kA (Interviews (JV) 2000: 6, 7)

205 Interviews (JV) 2000: 7 206 The investment costs are high: 3750 US$/ton*yr and the specific costs are: > 100 US$ per GJ saved for India

(Saxena, 1999), (Fletcher, 1999), (Das, 1998), (TERI, 1996); CHINA: around US$ 2000/ ton aluminium, and a pay back period of 3-5 years (Interviews (JV) 2000: 7). The figures are very different for India and China and might be incorrect.

207 UNDP (1993) mentioned that small cells (<60 kA) should be eliminated and middle-size Soderberg cells could be improved by equipping it with a microprocessor and coating it with titanium boride, which will save power by 400-500 kWh/ton metal.

208 Interviews (JV) 2000: 7 209 Interviews (JV) 2000: 7 210 (Saxena, 1999), (Fletcher, 1999), (Das, 1998), (TERI, 1996). The transition will also increase production ca-

pacity. 211 From 1970-1985, this share in the total US aluminium production grew from 25-50%, including fabricators’

as well as post-consumer scrap (Williams et al, 1987). In India in 1992, the share of secondary aluminium production was far below the satisfactory level, around 10% of total consumption (Wadhawan, 1992).

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (196)

An Asian Dilemma

165

Computer controlled processes: Electricity consumption can be reduced through computer controlled processes, to make all parameters match. China can make such computer controlled process. It is not too expensive, but it might not be feasible for small plants.212 Two examples are automatic feeding of alumina and cell operation (ADB 1996)213.

Electrodes (miscellaneous): Several improvement options exist besides replacing Soderberg with Prebaked anodes214. These options together with improved computer monitoring could result in savings of around 400 kWh (1.5 GJ-e) /ton aluminium (UNDP 1993). Additionally, the rectifier could be replaced resulting in 2% savings potential (300 kWh (1.1 GJ-e)/ton aluminium) (UNDP 1993).

Alternative processes: The Bayer-Hall-Heroult process has remained largely unchanged since 1886 (Ministry of Industry 1988). Several organisations in the world are experimenting with alternative process routes that might be more energy efficient and cheaper. They are not yet commercially available (ADB 1996): a) the ALCOA process plans to reduce factory space, electricity consumption by 30% and direct emissions will be limited through a closed system; b) Carbothermic process uses carbon to chemically reduce alumina during electrolysis; c) Toth process claims to reduce costs by 50%, power input by 90%, and pollution problems totally215; d) Kuwahara Process plans to reduce power input as well as manpower by two-third216. If sufficient development takes place in the next 20 years, India and China could utilise these technologies for new plants to be constructed.

Specific Fuel saving measures: The extraction of alumina from bauxite is the main fuel consuming process. Measures mentioned in (UNDP 1993) are: a) Replace direct heating melting with indirect heating melting (with continuous desiliconisation); b) Apply flash smelting instead of rotary kiln; c) Apply middle ignition calcining process; d) Modernising the low efficient evaporators; e) Stoving the grog outside kilns through preheating; f) Falling film and flash evaporation. The current penetration rate or expected adoption under BAU is not known but the total savings could be up to 40% of the fuel used for alumina production according to the source (UNDP 1993).

212 Interviews (JV) 2000: 7 213 The pay back period for better process controls and other measures that reduce electricity intensity was 1-4

years in the first half of the 1980s (Levine et al, 1995). 214 a) improvement of anode design, increase anode surface area by redesigning existing cell; b) improvement in

cathode lining; c) inert Anode/ Stable Cathode (its high potential of 3500 kWh/ton alum is not included in this study because the commercialisation date is expected in the far future); d) adopt lithium anode paste with lithium salts or add lithium salts into electrolyte; e) widen power supply busbar and anode; f) semi-graphitized cathode (UNDP, 1993).

215 Clay and other aluminous ores can be used instead of bauxite. The process uses a fluidised bed reactor and chlorination. It is in the pilot stage (ADB, 1996)

216 Carbon and alumina are briquetted and heated, an alloy with several metals is made and purated resulting in 99.9% pure aluminium metal.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (197)

166

Box 6.2 Examples of efforts of Indian aluminium plants for energy conservation and environmental protection

Balco has an old plant and is gradually trying to take energy conservation measures in the alumina

plant, smelter plant with technology from Kaiser Aluminium technical services Inco USA, foundry (with technology from Almex USA) and the fabrication complex. They have planted 75,000 trees in 1998-99 (Balco 1999: 17). Hindalco claims that it has on an annual basis reduced its average power consumption per unit production, its bauxite consumption and steam consumption through fine-tuning of the system. Hindalco has ISO 14001. They have installed Gas suspension Calciners re-placing rotary kilns, a computerised firing system in baking furnaces and a micro processor based computerised control mechanism. They have planted 125,000 trees over the years. At Renukot, the Company uses cogeneration to generate 229.8 Million Units. Best Practice in India is 13700 kWh/tonne of Aluminium. This is a result of (among others) the following improvements: interna-tional (French) smelter technology, pre-baked anode with automatic centre feeding of alumina, con-trol of anode- cathode distance, optimum and steady alumina concentration, electrolytic pot design with dry scrubbing system for pot gases permitting use of highly acidic electrolyte (operation at low temperature possible) (Wadhawan 1992).

6.4.3 Scenarios and Saving Potential up to 2020

In the previous paragraphs, a bottom-up study was carried out. Knowledge was acquired on a) the historic development of production output, the sector structure, fuel and electricity consumption, and b) possible technological options to reduce energy consumption. This knowledge serves as a foundation of various assumptions to be made for this sector’s scenario analysis. Assumptions were made on the growth of physical output until 2020, on the autonomous Specific Energy Consumption (SEC) reduction in the BAU scenario and the reduction of the SEC under the BPT scenario for new as well as existing plants. The assumptions are presented in Table 6.13 for China and Table 6.14 for India, given in the end of Section 6.4.

The following graphs show the total primary energy consumption in the frozen efficiency217, end-use BAU and end-use BPT scenarios for the aluminium sector. The expected growth of energy consumption is much larger in India than in China, in all scenarios. The 2020 maximum potential savings for fuel and electricity are around 20% in both countries (see Table 6.12). The results are explained and discussed in the overview (see Section 6.4.4) and conclusions will be drawn in the end of Chapter 6.

Throughout the demand sector studies it is assumed that the conversion factor from primary to final electricity is 35%, so that the countries can be compared to each other without involving the efficiency (changes) of the power supply side.

217 See explanation in Section 6.1 Introduction. This scenario shows the energy consumption in case no efficiency

measures were taken from the year 2000 onwards.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (198)

An Asian Dilemma

167

100

200

300

400

500

600

700

800

1990 1995 2000 2005 2010 2015 2020

Pri

mar

y E

ner

gy

Co

nsu

mp

tio

n (

PJ/

yr)

Froz EffBAUBest Pract

50

100

150

200

250

300

350

400

450

1980 1985 1990 1995 2000 2005 2010 2015 2020

Pri

mar

y E

ner

gy

Co

nsu

mp

tio

n (

PJ/

yr)

Frozen EffBAUBest Prac

Figure 6.23 Energy consumption in the Chinese aluminium sector for different scenarios (PJ-primary/ton aluminium).

Figure 6.24 Energy consumption in the Indian aluminium industry for different scenarios (PJ-primary/ton aluminium).

Table 6.12 Aluminium Production: the energy savings of the end-use Best Practice Technology scenario relative to the Business-as-Usual scenario

2020 INDIA CHINA Fuel savings218 10 PJ (22 %) 18 PJ (20%) Electricity savings 21 PJ (19%) 39 PJ-e (18%) Total Primary sav-ings219

80.2 PJ-primary (19 %) 129 PJ-primary (18%)

6.4.4 Overview

The annual output growth has been extremely high in China and much lower in India (12% and 7.2%, respectively, from 1985-1998), especially due to government regulations in the 1980s in India. The electricity efficiencies were in 1995 almost 25% higher than the Global Best Practice. The technologies of Indian plants are said to be supplied by foreign companies, but these are still less efficient than the Global Best Practice level, and, on top of that, the actual efficiencies are often much lower than the design values. Operation and maintenance therefore seems to be an important measure to bring the actual operation to the design level of the plants. Other measures are a) the replacement of soderberg-using plants by ones based on prebaked electrodes; b) increasing the share of secondary aluminium production from scrap; c) increased and improved use of computer controlled processes; d) increasing the size of electrolysis cells; e) several electrode improving options; f) alternatives to the conventional process, ones they are commercially available.

The Best Practice Technology scenario shows the lower energy consumption possible when introducing new technologies and retrofit options at a reasonable rate (reasonable capital overturn and price not higher than industrial countries would be willing to pay).. To construct the BPT scenario, assumptions were made on 1) production output: in China the output growth is assumed to be 2.3% (2000-2020), in India 6% (2000-2020). The reason for the low growth in China compared to the past decades is that there is not a

218 Fuel consumption has not been focussed on, and therefore the consumption of alumina extraction from baux-

ite has not been included in this table. 219 Throughout the demand sector studies it is assumed that the conversion factor from primary to final electricity

is 35%, so that the countries can be compared to each other without involving the efficiency (changes) of the power supply side.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (199)

168

sufficient supply of bauxite and China is already importing bauxite and ingots; 2) the Specific Energy consumption changes by a certain rate annually. All data and assumptions are presented and explained in Tables 6.13 and 6.14.

Deducing the BPT scenario energy consumption from the BAU, the maximum electricity savings potential is calculated at around 19% (both countries) of the BAU electricity consumption in 2020. These estimations are conservative since the future possible alternative aluminium production processes have not been taken into consideration, and existing cells are difficult to renovate. India has a larger output growth (caused by a lower current per capita production) and therefore a larger share of new plants in 2020, but the resulting higher savings potential might be compensated by the fact that the penetration of prebaked electrodes in 1995 is higher than in China.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (200)

An Asian Dilemma

169

Table 6.13 Assumptions on which the Chinese Business-as-usual and End-use Best Practice Technology Scenarios are based. THE GLOBAL BEST PRACTICE IS 18.3 GJ FUEL/TON ALUMINIUM AND 46.6 GJ ELEC/TON ALUMINIUM.

Current Situation (1995)

Business-as-usual scenario End-use Best Practice Technology scenario (changes occur only after the year 2000. From 1995 – 2000, the BAU data are valid).

Production 1.9 MTON • 4 MTON in 2020, increase of 2.3% per year220 • dito BAU scenario Existing plants • SEC fuel reduces 1.3% per year resulting in 18.3 in 2020 (~ equal

to GBP 1995) • SEC elec reduces by 1.2% per year resulting in 46.3 in 2020 (~

equal to GBP 1995) New Plants224

SEC fuel 25 SEC elec 60221

• 0.5% SEC fuel reduction per year, resulting in SEC 2020 = 22.1 GJ222

• 0.5% SEC elec reduction per year, resulting in SEC 2020 = 53.7 223

• SEC fuel and SEC elec equal the Global Best Practice, which is improving by 0.5% annually, resulting in 16.6 and 41.6 GJ respectively

Share of secondary aluminium output

• Since no information is available on the (development of the) share of secondary aluminium, this is assumed to stay constant

• Dito BAU scenario

220 (World Bank, 1995) 4 MT in 2020. (Interviews (JV) 2000: 7) mentioned an output of 3.7 MT in 2010 and 5 MT in 2015. This study assumes a lower future production because of the fol-

lowing reasons: although import and export quantities are not restricted any longer, the taxes have increased which has stagnated trade. Bauxite, alumina and even aluminium ingots need to be imported because China’s supplies do not suffice. Future government and world mining regulations might restrict import in the future (Interviews China workshop, 2000).

221 The current best practice Chinese plant has a SEC elec of 50.4 GJ-e (Interviews (JV) 2000: 7). 222 It is assumed that 40% of unit fuel consumption and 15% of unit electricity consumption can be saved from several measures mentioned in (UNDP, 1993) 223 2020 expectation: average electricity consumption below 14000 in 2020 due to small plants being closed (Interviews (JV) 2000: 7). 224 In recent years, no new plants have been built in China (economic slow down). Building new plants is difficult since a good location needs to be found close to sufficient water and electric-

ity resources. Therefore existing plants are generally renovated to increase capacity, sometimes by adding new electrolysis cells (Interviews (JV) 2000: 6,7)

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (201)

170

Table 6.14 Assumptions on which the Indian Business-as-usual and End-use Best Practice Technology Scenarios are based. THE GLOBAL BEST PRACTICE IS 18.3 GJ FUEL/TON ALUMINIUM AND 46.9 GJ ELEC/TON ALUMINIUM.

Current situation (1995)

Business-as-usual scenario End-use Best Practice Technology scenario (changes occur only after the year 2000. From 1995 – 2000, the BAU data are valid).

Production 0.5 MTon • 2 Mton in 2020 via 6% annual growth from 2000-2020 225 • dito BAU scenario Existing plants • SEC fuel 2.4% annual reduction so that SEC 2020 is 18.3 (~ GBP 1995)

• SEC elec 1.2% annual reduction so that SEC 2020 is 46.3 (~ GBP 1995) New Plants

SEC fuel 30 SEC elec 60

• SEC fuel 1.5% annual reduction so that SEC 2020 is 21.9 GJ/ton aluminium, 20% above the GBP 1995 226

• SEC elec 0.5% annual reduction so that SEC 2020 is 53.3 GJ-e/ton aluminium, 15% above GBP 1995 226

• The SEC fuel and elec of 2000 equal the GBP of 1995 and improve by 0.5% annually

Share of primary aluminium output

• No information available and therefore assumed to stay constant

• Dito BAU scenario

225 The output growth between 1980 and 1996 has been 6.2% (TeddyO, 1997) and the 1995 per capita production was 0.56 kg. Das and Kandpal (2000) assume a scenario with 5.7% GDP

growth up to 2021 (7.6% upto 2006 (Das, 1998)) and a corresponding 6% aluminium demand growth. The corresponding per capita aluminium demand is 1.65 kg per year. The world aver-age is 5 kg per capita, 10 kg in Europe, 25 in the US (ADB, 1996) and 29 in Japan (Meeting India 2000:24). A higher production growth is possible since plans of constructing 3.5 MT ca-pacity has been talked of in the 1990s (ADB, 1996). Roy et al (1998) predict 2.5 MT will be produced in the year 2020. Some insecurity exists since India has become an exporting country since the middle of the 1990s, so the calculated production (which is equal to the domestic demand) might be lower than the actual production which might include increased export (Roy et al, 1998

226 Since there are no historic data available on energy consumption for aluminium production, a relatively high average autonomous improvement has been taken for fuel reductions (high output growth and therefore a high construction of additional capacity) and a relatively low electricity efficiency improvement level is used since it is difficult to achieve electricity conser-vation (electrolysis cells are difficult to retrofit unless fully replaced). Since there are less (small-scale) plants than in China, it is harder to close small inefficient plants in order to improve average electricity efficiency. The assumed SEC reduction is supported by Das and Kandpal (2000) who arrived at a similar al electricity consumption for 2020 (33 TWh/yr) with the same production growth.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (202)

An Asian Dilemma

171

6.5 Domestic Sector: Households, Commerce and Agriculture

6.5.1 Current situation (1990-2000)

6.5.1.1 Sector structure and Energy Consumption

The three sectors household (residential), commerce and agriculture have been combined into the Domestic Sector, since the model RAINS is structured in that way. Detailed analysis will be done for the three individual sectors. The highest domestic electricity consumption takes place in the Indian household and agricultural sectors and the Chinese household and commercial sectors (see Table 6.15). The Chinese agricultural electricity consumption will not be studied in detail since its importance in the future decreases (low growth in the past decades). The Indian Agricultural sector consumes 25-40% of its electricity for irrigation water pumps227. This is expected to grow and it is therefore an important sector to study. A detailed study of energy efficiency in electric irrigation water pumps has been done, presented in Section 6.6.

In the United States, two thirds of all electricity generated nationally, is used for the building sector (household, commerce and industrial buildings) (International Working Group 2000) The building sectors in China and India can therefore be expected to increase their power consumption share in the future.

Table 6.15 The share of the sectors in national electricity consumption (IEA 1997) and the average annual growth rate of energy consumption in the period 1990-1995 (India) and 1980-1995 (China) (IEA 1993 & 1997), (LBNL 1993).

1995 INDIA CHINA ELECTRICITY Share Growth Share Growth Share Households 16% 228 (12%) 13% (16%) Share Commerce 8% 229 (9%) # 7% (13%) Share Agriculture 27% (13%) 8% (5%)

The residential and commercial sectors are mainly using electricity for lighting, air conditioning and refrigeration230 (see Figure 6.25 through Figure 6.28).

227 Kirloskar Brothers, 2000. 228 Nadel et al (1991) say that in 1990 the domestic appliances consumed 11% of all electricity and lighting ac-

counted for 13%. 229 Table in (Nadel et al, 1991) for the period1980/81-1987/88. 230 For Japan (1996), the residential electricity is used for 16% for lighting, 18% refrigeration and 22% air-

conditioning (Proceedings Green Lights, 1998). United States: The largest energy consumers in residential buildings are space and water heating (49%) and refrigerator and space cooling (17%). In commercial buildings, lighting is responsible for 25% of primary energy use and water heating and space heating & cooling for 26%. The EIA projects refrigeration energy use to reduce its share from 9% in 1997 to 4% in 2020 due to implementation of standards and technological improvements. The share of commercial office equipment is expected to increase from 9 to 12% of the commercial building sector in 2020, through a demand increase over 2% per year. The techno-economic potential electricity savings in the advanced efficiency scenario are 26% and 37% for the commercial and residential sector respectively for the year 2020. Of these, around 65% is achievable with programs and policy. 20% is the policy-potential for refrigerators and freezers and 25-30% for lighting (International Working Group, 2000).

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (203)

172

21

107

179

50

airconditioninglightingrefrigeratorothers

14

36

21

airconditioninglightingothers

Figure 6.25 Electricity consumption by different applications in the Chinese residential sector in 1995 (PJ-electric/yr) (IEA 1997), (Nadel et al 1995), (CHEAA 1997), (Xin 1999).

Figure 6.26 Electricity consumption by different applications in the Chinese commercial sector in 1995 (PJ-elec/yr) (Xin 1999), (Nadel et al 1995)

lighting28%

A/C7%

Fans/coolers38%

refrigerator13%

other14%

60%

32%

8%

lightingHVACother

Figure 6.27 Share of total Electricity consumption by different applications in the Indian Residential sector (1989/90) (Nadel et al 1991).

Figure 6.28 Share of electricity consumption of applications in the Indian commercial sector (1989/90) (Nadel et al 1991)

6.5.2 Technology options for Energy Conservation

6.5.2.1 Lighting in China231

Energy efficient lighting is very important since it can save a significant quantity of electricity232. Global lamp use can be categorised in: incandescent lamps (has a large share in residential lighting), fluorescent lamps (commercial and industrial) and high intensity discharge (industrial and outdoor lighting) (Levine et al 1995).

The production of energy efficient (EE) lamps in China is large (6 billion pieces in 1998) of which a large share is exported. Unfortunately, it is mainly the good quality EE lights that are exported and the domestically used ones often are of poor quality. 180 million CFL lamps were produced in 1998, of which 57% was exported. 84 million T8 linear fluorescent lamps were produced (also EE lighting) and 26 million high intensity discharge lamps of 231 This study does not focus on electricity savings through a change in consumers’ habits. 232 Which is mainly peak hour electricity (Kedia, 1997).

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (204)

An Asian Dilemma

173

which 45% was exported in that year. The output of EE lamp production has grown, but the export percentage has grown as well (CALI 1998).

The Chinese market situation changes rapidly as can be seen from the fact that the number of lamp producers increased from 400 in 1993 to 1000 producers in 1999 (Lin 1999) There exists a mixture of large state-owned companies, small town and village enterprises and large and small joint ventures between Chinese and foreign firms (Nadel et al 1997).

Projects generally focus on increased EE lighting adoption in the commercial sector -which have already given good results233- since it is a relatively easy target. The industrial sector is often more interested in other types of energy saving234; and the residential consumer choices are difficult to influence235 (236 ; GLO 1998). An important program in China is the Green Lights Program, which is supported by the Chinese government (see Box 6.3).

Box 6.3 Green Lights Program China 1996-2000 (Nadel et al 1999;237)

Funded by: UNDP/World Bank (financial grant) and Government of China (staff, loans) Carried out by: SETC and BECON collaborate through Green Lights Program Office Goal: stock of 300 million EE lamps (CFL + T8) by the year 2000, resulting in a) saving 26 TWh in the

period 1995-2000; b) avoiding construction of 7.6 GW peak load power generating capacity; c) 30-40 billion RMB savings (~ 3.6-4.8 billion US$); d) SO2 emission reduction 0.2 MTON and CO2 emission reduction 7.4 MTON compared to the base line.

Activities and focus: capacity building via training, standard development, surveys, workshops, study tours, promotion (TV, radio, newspaper, magazines, local government promotion, exhibitions, news release)

Prospect of achieving goal: from 1995 through 1998, over 200 million energy efficient fluorescent tubes were sold, and over 100 million CFL’s; the prices of efficient lighting products have dropped; the availability and use has increased; the quality has improved; modern, newly constructed commercial buildings in major cities use 90% efficient lighting.

Difficulties encountered: pilot testing of guarantee programs encountered various problems. Furthermore, there exists the quality-price dilemma: the lower prices lamps have a very short life, because of which the buyers are not interested to buy again. The higher priced lamps have a very good quality, but the first-time investment is the main barrier, even though people know that they will earn their investment back. This is however not different from other countries (including developed countries). The aware-ness is still limited (Nadel et al 1999)

Follow up: it is planned to undertake a second phase of the project, focussing more on: CFL annual test-ing, result publication and certification, labelling, bulk procurement (mass consumption), increase technology levels with some manufacturers including raw materials (feasibility studies, payback pe-riod calculations, investment), research on how to improve the technology in China.

Five important options have been described below. A variety of implementation bottlenecks is in place in China: low quality lamps with no control; loss of consumers’ trust; high prices for good quality products; break-down with fluctuating voltage; consumers are interested in money savings at the moment of purchase, not after 1 or 2 years; aesthetic disadvantages for households; current sufficient power supply.238 Specifically for India, the subsidised electricity price is a large barriers, since it extends the pay-back period (Kedia 1997).

233 China: 90% of the lighting installed in new shopping malls is energy efficient (GLO, 1998) and also most other

new commercial centres are using EE lighting where possible (hotels, offices, restaurants, big shopping centres) (Interviews (JV) 2000: 10).

234 It is not clear whether EE lighting is included by plant owners in major renovations. 235 Initial costs and aesthetic characteristics play a large role in residential consumers’ decision making. 236 Interviews (JV) 2000: 10 237 Interviews (JV) 2000: 9, 10, 12 238 Interviews (JV) 2000: 9, 12

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (205)

174

EE Fluorescent Lamps (instead of conventional incandescent lamps): The incandescent lamps use 35-38% of lighting electricity consumed in India and China. The energy efficient alternative is the new Fluorescent Fixture, the circular fluorescent lamp and the Compact Fluorescent lamp (CFL) (Nadel et al 1991) (Nadel and Yu 1999). The savings potential when replacing a conventional incandescent lamp with a CFL are assumed to be 75%, based on various estimations239. The costs of implementing fluorescent lamps per saved kW in India were estimated at half of the costs of building a new peak load plant (in 1990) (Nadel et al 1991). The largest barrier to the large-scale adoption of these lamps is the low quality produced240,241 (China). The introduction in commercial offices has been relatively successful but is difficult in households.

EE Tube Fluorescent lamp (instead of conventional tubular lamp): A conventional 40W fluorescent tube lamp242 can be replaced by 36W (T10) or a 32W (T8) lamp, and T5 lamps are the state-of-the art series. 10% of electricity can be saved with each better model, and 36% can be saved when replacing a 40W lamp with a T5 (Nadel et al 1997).243 Total savings in India (2004/5) could be as high as 50-80 PJ-e using fluorescent fixtures244. The costs per saved kW are very low compared to building new peak power capacity, and lower than CFL implementation. The promotion and implementation is expected to be easier since 90% of all fluorescent lamp energy is used in the commercial and industrial sectors (Nadel et al 1991).

EE High Intensity Discharge lamps: Different types of HID lamps245 are (from least to most efficient): mercury vapour, metal halide, high and low pressure sodium (Levine et al 1995). Replacing mercury vapour lamps by metal halide or sodium lamps could give 40% savings. It requires the investment in a new fixture, but the pay-back period is less than 1.5 years (Levine et al 1995) (Nadel et al 1997). Still, policies might be necessary to increase sales to a significant level246 since the domestic market was stable (not growing!) in the second half of the 1990s (CALI 1998).

Improved ballasts: Electronic ballasts can replace magnetic247 ballasts and save energy, have a quick start, low noise level and long life. The initial costs are higher (Nadel and Yu

239 60-75% savings per unit of light output (Levine et al, 1995); 80% (a 25W incandescent lamp is equivalent to a

5W CFL) (Interviews (JV) 2000: 8); 75% (Kedia, 1997); 75% (Nadel et al, 1997), a 16 Watt CFL emits the same light as a standard 60 Watt incandescent lamp (Nadel et al, 1991).

240 For China’s situation, two categories of lamps’ quality: 1) more expensive, 30-50 RMB (approx. 4-7 dollars in the year 2000), maximum life 8000 hours; 2) low quality lamps, cheap, minimal 10 RMB, short life minimal 2000 hrs (compare to incandescent lamps of 5 RMB and maximum 1000 hours life (Interviews (JV) 2000: 8)). Quality of lamps is improving and good lamps are becoming cheaper. The current pay-back period for CFLs is 2400 hours using the electricity price of the end of the 1990s (Interviews (JV) 2000: 9); or according to Nadel et al (1997) less than 2 years when the lamp operates at least 3 hours per day and the electricity price is 0.5 yuan/kWh.

241 Consumers who had a bad experience previously, are not likely to try another lamp, even though a lot of lamp products have increased their quality (Interviews (JV) 2000: 9)

242 46% of lighting electricity is consumed by fluorescent tube lamps in China in the end of the 1990s while the number of lamps only accounted for 20% of the total (Nadel and Yu, 1999). In India, this share was similar (54%) in the beginning of the 1990s (later data not available). The Indian commercial and industrial sectors use 75% of their lighting electricity for fluorescent lamps (Nadel et al, 1991).

243 Interviews (JV) 2000: 8 244 Replacing TLD lamps, circular fluorescent lamps, and incandescent lamps. 245 In India (1990), about 10% of lighting electricity was used for HID lamps (Nadel et al, 1991). This figure equals

around 16% for China in the end of the 1990s (Nadel and Yu, 1999). Mercury vapour lamps are often used for industries and road lights.

246 Interviews (JV) 2000: 10 247 Relatively cheap, has a lower weight and can be used in voltage fluctuations in the range of 160-250 V (Inter-

views (JV) 2000: 7).

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (206)

An Asian Dilemma

175

1999). 25-45 PJ-e could be saved in 2004/5 via this replacement or 85% per replaced lamp. Similar to the previous options, the costs per saved kWh are lower than the supply costs of new power capacity. The Indian production suffered from quality control in the start of the 1990s (Nadel et al 1991).

The Government policy in China involves: articles in the Energy Conservation law devoted to EE lighting,248 support to the Green Lights Program (see Box 6.3) and the development of new standards. Mandatory standards exist which focus on performance and safety.249 Voluntary standards are planned to be developed, which could be connected to an energy saving logo. They are currently available for ballasts only and under development for CFLs.250 Monitoring is one of the basic problems251.

6.5.2.2 Energy Efficient air-conditioning and refrigeration in China

Figure 6.25 and 6.27 showed that refrigerators and air conditioners are important domestic electricity consumers252. Important electricity saving options are: improved compressors253; Variable Speed Drive254,255; Improved Heat exchange (refrigerators) and Cool storage (air conditioners)256.

The existing standard of both appliances are easy to reach257,258 for manufacturers in China and are therefore being updated. Another barrier is that the product price increases with extra EE measures.259 The 1995 savings potential is estimated at minimum 25% for refrigerators and minimum 20% for air conditioners (see Table 6.16)260.

248 Interviews (JV) 2000: 12 249 Interviews (JV) 2000: 10 250 Interviews (JV) 2000: 9 251 EE standards are difficult to integrate in building codes because there is a wide range of building codes. Volun-

tary policy with constructors could be prepared. There are draft guidelines available for hotels and shopping cen-tres, but they are not put into the pipeline because the approval process consumes a lot of energy (Interviews (JV) 2000: 10).

252 6% of residential and 20% of commercial electricity demand in 1995. Refrigerators in China account for 50% of residential consumption (CHEAA, 1997). Together around 8% of national electricity use in 1995. For India (in 1990) refrigerators (13% in households) and airconditioners/ fans/ coolers (45% in households). The commercial sector consumed 32% of its electricity for airconditioning.

253 State-of-the-art compressors are 5-13% more efficient than the ones used in Chinese airconditioners (Nadel et al, 1995). 0.9-1.4 TWh could be saved in the year 2004/5 for the Indian situation (Nadel et al, 1991) which is very limited.

254 VSD is said to be the most important option for airconditioners. This is valid especially for commercial aircondi-tioners (40% of total airco-electricity use (Xin, 1999)) since variable speed is necessary for continuous operation. In China, only 3% of airco’s include VSD whereas of the Japanese market 80% is equipped with VDSD. This can be explained by the higher standard of living in Japan and therefore the affordability of more expensive products (Inverviews (JV) 2000: 13,15,16).

255 For refrigerators, implementing the VSD seems a more plausible option for the near future. After the production of the CFC-free refrigerator, the VSD is said to be the second big change in refrigerator manufacturing (Inter-views (JV) 2000: 16).

256 Focal point for certain Chinese refrigerator improvement projects. Chinese manufacturers generally adopt this kind of technologies, and it must therefore partly be considered as part of the BAU (Interviews (JV) 2000: 13). An airconditioner with cool storage can reduce electricity consumption by 25% (Zhang Zhirong, AD workshop 1999). Likewise, improved insulation and door gaskets are necessary (Nadel et al, 1991).

257 The refrigerator standard was 1.6 kWh per day; all Chinese refrigerators were more efficient than that, and 1/3 even consumed less than 80% of that amount (CHEAA, 1997).

258 The 1996 standard is 2.65 in China, while the best split airco in Japan has an EER of 3.2 (Interviews (JV) 2000: 15). The 1996 standard is however similar to the ISO-5251 (BECon, 1999).

259 Interviews (JV) 2000: 13, 24 260 Nadel et al (1991) say (for India) that a room airconditioner of EER9 could save around 1.5 TWh in 2004/5,

HVAC efficiency improvements 2-4 TWh and a moderate and high efficiency refrigerator could save 3-5 and 4-6 TWh respectively in that year.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (207)

176

Table 6.16 The electricity consumption of conventional refrigerators and air conditioners, compared to improved (VSD) and new appliances261

Conventional Retrofit with VSD

New appliance without VSD

CHINA, 1995, Refrigerator 1.2 kWh/day 0.9 kWh/day 1 kWh/day INDIA, 1990, new Refrigerator* 1.5 kWh/day 0.7 kWh/day (New Korean 1990)

0.4 kWh/day ^ CHINA, 1995, Comm. Airco 1 kW/ton 0.8 kW/ton 0.8 kW/ton INDIA, 1990, Comm. Airco 1.05 kW/ton 0.9 kW/ton (US, 1990) INDIA, 1990, Room Airco * EER 6 EER 12 (US, 1990) * (Nadel et al 1991) ^ this should be possible if the size of Indian refrigerators doesn’t increase much since 1990 (Nadel et al 1991.)

6.5.3 Scenarios and savings potential up to 2020

The end-use scenarios for the residential and commercial sectors (lighting and appliances) are based on the following.

­ The RAINS-Asia 2000 BAU scenario for the residential and commercial sectors262 ­ The end-use BPT scenario assumes that the mix of products used is the same as in the

BAU scenario. Only the efficiency of the products reduces. ­ If the current lamps would be replaced by ones with the average western efficacy (lamp

mix stays constant), 40% electricity use reduction would take place, 60% if replaced by the best practice level (Min et al 1997).

­ If the current lamp mix changes so that the maximum share of EE lighting is included, 40% electricity reduction could take place (Nadel et al 1997). This method excludes the option of western level non-EE lighting.

­ In the residential market segment, a shift from incandescent to fluorescent can currently save 30% of electricity (IIEC 1999).

­ Cost effective measures could reduce lighting energy use by 35% in 1990 in India (Nadel et al 1991). Part of that potential might have been utilised since 1990, but future lamps will be more efficient and appropriate in more situations than in 1990.

­ In 1995 there existed a considerable savings potential for refrigerators and air condi-tioners. Since the penetration rate of appliances is still low (compared to developed countries), especially in the rural areas, and a high sales growth is assumed until 2020, the future savings potential is large.

­ The BAU scenario for lighting and appliances assumes to include 20% of savings po-tential263 compared to a frozen264 efficiency situation; the BPT scenario is assumed have an additional savings potential of 40%. This is based on the high side of the range of po-tentials calculated by Min et al and Nadel, and much higher than the potentials men-tioned in the previous section for appliances: those were valid for the 1990s, and better efficient lighting and appliance technology and high product sales can be expected for 2020. The same assumptions are made for India since no detailed study has been carried out for that country.

261 Interviews (JV) 2000: 16 262 The ‘domestic’ sector BAU scenario has been split into residential, commercial and agricultural subsector data. 263 The Green Light program is aiming at 10% savings in 2010, we assume this can increase to 20% in 2020. Some

experts mentioned that the increasing share of lighting in national electricity consumption, will be compensated for by lighting efficiency, which is here included in the BAU scenario (Interviews (JV) 2000: 9).

264 Same products but efficiency per product at 2000 level.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (208)

An Asian Dilemma

177

Table 6.17 End-use BAU265 and Best Practice Technology power consumption in the two sectors.

2020/ PJ-e BAU/ CHINA BPT/ CHINA BAU /INDIA BPT/ INDIA Households 1048 628 916 549 Commerce 760 456 894 536

6.5.4 Overview

Electricity in the residential and commercial sectors is mainly used for lighting, air conditioning/ fans and refrigeration. The Chinese production of Energy Efficiency light sources such as CFL, linear fluorescent tubes and high pressure lamps is growing steadily. One of the problems is the quality of the lamps: since the manufacturers want to keep the price low, the quality is low and customers loose their interest. Good quality lamps are mainly produced by joint-ventures and/or are exported. The government is trying to solve the quality problems by issuing standards and labels. In both countries, the voltage fluctuations are reducing the expected life considerably, and simultaneously the incentive for potential buyers. Special CFLs for fluctuating voltage are not in the market (known for India) which are slightly more expensive and less efficient than other CFLs. A large barrier in India is the low price households pay for electricity, reducing the incentive for potential buyers. This is also valid for household appliances. In general, programs to increase the penetration rate are difficult to carry out because of the large number of users.

Comparing the energy saving lamp’s wattage to a conventional lamp with a similar light output, an estimation has been made on the Best Practice technology savings potential. It is assumed that 20% of the current potential will be utilised under the BAU scenario, and an extra 40% savings can be achieved in the End-use Best Practice Technology scenario.

For air conditioners, refrigerators and other commercial and household appliances, efficiency improvement options have been described, such as improved compressors, variable speed drive, improved heat exchange/ cool storage, for which individual savings potentials have been calculated. The barriers are similar to the ones mentioned above for energy saving lights.

The total sectoral savings potential is assumed to be 60% compared to the frozen efficiency situation in which only the product number and mix changes, and not the average efficiency level. 20% will be utilised in the BAU scenario, and an additional 40% on top of BAU scenario exists in the Best Practice Technology scenario. The study has mainly been focussed on the Chinese situation because of the larger data set collected, and the Indian savings potentials are assumed to be equal to the Chinese situation.

265 From RAINS-Asia 2000 BAU scenario.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (209)

178

6.6 Irrigation Water Pumps (INDIA only)

6.6.1 Current Situation (1990-2000)

6.6.1.1 Sector Structure

This sector has been studied for the Indian situation since the share of national electricity consumption is between 25-40% and the sector is growing at high speed266. In China the pumps for irrigation use a relatively small share of national electricity use (<5%) which is decreasing (see Table 6.15), and therefore other sectors have been given the priority in the China analysis.

Electric water pumps consist of an electric motor which transmits mechanical energy to the prime mover of the pump. Water is sucked from the water via a suction pipe. A foot valve prevents water to exit and non-water substances to enter the suction pipe. The water exits the pump via the delivery pipe (Kirloskar Brothers 1998). There are two types of wells used for groundwater irrigation: open wells and bore wells, of which the first is only suitable for high water levels (using the centrifugal pumps) and the later can go as deep as 250 meters (using submergible pumps).267 Pumps are also used for pumping water from government canals (Jurrius 2000).

In 1992, around 5 million electric water pumps were in use (and 3 million diesel water pumps), in 1995: 10.8 million (TERI 1997) and in 1998 12 million pumps (and 6 million diesel water pumps268) (Ministry of Power 1998).

6.6.1.2 Sectoral Energy Consumption

The energy consumption for irrigation in India is estimated at 7.4 MWh/pump year by the Karnataka Electricity Board and 5.3 MWh by the International Energy Initiative (Jurrius 2000). The exact electricity consumption of pumps is not known for several reasons269 (also see Chapters 3 and 8). In this study, the average pump efficiency is assumed equal to 7 MWh/yr (TERI 1997), resulting in a national electricity consumption of 84 TWh (302 PJ-e) in 1998.

According to Pantoji (1998), 90% of the electric pump sets have a low efficiency. The Kirloskar Brothers (2000) say 80% of newly installed pumps are believed to be inefficient (do not meet the IS 10804 standard). At present the pump efficiency is low, the suction lift poor, the system bought does not match with the site or the well, the motor is inefficient, the pipes are undersized with too many bends, have inferior quality and there is poor maintenance (Kirloskar Brothers 2000). Technical potential options for improving pump efficiency are given in the following section.

266 (Kirloskar Brothers, 2000; meeting India 2000: 24; also see Table 6.15). 267 Meeting India 2000: 19 268 Electricity is mostly used in India due to the rural electrification program of the Indian Government. The second

most used energy source is diesel (Jurrius, 2000). Dual fuel pumps can be used, as well as renewable energy pumps (Mongia et al. 1994: 897).

269 The pumps are not individually metered and the annual operating hours vary strongly per region. A lot of pumps are labelled with a lower than real horse power to reduce the electricity bill in states where a flat rate system is used (Meeting India 2000: 24). Furthermore, it has been mentioned that higher electricity consumption by pumps might be presented to cover the large Transmission and Distribution losses (Ranganathan, 1998).

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (210)

An Asian Dilemma

179

6.6.2 Technological Energy Conservation options

The assumed current Indian average electricity consumption is 7 MWh/pump year, which should be compared to the Best Practice, which has been calculated at 3.5 MWh/ pump year in Retrofit Option 3 below.

Replacing foot valve: The efficiency of the foot valve depends on the design270. Adopting BIS standard footvalves increases efficiency. It is assumed that replacement of the foot valve results in 9% electricity savings, which is in line with several studies described in (Jurrius 2000).

Replacement of suction and delivery pipes: It is assumed that replacement of the piping system results in 30% savings271, which is in line with the several studies described in (Jurrius 2000). The problem with this option and the previous one, is that the flow often increases (especially with the often present oversized motors) resulting in extra low water tables in the wells (Sant and Dixit 1996).

Total Retrofit and new capacity: improved foot valve, pipes, motor and pump: This extensive retrofit results in a pump similar to a new one (life: 10 years). It is assumed that the electricity savings are 50%272. This option is most beneficial because all components can be properly matched, whereas in option 1 and 2 increased power requirement occurs due to matching problems (Sant and Dixon 1996).

COSTS of those 3 options: Considering the current subsidised electricity price (far lower than cost price), a discount factor of 16% and a life of 10 years, it can be calculated that only replacing the foot valve is an economically attractive option for the farmer. The other options have high investment costs, and because the electricity price is low, the Pay Back Period is longer than the life of the investment (Jurrius 2000). For the State Electricity Board, however, the investments are economically viable. Every kWh conserved results in less subsidy losses. It can be expected that farmers will not be interested with the current electricity price level, whereas the State Electricity Boards could invest profitably. There exist however institutional barriers (mentioned below). This option will become more attractive when real cost prices need to be paid by farmers.

Renewable Energy Pumps: Renewable sources of energy driving the water pump is an environmentally friendly solution. Solar-PV pumps have been technically developed, but the cost price is higher than a conventional pump. A subsidy system existed in the 1990s273. Wind powered pumps still have technical problems274 but are economically viable in rural

270 The opening diameter should match the maximum flow, and the connection with the suction pipe needs to fit ex-

actly. The valve opens and closes to let the water enter in batches. This should be gradual and not abrupt to pre-vent turbulence (Kirloskar Brothers, 1998). The friction in a lot of foot valves is too large.

271 The pipe size, length and windings should all be as small as possible and match the maximum flow rate and therefore limit friction. The material is also of importance: galvanised iron pipes create more friction than rigid PVC and high density PE pipes (Kirloskar Brothers, 1998).

272 This assumption is supported by the following experiment (in Rajasthan and in Tamil Nadu) showing an energy efficiency increase of 46-48% by replacing a pump of 7.5 Hp by 5 HP (Rajasthan) and from 5.0 to 3.0 HP (in Tamil Nadu), increasing the suction pipe top 75 mm from 50/65 mm, the delivery pipe to 75 mm from 65 mm, by using white PVC instead of GI, and by using a better quality foot valve compared to the local valve. (Kirlos-kar Brothers 2000).

273 The subsidies given in the beginning of the 1990s for PV were large but the end-user contribution was still 3 to 7 times higher than the conventional pump investment (Gooijer, 1997). It is only given to Indian PV and high import tax has been put in place for foreign-made PV. It has been predicted that the price of PV will decrease globally, but this might not boost the Indian PV pump market since the government might by that time have stopped subsidies (Jurrius, 2000).

274 Water pumps driven by mechanical wind energy have been set up in various pilot projects and generally failed due to improper siting and installation, lack of awareness, defective design etc (TERI, 1997). Nowadays, there are around 20 Indian manufacturers, but the technology still has a bad reputation.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (211)

180

areas with a relatively high average wind speed (3 m/s) and no grid available (Gupta 1997). Also the technology of biomass-fuelled pumps275 needs further development. Without subsidies, the option is not economically viable unless a lot of hours of irrigation per year are needed This option will have a bigger chance when the subsidies for grid electricity are reduced.

Jurrius (2000) calculated that all three renewable options are far more expensive than the electric and diesel pumps, from the point of view of the end-user as well as the subsidy providing government. The potential therefore lies in areas where there is no electricity grid, or (in the total country) when in the future the electricity subsidy is stopped.

6.6.3 Scenarios and Saving Potential up to 2020

The following assumptions have been made for the end-use BAU and BPT scenarios for the agricultural sector:

­ The BAU consumption equals the RAINS-Asia 2000 BAU scenario; to reduce com-plexity, it has been assumed that all electricity was used for irrigation pumps276. The expected growth of pump use (and the number of pumps) is high277.

­ Out of the total 50% savings potential (see Option 3 in the previous section), 20% is as-sumed to be achieved under the BAU scenario278. This means that the BAU scenario is 20% more efficient than the frozen efficiency scenario, and that plans, policies and trends need to be extended towards 2020 to reach this efficiency improvement. In the BPT scenario the sector could again be 30% more efficient (than the BAU scenario). In-stitutional and implementation issues will be dealt with in Chapter 8.

It should be taken into account that the ground water levels might be lower in 2020 and that the electricity input will increase for the same amount of water pumped.

For China, the total reduction potential is assumed to be 1/3 lower than for China279, with 10% already implemented in BAU, resulting in a 22% savings potential in BTP relative to the BAU agricultural electricity consumption.

A number of barriers and policies exist regarding this sector in India, e.g. the pricing policy (subsidies280; no individual metering). These subjects were introduced in see Chapter 3 and will be dealt with further in Chapter 8.

275 Biomass can be turned into producer gas and then be fed into the diesel pump motor up to 70-80% of total fuel.

Pump use can therefore be similar to electric or diesel pump, a long as sufficient biomass is availble. However, most of the pilot projects carried out in the 1990s were not successful, partly because the technology was not of sufficient quality (Mukunda et al, 1994).

276 The 84 TWh assumed to be consumed by pumps in 1998 was slightly larger than the agricultural electricity con-sumption from RAINS 2000 BAU scenario. This is caused by the split up of domestic into residential, agricul-tural and commercial sectors.

277 0.3 million units per year are assumed to be installed (excluding replacement of old pumps) since this number has been 0.3-0.4 million/yr from 1995-1998 and other sources are expecting 0.5-0.7 (Sant and Dixit, 1996) (Kir-loskar Brothers, 1998), which would double the number of pumps upto 2020 (meeting India 2000:9). Additional pumps are needed for: meeting the existing demand (farmers have to wait 10-15 years for an electricity connec-tion(Meeting India 2000: 9, 24)), growing demand for food products, the utilisation of available agricultural po-tential in North-Eastern regions with sufficient water supply (KirloskarBrothers, 2000).

278 The reason for the high BAU efficiency improvement is that the replacement of foot valves is economically fea-sible and a large number of new pumps will be bought up to 2020, which could partly be energy efficient.

279 No detailed information has been found for China, and since the future growth of pumps will be lower, the BTP potential is assumed to be lower.

280 Political reasons for not raising electricity price for farmers to cost price: (violence from farmers and political party loss of votes. Price of food might rise with raised electricity price (TERI, 1997), (Jurrius, 2000).

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (212)

An Asian Dilemma

181

6.6.4 Overview

This sector has been studied for the Indian situation, since the electricity used for irrigation accounts for 25-40% of national electricity consumption. The expected growth of the number of pumps is large, and since the water table is expected to decrease its height, this will stay an important energy using sector in the future. Retrofit options have been identified are: replacing foot valves, replacing suction and delivery pipes, and a total retrofit of valves, pipes, motor and pump. The total savings potential is 50%, out of which 10% is expected to be achieved in the BAU scenario, and 40% additionally in the Best Practice Technology scenario. These shares are lower for China since not sufficient information is available on the situation, and no importance seems to be given by the Chinese government.

Bottlenecks: a) It is not clear what the life is resulting from retrofitting of pumps since insufficient studies have been carried out up to now. Similarly, the efficiency of the retrofitted pumps might reduce significantly within its life (but this could also be the case for non-retrofitted pumps). b) There are constraints of the practical implementation. c) Most farmers are not aware of the EE improving options, and if they are, they are not interested because of the low price of electricity. They buy cheap materials to replace broken components, which results in non-matching of components of the pump.

6.7 Cogeneration of Heat & Power

6.7.1 Current Situation (1990-2000)

6.7.1.1 Sector Structure

Cogeneration of Heat and Power (CHP) is an energy saving process compared to generating heat and power separately. The generated heat is generally used for steam or hot water production. The generated electricity is used for the plant’s own consumption, and excess electricity can be sold to the grid or sold to other users directly and transported through the grid as well (this so called ‘wheeling’ is not allowed everywhere). In times of insufficient electricity production, electricity has to be bought from the grid. The profitability of CHP depends on factors such as transition and investment costs, and prices of electricity, fuel and back-up power, and tariffs for buy-back and wheeling. (Hendriks et al 1995)

Cogeneration can be carried out at plants level (only process heating), industrial park level (mainly process heating) or central level (process heat + district heating). For China it has been said that there is a quick recovery of costs at the plant level, whereas the central level is harder to be economically interesting since the price of heat is fixed and coal is still allowed to be used by the end-users. If end-users would be obliged to use gas, cogeneration would become profitable.281

The process heat is tapped from between the High Pressure and Medium pressure turbine. The residential heat (district heating) is taken from after the Medium pressure, which results in lower temperature heat and a higher electricity output. For China, it is not known what the ratio is of industrial cogeneration vs. district heating.282 In the beginning of the 1990s, the co-generated heat was often only supplied to industrial users (Liu 1993).

281 Interviews (JV) 2000: 21 282 Interviews (JV) 2000: 18

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (213)

182

6.7.1.2 Current use of cogeneration in China and India

The generated electricity from cogeneration in China has increased from 11 TWh (1980) to 70 TWh283 (1995) (Yang et al 1996) The share of national thermal power generation capacity has varied slightly between 9 and 12% in that period284 (285 ; Heping 1998). This share has not increased over 12% due to existing institutional barriers: lack of access to the grid for surplus electricity sales, and unfair pricing for electricity sold to the grid. These barriers should reduce in the future since China is in the process of creating a market place for electricity producers, creating opportunities for cogeneration (CCICED 1999). The distribution of cogeneration plant sizes and it’s average use is shown in Table 6.18.

Table 6.18 Size distribution of cogeneration capacity in China (Yang et al 1996).

Size Capacity in 1993 Main end-user < 6 MW 750 MW (or 15400?) Retrofits of boiler and old power plant 6-25 MW 4470 MW Chemical, textile, paper industry 25-50 MW 3300 MW > 50 MW 6875 MW*

Sugar mills, district heating, industrial park co-generation

* only 20 turbines over 100 MW (Heping 1998), mainly used for petroleum refineries, large chemical, large food processing, large district heating (Yang et al 1996) An interesting development is that there are only 4 manufacturers of small scale cogeneration at the moment, while there were many in the beginning of the 1990s. The economy is said to be working at a low level in these years, resulting a low interest in investing in cogeneration.286 However, where ever a stable heat demand is existing, and electricity can be supplied directly to end-users or to the grid, cogeneration can be used as an energy saving option (CCICED 1999).

For India, it is not known what the generation and structure is of cogeneration plants, except that the largest share is situated in the sugar industry (Dadhich 1997). The Indian government places stress on using biomass energy sources. In 1994 a programme was launched on bagasse-based cogeneration for sugar mills (various experts, personal communication, 1998).

6.7.2 Maximum potential electricity generation via cogeneration

In the Rains 2000 BAU scenario for China, 209 PJ-e is generated via cogeneration, which increases to 603 PJ-e in 2020287. The Indian Rains 2000 BAU doesn’t give information on co-generation. From Dadhich (1997) it is concluded that 36 PJ-e288 was generated in the mid 1990s and that 100 PJ-e in 2020 in the BAU is a reasonable estimation289.

For the Best Practice Technology scenario, calculations have been made on the maximum share of industrial heat demand that can be supplied by co-generated heat. The resulting maximum potential electricity generation from cogen is 881 PJ-e in China and 374 PJ-e in

283 39.6 PJ-e and 252 PJ-e. 284 From 4 GW-e in 1980 to 25 GW-e in 1998 of plants larger than 6 MW each (Interviews (JV) 2000: 7). 285 Interviews (JV) 2000: 17 286 Interviews (JV) 2000: 19 287 These figures are consistent with (Interviews (JV) 2000: 17) that says cogen accounts for 12% of total fossil-

based power capacity. 288 Assume 2.5 GW-e and 4000 hrs per year, which is uncertain and could even be much larger for industrial

cogeneration. 289 Other authors have estimated potentials from 100 to 320 PJ-e, and Dadhich said that 75 PJ-e exists in the sugar

industry, and in total 200 PJ-e cogen potential. It is in this project assumed that the sugar cogen potential will be utilised for a large share, and a small share in other sectors, resulting in 100 PJ-e.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (214)

An Asian Dilemma

183

India290, which does not include district heating (the total potential is larger). That calculation was based on the following assumptions: a) industrial fuel consumption for the cement, iron & steel and aluminium industry were taken from the industrial sectors’ BAU scenario developed for this project, and for other sectors the share out of 1995 fuel consumption was used (IEA 1997); b) the electrical and thermal (heat) efficiencies of coal-based cogen were 15% and 65%291; c) the share of heat used in industries in the Netherlands that can be supplied by cogeneration292 (Hendriks et al 1995).

The assumed maximum potential cogeneration shows almost a 50% and 400% increase for China and India respectively in the 2020 cogeneration compared to cogen in BAU. The potential district heating in 2020 has not be included in the calculation. However, the impact of this extra potential is small on the total BAU power generation emissions (2% and 4% respectively, see Sections 7.2.7 and 7.3.6). The reason is that the share of cogen out of total thermal power generation only increases by a few % points in the BPT scenario (from 10% in BAU to 15% in China and from 3% in BAU to 11% in India) and that the emissions per generated unit are lower but not equal to zero as in the renewable and nuclear fuel switch options.

The share of cogeneration in the European Union was 6% of total generation and 8% of total capacity in 1990293. The goal is to increase this share to 18% before 2010 (Hammar 1999) and the share in some EU countries is much larger (Netherlands: 20% of generation in 1990; Denmark: 50% of generation in 1999) (Hendriks et al 1995), (Hammar 1999). Difficulties occur since the liberalisation of the electricity sector is leading to a decline in cogeneration in many EU countries. In comparison to China and India, it could be reasoned that the their share of industrial electricity consumption is larger than in developed countries, which should give a higher industrial cogeneration potential. However, the large potentials in Denmark and The Netherlands consist for a large share of district heating. The demand for relatively low temperature heat is said to be much lower in India294 which should be similar in the south of China (warm climate).

Alternative option: gas based cogen. Gas could replace coal in fuelling the BPT cogeneration for the year 2020. Since the electrical and thermal (heat) efficiencies are 40% and 45% -very different from a coal-based turbine- more electricity will be generated to produce the same amount of heat as in the coal-fuelled situation. However, the gas availability is limited. Gas utilised for cogeneration would otherwise fuel central power generation. The GHG emissions per unit electricity generated are therefore similar in both situations (see results of calculations in Sections 7.2.7 and 7.3.6). In most industrial countries, additional gas is available via import (or own supply such as in the Netherlands) and in that case gas-based cogeneration instead of coal-based is an emission reducing option.

290 This is in the same range as the maximum potential mentioned by Dadhich (1996): sugar industry (75 PJ-e), dis-

tilleries (42 PJ-e) rice mills and textile industry (15 PJ-e each). The maximum potential might even exceed 300 PJ-e according to him. Other authors have concluded potentials varying from 100- 320 PJ-e (7,000 MW up to 22,000 MW).

291 The national average thermal efficiency in the 1990s was 60% and the government rule is that it should be larger than 45% and the ratio of produced heat and elec larger than 100% (Interviews (JV) 2000: 17).

292 Bode (1999) assumes that this CHP share is also achievable in India and China, except for the share of CHP in the Indian Food and Tobacco industry which could be higher (75%) since the sugar industry has a large CHP po-tential, and is in India is the largest energy user of the subsector; and the non-specified fuel (IEA, 1997) is sup-posed to have a 25% share suitable for supply by CHP. Other shares: Iron and steel 10%, chemical 19%, non-ferrous 20%, non-metallic minerals 2%, machinery 2%, mining and quarrying 0%, paper pulp and printing 91%, textile and leather 12% (Hendriks et al, 1995).

293 This includes public utilities and autoproducers, of all sizes and all fuels. 294 Interviews India 2001: 10

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (215)

184

Box 6.4 Increased use of cogeneration in the cement sector Cogeneration in the cement sector is possible in two cases: the Long hollow rotary kiln and pre-heater ro-

tary kiln. The potential for this option is relatively low in China for the following reasons295: The long dry/hollow kiln is a very old type, is not being built anymore, and is slowly being phased out. In

the end of the 1990s, 100 kilns were still working, producing only 2% of the Chinese output of cement and most were already equipped with cogen.

The Pre-heater kiln is the most modern type, and is automatically equipped with a cogeneration facility. Two recently imported large plants are using cogeneration. The largest kiln has a 1.5 MTON annual clinker capacity (4 kt/day), then 7000 kW power is generated. If the kiln has a 0.7 MTON clinker ca-pacity (2 kt/day), 2800 kW can be generated;

Cogeneration is expected to be included into new pre-heater pre-calciner plants in the business-as-usual scenario and therefore not considered to be a policy option in this study.296 Globally, CHP didn’t play a big role in cement production in the beginning of the 1990s (Worrell et al 1995).

Specific bottlenecks for increasing the share of cogeneration are: a) the Chinese government is of the opinion that small scale cogen can be adopted via independent investment of industries, as a part of industrial competition and that only large-scale cogen needs government support.297 However, small industrial plants cannot afford the investment for cogeneration, and the larger plants already use it where it is commercially attractive;298 b) The low price of electricity and coal reduces the interest of end-users in investing in an energy saving option such as cogeneration;299 c) the government put up barriers to protect the central power sector, e.g. maximum units of cogeneration power than can be sold to the grid and a relatively low buy-back tariff;300 d) industries are not interested in producing low temperature heat for residential use since it is difficult to receive payments (the plants are not receiving the 70% of total revenues that would make it economically interesting for them). However, the residential users are interested in hot water from district heating because they are not allowed to use small coal boilers in large residential areas.301

Government policy in China: A new Chinese government policy on cogeneration is being made (approval by one of the institutes has already been received in Spring 2000). The contents of the new policy is not known.302 An existing rule is that cities with more than 100000 inhabitants need to schedule cogeneration facilities, mainly for paper and chemical industries, but also other types of users.303 The Environmental Protection regulation says that power generators with < 200 MW have to use cogeneration. At this moment the sanction is not closure for the larger plants, but this is carried out with plants smaller than 50 MW without cogeneration.304 Since small boiler houses are not allowed in residential areas, resulting in the necessity for district heating, which is promoted by the government. A simultaneous advantage is that indoor air quality and thermal comfort will be improved (Liu 1993 or Yang and Yu 1996) A problem is that in summer the heat demand is low.305 Since there is sufficient electricity supply these years, the State Power Bureau is not approving any power plants, except for those combined with heat production.306

295 Interviews (JV) 2000: 1 296 Interviews (JV) 2000: 1 297 Interviews (JV) 2000: 17, 18 298 Interviews (JV) 2000: 21 299 Interviews (JV) 2000: 21 300 Interviews (JV) 2000: 17 301 Interviews (JV) 2000: 17 302 Interviews (JV) 2000: 18 303 Interviews (JV) 2000: 17 304 Interviews (JV) 2000: 18 305 Interviews (JV) 2000: 18 306 Interviews (JV) 2000: 18

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (216)

An Asian Dilemma

185

Cogeneration applications smaller than 25 MW per unit can be decided on by the local government while the bigger ones have to be approved by the central government (reason: to reduce work load of central government). For the small scale projects, CECIC is preparing a list of criteria, technical regulations including updated technical parameters, that the central government will give to the local government to base their approval process on.307

Government policy in India: The Ministry of Non-conventional energy sources focuses on two areas: convincing the industry to utilise CHP where possible, and persuading the State Electricity Boards to provide the option for industries to sell excess electricity to the grid. The focus in the mid-1990s was on the sugar industry, which has a very large potential (3500 MW) (Dadhich 1996). The focus in India is on cogeneration using renewable sources, which can be seen in examples of recent projects308. Use of advanced technologies such as Biomass Integrated Gasification-cum-Gas Turbine Combined Cycle which would enable production of almost twice the useful energy from the same biomass, are also being explored. A revised policy document is expected in 2002.309 Within this project, no information has been found on the current policy is for fossil-fuelled and larger scale cogeneration.

6.7.3 Overview

In China, a large share of electricity is currently being generated through cogeneration. Government policy is to increase this type of electricity production in all sectors. In India, the main thrust is on cogeneration with renewable sources, e.g. using bagasse in the sugar industry. Cogeneration can be carried out at different levels (large scale, industrial park, individual plant) with either industrial process heat or district heating as thermal output. It has been calculated that at least 881 PJ-e could be produced in 2020 in China via cogeneration, and this number is at least 331 PJ-e in India. The Business-as-usual cogeneration has been assumed, and the resulting cogeneration potential in China is 46% more than in the BAU situation, and 274% for India.

6.8 Motors & Drives

6.8.1 Current Situation (1990-2000)

6.8.1.1 Sector Structure

Motors are the largest end-user of electricity in most countries in the world. They are used in every sector, making it a so-called cross cutting technology. The energy conservation potential from improving this technology can therefore not be added to the potentials of the individual sectors since the motors and drives are often already part of the sectoral conservation potential. It will be compared to the total demand side electricity conservation potential calculated within this project. In sectors where the options can be defined in a

307 Interviews (JV) 2000: 18 308 80 MW of surplus power generation capacity has been established, and projects aggregating to 98 MW are under

construction. A capacity of about 150 MW is under finalisation in the major sugar-producing States, Andhra Pradesh, Gujarat, Punjab, Bihar and Haryana. New initiatives have also been taken in Biomass Combustion and Ta-luka based Biomass Power Plants. A private sector biomass power project of 12 MW capacity has been commis-sioned in Tamil Nadu and two projects are at an advanced stage of construction. A total biomass combustion capac-ity of 26 MW is now operational. Wood based biomass gasifiers of capacity up to 500 KW have been developed for operation in stand-alone or grid connected mode for thermal, mechanical or rural electrification applications. An aggregate gasifier capacity of 24 MW has so far been installed.

309 Meeting India 2000: 8

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (217)

186

detailed way, the sectoral potential of improved motors has be added, such as improved fans in the clinker burning process (cement sector) (UNIDO 1998).

Motors are used in a wide rage of applications310. Most motors are three-phase induction motors 311; they are popular312 in India and China because they are cheap and easy to maintain (Hinge et al 1997). In the EU the life of this size of motor would be 12 years (EC 1996). The Chinese motor production has decreased by 6% per year in the 1990s (IECC 1999) but the produced motors’ total capacity increased from 42 GW in 1985 to 60313 GW in 1995. In India the number of motors produced increased 8% from 1985 up to 1 million pieces in 1995 (Industrial Commodity Statistics 1996). Figures on the number and capacity of imported motors have not been found.

A typical fact of motors (at least in the case of motors in the EU countries) is that the value of the electricity consumed annually is approximately 5 times higher than its purchase price. This makes motors very suitable for electricity consumption reduction, especially when realising that this holds for the total life of 12-20 years (Dessoude & Asmane 1994).

6.8.1.2 Sectoral Energy Consumption

This sector study will focus on industrial motor electricity consumption, since motors in for irrigation pumps and small motors in appliances are dealt with in Sections 6.5 and 6.6. Motors in India consume 74% of all industrial electricity use or 72 TWh. This share is similar in China, where 600 TWh is annually consumed (end of 1990s), which is roughly 2/3314 of all electricity.315 The related annual CO2 emission in China is 172 MTon in 1997 and the average motor efficiency was 89.3% (IIEC 1999).

The different models can be divided into three categories316: a) J series, which are obsolete317; b) Y series account for 90% of the production in the 1990s, are less noisy and use less material, but the energy efficiency is similar to the J series318; c) YX series is the internationally the newest model and most energy efficient319, but less material efficient and more expensive and therefore not popular with consumers. The production in China is minimal in the 1990s (IIEC 1999).

6.8.2 Technology options for Energy Conservation

The efficiencies of Chinese motors are several percent points lower than European best efficiency standard motors (see Table 6.19).

310 e.g. to power fans, compressors, pumps, mills, winders, elevators, transports, home appliances, office equipment

(EU, 1996). In China, 40% of installed industrial motor capacity is used for pumps and 10% for blowers (IECC, 1999).

311 Which speed is mainly determined by the frequency of power supply and the number of poles in the motor. Syn-chronous motors are more expensive, but give a more perfect constant speed than small or medium sized induc-tion motors.

312 India: about 70% of all electricity use for motors in industry and 100% in agriculture and China: 90% of pro-duced motors (Hinge et al, 1997).

313 Seems to be incompatible with Hinge et al (1997): the production in 1996 was 40 GW. 314 In the US this share was 57% in the beginning of the 1990s. 315 Interviews (JV) 2000: 27 316 Interviews (JV) 2000: 27 317 In 1996, half of the Chinese stock of motors was the inefficient J series, because the shift to Y-series occurred

only in the years before (Hinge et al, 1997). They are not produced anymore since 1984 (IIEC, 1999). 318 The 5.5 kW model has an efficiency of 85% and the average is 89% in China of motors produced in the 1990s. 319 89% for the 5.5 kW model and 92% on average; low demand and production because the Chinese government

has set the prices high to support producers (IECC, 1999).

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (218)

An Asian Dilemma

187

Table 6.19 Average efficiency of motors per size category in China and India and the international standards in 1990.

Capacity (kW)

China* (1997) ef-ficiency320

Capacity (kW)

India# effi-ciency

Capacity (kW)

European best effi-ciency standard

motors ^ 1.1 78% 0.12 50-53% 0.75-7.5 86% 5.5 85% 110 94% 7.5-37 90-%

22 91.5% 315 96% 37-75 93% 75 92.7% >75 96% * (IIEC 1999) # (Nadel et al 1991) ^ (EC 1996)321

This paragraph describes several options of efficiency improvement in the motor sector322.

Variable Speed Drive: a Variable (or: Adjustable) Speed Drive (VSD) is a mechanism which regulates the power supplied by the AC motor to the application. This is useful for applications with a variable fluid flow (such as air, steam, water, etc)323,324. The savings that could be reached by implementing VSD per motor have been calculated by Elliot (1995) at 15-40% and by EC (1996) at 25%, both for developed countries. For China, it has been estimated that 40 TWh electricity savings could result from implementing VSD where necessary,325 which is 5% of 1995 national consumption and over 8% of motor consumption. This potential is probably lower than in developing countries because of the applicability limitations326. In one example in China the VSDs installed had a pay-back time of 2 years327. It is not clear whether China and India can produce VSDs domestically328. An Indo-Dutch project (interviews India: 2000) concludes that a 20-70% saving is possible through the introduction of VSDs. The potential is very large since VSDs are currently not used to a high extent in India.

Energy Efficient Motor: High efficiency motors have 30-50% less losses due to the optimised design, more generous electrical and magnetic circuits and higher quality materials (EC 1996). Savings can be 6% in the 0.75-7.5 kW power range (EC 1996). The extra investment costs are 20-25% compared to standard motors, which equals 22 ECU/kW 320 In China, it refers to motors produced in 1997, most of them with sizes between 5 and 55 kW (IECC, 1999). 5

kW is a small but popular model in China (Interviews (JV) 2000 :27) 321 Chinese motors are 3-5% lower than international standards (Interviews (JV) 2000: 27) 322 ‘external’ factors important in the motor system efficiency, described in EC (1996): the quality of the power

supply, power factor, transmission and distribution losses, quality of transferring the power from the motor to the application, load management practice, correct sizing of the motor (average and peak requirements).

323 Traditionally the control of flow is constant due to a constant motor and is set at the level of the maximum flow needed in time. If at times the flow needs to be reduced, valves, dampers or vanes are used, resulting in a loss of energy. Variable speed drives allow the motor to reduce power and therefore regulate the flow of substance as per the demand at that moment.

324 VSDs are available for all types of motors. Since they are not based on moving parts, they do not need a lot of maintenance, and are highly reliable and efficient. A disadvantage is that VSDs introduce harmonics in the current leading to voltage distortion and that the life of the standard motor reduces due to the fast switching of power devices. There are various types of VSDs which each have different advantages and disadvantages (EC, 1996).

325 Interviews (JV) 2000: 27 326 Small motors have lower annual operating time and large motors do often work on a stable load. In the

commercial sector, loads are often more variable and the operating hours should be above 4000 hours to make the VSD cost effective. In the industrial sector there are more stable loads and the operating hours should be above 7000 hours. If the price of VSD’s is reduced in the future, the applicability for lower power ranges might become profitable (EC, 1996; Elliot et al, 1995).

327 The example of the Lido Energy Centre in Beijing: the steam demand varies with the season and therefore the combustion air flow and the water input into the boiler should be variable. Manually adjusted dampers were previously used to control these flows (SETC/ECIDC, 1999; Interviews (JV) 2000: 22).

328 Most VSDs are imported from Japan (Hinge et al, 1997).

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (219)

188

for the European situation. For a new application and motors with a large number of operating hours, this results in a pay back period shorter than 2 years (European situation). Average operation hours and a low or high power range result in pay-back period between 3 and 7 years. The PBPs are shorter in commercial applications. The economic potential is estimated at 3% (EC 1996). It should be realised that the savings and pay-back period are different for application in China and India. For example, NPC (2000) says that EE motors cost around 50% more (Indian situation).

China is currently not producing this type of motor. The motor manufacturing industry consists of thousands of small enterprises who lack technical skill to produce high efficiency motors, and of a few dozen large enterprises who often are in internal financial difficulties.329 India is producing high efficiency polyphase induction motors (1990). In developing countries small motors may be produced manually, resulting in a low energy efficiency (Nadel et al 1991).

Motor Maintenance: Losses occurs due to poor maintenance (inspection, lubrication, ventilation, wear and tear in bearings and housings, load conditions, etc) and rewinding practices (retrofitting of burnt out motors)330 (EC 1996). Improved maintenance of the motor can increase the efficiency with 1-2%,331 resulting in 9-10 TWh savings in China and 4 TWh in India (based on 1995 situation). It should be realised that improved maintenance results in a longer life and therefore later replacement with newer models, which reduces the potential in the longer term.

6.8.3 Scenarios and Saving Potential up to 2020

The motor capacity is generally not predicted on the long term. The following assumptions are made:

­ 60% of national electricity consumption, is expected to be consumed by motors and drives.332 In the European Union countries, typically 60-80% of the industrial and 35% of the commercial electricity use is consumed by motors (EC 1996). The Chinese and Indian situation assumed to develop towards the EU situation.

­ 15% current savings potential333 is assumed (combination of VSD, new Energy Effi-cient motors334 and replacement of J and Y series, and improved operation and mainte-nance), and a higher potential might exist in 2020 because new motor capacity will be installed and the best practice motors will keep on improving their efficiency. A savings potential of 25% is assumed here.

329 Interviews (JV) 2000: 27 330 NPC was established in 1958 by government of India to train and research in the area of productivity, and to

increase the consciousness on productivity in industry, agriculture, service, infrastructure and other sectors of the economy. They can undertake industrial engineering, organisational restructuring, Business re-engineering,, human resource management, total quality management, pollution prevention and control, energy management and audits, etc. NOPC has 43 productivity councils spread throughout the country (NPC no date) .

331 Interviews (JV) 2000: 27 332 Interviews (JV) 2000: 27 333 For the EU this percentage was estimated at 16-21% (technical potential) and 8-9% (economic potential) (EC,

1996). Hinge et al (1997) assumed 10% savings potential for that moment in China, which could be higher in fu-ture and doesn’t include VSDs. According to IIEC (1999) the savings in ten years time could be around 20% of installed capacity compared to a BAU scenario, by using efficient motors for new installations as well as re-placement of inefficient (J-series) ones.

334 imported, since the production technology level is currently not sufficient to produce high efficiency motors or parts (Hinge et al, 1997)

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (220)

An Asian Dilemma

189

­ In 2020, 60% of total electricity consumption equals 5168 PJ in China and 2701 PJ in India, resulting in 1292 PJ and 675 PJ savings respectively, which equal 15%335 of na-tional BAU electricity consumption.

6.8.4 Overview

The motor study has mainly focussed on information from China. It is difficult to find future estimations on issues in this sector. The number of motors used in 2020 and the electricity use per motor is hard to estimate. For that reason, an assumption on the share of national electricity is used, since motors are used in all kinds of processes in every sector. This share is currently high in China and India, around 70%. It is assumed to reduce to 60% of national consumption in 2020. Identified efficiency options that are directly connected to the motor are: installing high efficiency motors (optimal design, better circuits and higher quality material); variable speed drive; and improved motor maintenance. Altogether these options are assumed to have a 15% savings impact, which gives a 9% savings potential on national BAU electricity consumption. Since this is a cross-cutting sector, these savings cannot be added to the other sectors, since most sectoral efficiency measures include motor efficiency. It can therefore merely be used as a comparison to the total electricity savings potential: the savings potential due to improved motors are 9% of BAU electricity consumption in 2020, whereas the total savings of end-use efficiency measures can be up to 30% (see next section’s integrated analysis).

6.9 Integrated sector analysis of end-use BPT savings potential

The preceding sections contained the sector analyses. Each analysis started with detailed product and process information, continued with technological reduction options and the 1995 Global Best Practice situation and ended with the assumed development of the sector under the two scenarios. This section shows the assumptions, fuel and electricity consumption in both scenarios and the potential energy savings in a quantitative, integrated manner over all end-use sectors.

The first and a very important parameter is the future development of production output (see Table 6.20). For the three heavy industrial sectors, the growth of physical output was used (MTon of cement produced per year, for example) whereas for the other sectors the definition of ‘output’ is presented as an index number. The determination of the output is complicated by the fact that the mix of products changes over time. The ‘output’ therefore refers to the energy effect the development that produced/consumed products and services have, assuming no efficiency improvement compared to the year 2000, but merely the effect of a change in amount and mix of products (the so-called frozen-efficiency development). An additional sector called ‘other industries’ was created (total industries (from the RAINS 2000 BAU scenario) minus the three studied industrial sectors) in order to create a complete end-use overview. Detailed studies have not been carried out on that sector, but some rough conclusions will be drawn.

335 The estimation of (Interviews (JV) 2000: 27) was almost 60 PJ (15-16 TWh) annually for the year 1995, which

equals less than 3%.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (221)

190

Table 6.20 Production growth of the individual sectors (output 2000 is set to 100).

China INDIA Production/ Output Annual Growth

Output Production/ Output Annual Growth

Output Sector Year 2000 2010 2020 2000-

10 2010-

20 2000 2010 2020 2000-10 2010-20

Iron and Steel all 100 116 128 1.5% 1.0% 100 148 219 4.0% 4.0% Cement all 100 128 149 2.5% 1.5% 100 197 352 7.0% 6.0% Aluminium all 100 126 158 2.3% 2.3% 100 206 387 7.5% 6.5% Other Indus-tries

fuel 100 137 162 3.2% 1.7% 100 195 378 6.9% 6.8%

Other Indus-tries

elec 100 200 359 7.2% 6.0% 100 182 338 6.2% 6.4%

Domestic Sectors

fuel 100 123 145 2.1% 1.7% 100 102 105 0.2% 0.3%

elec 100 155 260 4.5% 5.3% 100 181 332 6.1% 6.3% Agriculture elec 100 125 141 2.3% 1.2% 100 134 207 3.0% 4.4% Residential elec 100 143 219 3.6% 4.4% 100 204 340 7.4% 5.3% Commerical elec 100 249 599 9.6% 9.2% 100 213 500 7.8% 8.9% Transport fuel 100 170 275 5.4% 4.9% 100 203 299 7.3% 4.0% Transport elec 100 170 236 5.4% 3.3% 100 155 232 4.5% 4.1%

After the output development was been defined, the historic energy consumption per unit of product (SEC) was studied and compared to the Global Best Practice, and assumptions were made on the future development of the SEC in the Business-as-usual scenario. The total energy consumption per sector resulted from that. For each group of old and new plants and both for electricity and energy consumption, it has been estimated how soon the average SEC will reach the Global Best Practice. This annual improvement rate was larger in the Best Practice scenario. Table 6.21 and 6.22 show the assumptions and results for both scenarios.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (222)

An Asian Dilemma

191

Table 6.21 The Total (PJ-final/yr) and Specific Energy Consumption development in the end-use Business-as-usual scenario.

CHINA INDIA change in

SEC/yr Energy Consumption change in

SEC/yr Energy Consumption

Sector Year 2000-10

2010-20

2000 2010 2020 2000-10

2010-20

2000 2010 2020

Iron and Steel fuel -0.8% -0.8% 3306 3558 3645 -1.4% -1.4% 765 1009 1297 elec 0.0% 0.0% 341 395 437 -0.5% -0.5% 61 88 124 Cement fuel -1.2% -1.2% 2189 2459 2530 -1.2% -1.2% 336 614 975 elec 0.5% 0.5% 203 270 330 0.0% 0.0% 36 76 136 Aluminium fuel -0.5% -0.5% 62 74 88 -1.5% -1.5% 18 30 46 elec -0.5% -0.5% 151 180 215 -0.5% -0.5% 37 66 112 Other Indus-tries

fuel -1.0% -1.0% 14007 17317 18608 -1.0% -1.0% 2370 4374 7658

elec -1.0% -1.0% 1815 3288 5325 -1.0% -1.0% 566 1011 1697 Domestic Sectors

fuel -1.0% -1.0% 13630 15390 17600 -0.5% -0.5% 7588 7370 7214

Agriculture elec -0.5% -0.5% 238 283 304 -0.8% -0.8% 318 395 563 Residential elec -1.0% -1.0% 585 756 1048 -1.0% -1.0% 329 606 916 Commercial elec -1.0% -1.0% 155 349 760 -1.0% -1.0% 219 421 894 Transport fuel -1.0% -1.0% 4205 6450 9447 -1.0% -1.0% 2383 4373 5832 Transport elec -1.0% -1.0% 102 157 197 -1.0% -1.0% 31 43 58 Total fuel 37399 45249 51918 13461 17769 23021 elec 3590 5679 8615 1596 2706 4501

Table 6.22 The Total (PJ-final/yr) and Specific Energy Consumption development in the End-use Best Practice Technology scenario.

change in SEC/yr

Energy Consumption change in SEC/yr

Energy Consumption

Sector Year 2000-10

2010-20

2000 2010 2020 2000-10

2010-20 2000 2010 2020

Iron and Steel fuel -2.4% -1.9% 3306 3006 2745 -4.8% -3.1% 765 682 734 elec -2.2% -1.8% 341 316 292 -1.4% -1.0% 61 80 107 Cement fuel -3.1% -2.2% 2189 1992 1850 -3.3% -1.6% 336 493 755 elec -0.2% -0.3% 203 252 283 -2.9% -1.3% 36 60 94 Aluminium fuel -1.8% -1.3% 62 64 71 -3.7% -1.8% 18 24 36 elec -1.6% -1.2% 151 159 176 -1.9% -1.1% 37 56 91 Other Industries fuel -3.0% -3.0% 14007 14120 12372 -3.0% -3.0% 2370 3566 5091 elec -2.5% -2.5% 1815 2822 3923 -2.5% -2.5% 566 868 1251 Domestic Sec-tors

Fuel -1.7% -1.7% 13630 13884 13770 -1.7% -1.7% 7588 6497 5604

Agriculture Elec -1.8% -1.8% 238 249 236 -2.5% -2.5% 318 318 394 Residential elec -3.5% -3.5% 585 585 628 -3.5% -3.5% 329 469 549 Commercial elec -3.5% -3.5% 155 270 456 -3.5% -3.5% 219 326 536 Transport fuel -2.5% -2.5% 4205 5537 6961 -2.5% -2.5% 2383 3754 4297 Transport elec -2.5% -2.5% 102 134 145 -2.5% -2.5% 31 37 43 Total fuel 37399 38604 37768 13461 15016 16518 elec 3590 4789 6139 1596 2214 3065

The sectoral energy consumption in the energy efficient scenario was compared to the BAU baseline scenario in order to calculate the reduction in energy use achieved by the measures

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (223)

192

taken in the End-use Best Practice Technology scenario (see Table 6.23). It was calculated that 29% of Chinese BAU electricity consumption could be saved in the BPT scenario, 32% of the Indian BAU electricity consumption. These results are valid under the set of assumptions made in this chapter, regarding the end-use BAU as well as the BPT scenario.

Table 6.23 Final Energy savings (PJ-f/yr) of the end-use Best Practice Technology scenario compared to the end-use BAU scenario.

China India Savings (PJ) % of BAU

consumption Savings (PJ) % of BAU

consumption Sector 2020 2020 2020 2020 Iron and Steel fuel 900 24.7% 562 43.4% elec 145 33.2% 17 14.0% Cement fuel 680 26.9% 220 22.6% elec 47 14.2% 42 30.6% Aluminium fuel 18 19.9% 10 21.8% elec 39 18.1% 21 19.0% Other Industries fuel 6236 33.5% 2566 33.5% elec 1401 26.3% 447 26.3% Domestic Sectors fuel 3830 21.8% 1610 22.3% Agriculture elec 68 22.3% 169 29.9% Residential elec 420 40.0% 367 40.0% Commercial elec 304 40.0% 358 40.0% Transport fuel 2486 26.3% 1534 26.3% Transport elec 52 26.3% 15 26.3% Total fuel 12581 25.3% 6503 28.2% Total elec-final 2475 28.7% 1436 31.9% Total primary energy 19654 26.2% 10605 29.6%

Figure 6.28 and 6.29 show the share of the sectoral savings potential in the total end-use savings potential. The commercial and residential sectors account for the largest share of total savings in both countries, with the agricultural sector in India taking third position. Their savings potential is large due to the high expected growth in both countries (shift towards the tertiary sectors and current low penetration of appliances, especially in the rural areas) and the fact that the appliances have a lifetime shorter than the industrial sector, resulting in a higher potential via efficient new products and replacement.

The savings potential of the three selected industrial sectors (cement, steel and aluminium)

is high when related to their sectoral BAU consumptions (see Table 6.23). However, within the total end-use BPT savings, their contribution is limited (see Figure 6.28 and 6.29). The output capacity of basic manufacturing industries such as cement, steel and aluminium was already large in 1995 and therefore the projected growth for the period 1995-2020 is relatively small compared to the other sectors336. As a consequence the manufacturing industry’s share of BAU electricity consumption is smaller in 2020 than in 1995. For this reason, a lower savings potential occurs compared to the total end-use BPT savings in 2020. For India it must be remarked that the share of the three industrial sectors was already relatively small in 1995 (11% of national electricity consumption and 24% of industrial

336 Chinese experts have provided the estimations on future output growth.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (224)

An Asian Dilemma

193

consumption, see Table 6.0) because a lot of similarly sized sectors exist337. Therefore their savings potential out of total BAU consumption is exceptionally low in 2020.

The savings of ‘other industries’ in total end-use savings (Figure 6.28 and 6.29) are large, due to a high SEC reduction assumed for the BPT scenario. The first reason for this assumption is that the output growth of these sectors is larger than for the studied three industrial sectors (cement, steel, aluminium) because a shift is expected from those basic manufacturing sectors to the other industrial sectors. Additional output means a higher share of new capacity and a higher financial return, and therefore a larger possibility for technology improvement and investment. The second reason for a high SEC reduction assumed in these sectors in China and India is that it can be expected to be higher than average global industrial SEC reduction in the BAU scenario, due to relatively low current efficiency level. The global industrial SEC has been estimated to decrease by 0.5% a year (Worrell et al 1997) and a 1% reduction has been assumed in this study. A similar situation is valid for the Best Practice Technology scenario. Global industrial annual savings range from 1.5 to 2.5% per year globally (Worrell et al 1997) and therefore SEC reductions of 3% (fuel) and 2.5% (electricity) have been assumed for the Chinese and Indian situation. The third reason for the high expected SEC reduction is that these sectors consume relatively more electricity than the three basic manufacturing industries, which results in a higher sectoral electricity savings potential and therefore a higher share out of the total BPT electricity savings potential compared to the three manufacturing sectors. It can be concluded that the savings options and potential of the other industrial sectors need to be studied in more detail.

Cement3%

other Industries31%

Agriculture12%

resid26%

comm25%

Transport1%

I&S1%

Alumin1%

I&SCementAluminother IndustriesAgricultureresidcommTransport

Other Ind56%

agriculture3%

residential17%

commercial12%

transport2%

I&S6%

Cement2%

Alumin2%

I&SCementAluminOther Indagricultureresidentialcommercialtransport

Figure 6.28 The share of sectoral electricity savings in the total Indian electricity Best Practice savings

Figure 6.29 The share of sectoral electricity savings in the total Chinese electricity Best Practice savings

The World Energy Assessment (2000) gives economic energy efficiency potential estimations for the year 2010 compared to a frozen efficiency situation. For India the figures are 15-20% for the three industrial sectors, 10-70% for lighting, 25% for refrigeration, 10% for air conditioners, 3.5 GW industrial cogeneration (only in the sugar sector; this is 75% more than 2000 level338) and 25-55% via EE pump sets. For China, the

337 Out of the large number of industrial, electricity consuming sectors, these were the largest three consumers in

1995 and their individual sectoral savings potential is considerable. The chemical sector also has a large electric-ity consumption, but due to its heterogeneity it has not been selected for further study.

338 Assuming 5000 hours/yr. This IEA assumption matches the Asian Dilemma assumption of 100 PJ (5.6 GW-e) in 2020 in the Business-as-usual scenario, but is much lower than the 374 PJ-e (20.7 GW-e) projected in the Asian Dilemma Best Practice Scenario in 2020.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (225)

194

economic potentials are similar to those in India. The figures are difficult to compare with the potentials calculated in this project since the WEA study includes fuel savings, compares to a frozen efficiency situation instead of the BAU, and focuses on 2010. However, if the economic potential for 2010 is already high, it can be imagined that the sectoral savings presented in Table 6.23 are generally higher.

6.10 Bottlenecks (general barriers)

The barriers to energy efficiency improvement can be divided into groups: a) no (high quality) domestic production of energy efficient technologies; b) insufficient or incorrect knowledge about energy efficient measures and good housekeeping options; c) use of old inefficient equipment and appliances; d) insufficient infrastructure and vastness of the countries leading to small-scale production; e) importance of sustaining the economy at the local level; f) low price and partially theft of electricity; g) scarcity of investment capital; h) large number of users in commercial, residential and agricultural sectors; i) output growth might result in sustained use of old equipment; j) auto-generation of power (= captive power). These issues are briefly explained below, and dealt with on a sector-by-sector bases in Chapter 8.

a) The energy efficient technologies which have been mentioned in the sector studies, cannot all be produced domestically or not with sufficient quality. For example, green lights can be produced but a large share of production has insufficient life, reducing the interest of potential consumers, and reducing market potential for high quality alternatives. Small to medium capacity pre-calciner plants for the cement industry can be produced in China, but larger and more efficient plants need to be (partially) imported. There are a few manufacturers of roller mills in China, but their output and quality is low. Import restrictions, lack of foreign currency and approval procedures are barriers. The government should give priority to domestically producing energy efficient technologies in the long term and importing machinery and knowledge in the short term. Energy efficient technology import could be given a simplified approval procedure compared to other imports. In India more than in China, domestic production takes place of efficient technologies, by Indian as well as joint-venture companies. Domestically produced high quality products could be given a subsidy and a standardising/labelling system to increase demand.

b) Knowledge about energy efficient options is not always correct or sufficient. For example, in India as well as China, the general opinion of the cement sector is that blended cement has a lower quality than Portland cement. In China several cement experts were not aware of the option of blended cement. To some extent the government is responsible for awareness creation. Cogeneration in India is mainly supported in the form of bagasse in the sugar industry, whereas other fuels or sectors suitable for additional cogeneration are not given due attention.

c) In all industrial sectors it can be seen that the life of plants and production processes is extended and retrofit is carried out, instead of replacing an old plant by a state-of-the art one. Retrofit requires lower investment capital and prevents the owner from having to go through approval procedures and availability of natural resources which is connected to constructing a new plant. Retrofit generally increases efficiency, but at a lower rate than new plants would. Sometimes old plants are practically completely replaced by new plants due to thorough refurbishment. This makes it difficult to estimate the BAU efficiency improvement.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (226)

An Asian Dilemma

195

d) The vastness of the countries and the insufficient infrastructure makes local production necessary and therefore reduces the average plants size. This decreases the quality of the output (e.g. cement from old vertical kilns), reduces efficiency as well as the number of technology options that are cost-effective (long pay-back time on investment because of the low output of the plant), such as computer controlled processes, roller mills in the cement industry etc. Furthermore, small plants are often under responsibility of the local government and not the central government, which reduces government influence regarding energy efficiency. The insufficient infrastructure reduces the potential of blended cements, of increasing the average size of plants, of increasing the number of integrated plants (e.g. steel), etc.

e) Related to d) is the barrier that, for tax collection and employment reasons, the local governments are not inclined to close down small and inefficient production plants. The rules and regulations of the central government are therefore often not implemented, and it is very difficult to monitor and control this. For example, OHF Steel plants should be closed at a higher speed in India, and the closing down of small vertical kiln cement plants in China should be given even higher importance than it already has. The current policies (new OHF and small vertical kilns cannot be built, small aluminium plants and J-series electric motors need to be taken out of production) can not be monitored.

f) The subsidised electricity price in India and low price in China due to over supply, reduce the incentive for savings, especially in the agricultural and domestic sectors. Investments in efficient irrigation pumps, appliances and lighting have a long pay back period because of the low electricity price. However, investment by parties other than the end-user could also be an attractive option: several sources mention that the additional investment in energy efficient appliances and lighting is more than compensated for by the reduction in new peak electricity generating capacity needed to be built. This shows that Demand Side Management (energy efficient products promoted by utilities) might be worth more attention339.

g) Energy efficient products or technologies have a higher investment price, and investment capital is insufficiently available, especially for energy efficiency investments. It is easier to get financing for capacity or product quality increase, than for energy efficiency investments, also because the knowledge of energy efficient investment is not available with capital providers.340 Besides that, plant owners or customers are unwilling to replace installations that are still operating, since it is seen as capital destruction.

h) The number of users of lighting products, appliances such as refrigerators and air conditioners, and agricultural pumps is very large. For new products, the information dissemination and availability of energy efficient products should be arranged with retailers and local sector associations. For agricultural pumps, retrofit is an important option, for which people need to be trained to visit millions of farmers. Furthermore, the current subsidy and metering system are barriers.

i) High growth is on the one hand beneficial for energy efficiency since new capacity will be built which often has a higher efficiency. However, old industrial plants are often not be taken out of production in a situation of high growth, since all production capacity is needed. Previously closed old plants are often opened again, or simple (inefficient) production capacity is constructed in a short period of time (e.g. as happened in the

339 Chinese utilities have provided lamps at a discount price to households in certain provinces, but this strategy was

stopped since there is sufficient power supply (Interviews (JV) 2000: 9). 340 Interviews (JV) 2000: 2, 4

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (227)

196

Chinese cement sector in the beginning of the 1990s, and was mentioned by Indian experts as a future possibility.341

j) Due to the unreliable electricity supply, large plants generally auto-generate electricity (captive power plants) (CMA 1998). In this case the costs of electricity represent to a large extent sunk costs (except for the fuel costs) and therefore the incentive for electricity conservation decreases. Auto-generation takes place in all three industrial sectors studied342 and several other industrial sectors. The low electricity prices represent a major obstacle, also here, because there is (hence) hardly any incentive to sell surplus electricity via a free market once that is created (see liberalisation Transmission and Distribution, Chapter 8).

6.11 Conclusions

Efficiency achieved before 2000. China and India have achieved considerable end-use ef-ficiency improvement already in the period before 1990 and between 1990 and 2000. Sev-eral policies have been developed and carried out, such as the cogeneration promotion for the Indian sugar sector, the closure and retrofit of small plants in China, closure of wet ce-ment plants and OHF steel plants in both countries, information dissemination via sector as-sociations and government communication regarding opportunities in the industrial as well as residential, commercial and agricultural sectors. The industrial sector studies on cement, steel and aluminium show how the energy efficiency has improved over the last decade and an increase in attention for and production of energy efficient lighting, appliances and mo-tors (including water pumps) can be observed. For the future, it is expected that this trend continues, towards more efficient use of energy in general, and electricity in particular. The market forces have an impact: there is an increasing demand for high-quality output in both countries, which drives small and probably less efficient producers out of the market.

Uncertainties in development and data. The trend mentioned above is presented by the end-use Business-as-Usual scenario in this project. However, additional savings are possi-ble, which are in this project included in the end-use Best Practice Technology scenario. Since both countries are changing rapidly, it is difficult to develop the scenarios. Trends of the last decade cannot simply be extended. An often heard opinion of experts in China was that the economic slowdown of 1999 and 2000 complicates long term predictions (possibly valid for India as well) and that currently the willingness to invest in end-use energy effi-ciency is low due to economic difficulties and the sufficient supply of power and fuel in China. Experts have a very different opinion on growth and efficiency options now com-pared to a couple of years ago when China’s annual growth in all sectors was over 10% and electricity was scarce. An additional factor of uncertainty is the development of the Western areas in China. Will this increase total economic activity in the country, or does it simply represent a redistribution effect for the benefit of the West while total investment will stay constant? Experts in India are recently of the opinion that small, inefficient plants will be closed in the coming years due to market forces, which will increase the average Indian ef-

341 Interviews India 2001 342 Sail (iron and steel cooperation, India) met 56% of its power need through captive (auto production), mostly old,

thermal, power generation of 44 MW (Ministry of Steel 1999: 27). According to ADB (1996) all Indian Steel plants except one plant use captive power, because the grid power supply is inadequate and interrupted resulting in a low capacity utilisation . The cost of self-generated electricity is much lower, e.g. HINDALCO (aluminium, India) produces at Rs 0.9/kWh whereas grid electricity costs Rs 2/kWh (Meeting India 2000:19) or Rs 3-4/kWh (Interviews India 2001). In the year 1993/1994, around 20% of the Indian cement sector produced its own power, with a total capacity of 731 MW which was mainly coal based (CMA, 1994). In 1998/98 the capacity had grown to around 1200 MW, which was 70% diesel based, 25% coal/oil and 5% wind energy based (CMA, 1998).

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (228)

An Asian Dilemma

197

ficiency level, but a sudden peak in demand will open those same factories just as suddenly. Both countries’ governments have made various plans regarding end-use energy efficiency, but it is uncertain that they will all be implemented under the Business-as-Usual scenario. Data on the current situation and future estimations are often not available, such as penetra-tion rates of energy efficient technologies, the ability and capacity of producing technolo-gies domestically, the actual size and number of smaller production units within a so-called large scale plant. The rapid and unstable development and the lack of data result in major uncertainties.

Technical options. For each of the sectors, important technical options have been identified that offer energy savings in addition to the BAU case. Most of the options are currently available on the international market. Few are still under development or in the process of being commercialised. The latter are not included in the Best Practice Technological sce-nario, because the time period until availability is uncertain. The options that are currently available, can be divided into three groups (see Chapter 8 for detailed discussion): 1) op-tions that seem to be available, not too complex, affordable, appropriate, and (in line with) current policy, which are expected to be implemented in the end-use BAU scenario. Exam-ples: roller mills and presses in the large-scale cement plants; prebaked anodes in the large-scale aluminium plants; EE lights in new commercial buildings; J-series motors taken out of production; stable share of EAF secondary steel output and of blended cements (both lower than BPT potential); an increased share of cogeneration in the sugar industry (but smaller than the maximum potential); OHF and wet cement plants closed almost totally, etc. 2) options that are not expected to be adopted in a BAU situation because of barriers such as lack of awareness, availability (including import restrictions), appropriateness, too high complexity, etc. Examples are: large scale modern cement plants and roller mills (currently only small scale and lower quality domestic production in China); cogeneration up to the maximum potential (institutional barriers in China and India); energy efficient lighting in existing and new buildings, in residential, commercial and industrial sectors (difficult dissemination); near-net shape casting (high tech, also high cost?); efficient new irrigation pumps (policy and institutional barriers). 3) out of these, certain options are ex-pected not to be feasible under a BAU situation for economic reasons. Examples are: retro-fit of existing water pumps (large number of pumps means difficult implementation, and relatively expensive per unit energy saved); large scale modern cement plants and roller mills (only a limited number of plants exists now in China, India seems to have more mod-ern plants).

For many options it is not known to which group they belong, because information is lack-ing with regard to the current penetration rate and why they are not further adopted at this moment. For example, most large aluminium plants in India have converted to prebaked electrodes, but some have not and it has not become clear what the exact barriers is. It is not known how many cement plants use roller presses and high efficiency classifiers, and if not, what their implementation barrier is.

Scenarios and total Savings Potential. Despite the uncertainties mentioned above, a clear set of assumptions has been prepared for both scenarios. The end-use Best Practice Tech-nology (BPT) scenario calculations show a savings potential of around 30% on top of the BAU efficiency improvement for the year 2020 in both countries (for a definition of the BPT scenario, see Section 6.1). These savings refer to the total economy’s electricity use. They consist of the sum of individual sector savings potentials, which were largest in the commercial and residential sectors with the agricultural sector in India taking third position. The savings potential of the three industrial sectors (cement, steel and aluminium) is large if compared to the BAU consumption of the three sectors, but -under this set of assumptions- not relative to the total BAU electricity consumption (see explanation in Section 6.9). The

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (229)

198

‘other industries’ account for a large share in the BAU electricity consumption and the BPT savings potential because of their large growth, large electricity consumption and high esti-mated sectoral savings potential. These sectors were, however, not studied in detail, and therefore this conclusion about the energy savings potential has to be handled with care.

The general conclusion is that a large savings potential exists in especially the residential and commercial sectors, and the agricultural sector in India. The aggregate industrial sectors have a large savings potential, and the cement, iron and steel and aluminium industries are important focal sectors in the current situation, but probably have a decreasing share of total electricity consumption in the future (BAU). The industrial analysis is complex because of the large number of sectors consuming considerable amounts of electricity, and each of them using different production processes. Certainty in conclusions can only be obtained by studying the savings options and -potential in each and every one of those industrial sectors, paying due attention to the growth assumptions up to 2020, and therefore their expected im-portance in the BAU scenario in 2020 .

Fuel savings. This study focuses on electricity savings and emission reduction in the elec-tricity sector. However, during the scenario analysis, simple assumptions have been made on the BAU and BPT end-use savings on fuels (see the final table in each sector study and the overview tables in Section 6.9). An important finding is that some fuel conserving op-tions increase the consumption of electricity. Generally the total primary energy is reduced to a large extent, which results in substantial emission reduction. Examples of such options are modern pre-calciner, pre-heater kilns in the cement industry, which have more comput-erised control, quality control and emissions control, resulting in less pollution and better quality output, and a lower overall energy consumption, but a higher electricity consump-tion. Another example is the Electric Arc Furnace which produces secondary steel, having a low overall primary energy consumption compared to primary steel production, but a very high electricity requirement.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (230)

199

7. Potential Reduction of Emissions by Demand and Supply Side Options in 2020 In China and India

Authors: Carolien Kroeze, Christiaan Boudri and Jaklien Vlasblom343

7.1 Introduction

In earlier chapters, we showed that emissions of air pollutants from the electricity sector may increase considerably in China and India in the coming decades (chapter 5). We also showed that there is considerable potential for improving the end-use efficiency (chapter 6). So far, we have not yet discussed the effect of efficiency improvement on emissions of air pollutants. We have also not yet focused on technologies to reduce emissions from the electricity production sector. In this chapter we therefore analyse the potential effect of various options to reduce emissions of greenhouse gases and sulphur dioxide the year 2020, relative to the Business-as-Usual scenario described in chapter 5. The options include the total effect of end-use efficiency improvement (from chapter 6), fuel switches, and technical efficiency improvement of existing and new power plants.

This chapter presents results for the following demand and supply-side options: the impact of end-use efficiency improvement (EEI) on electricity supply, replacement of coal by renewables (REN), replacement of coal by natural gas (GAS), replacement of coal by nuclear power (NUC), closing small power plants (CSP), electrical efficiency improvement in power plants (EFF), increased application of cogeneration (COG), reduction of losses during transmission and distribution (T&D), technologies to reduce sulphur emissions (SR).

We aim at analysing the potential effect of each individual option while assuming that the option at stake is implemented at maximum, while all other parameters stay the same as in the BAU scenario. In chapter 8 we discuss the feasibility of the options largely based on stakeholder analysis and in chapter 9 we combine selected options in scenarios to investigate their combined effect on emissions.

7.2 China

7.2.1 The impact of end-use efficiency improvement (EEI) on electricity supply

As shown in Chapter 6, the potential for end-use efficiency improvement is considerable in China. In the BAU scenario, the total electricity use in China amounts to 8618 PJ in 2020 (end-use). Implementation of the best practice options described in chapter 6 is es-timated to reduce the total demand for electricity by 2475 PJ (or 29%). The BAU sce-nario assumes that difference between end-use of electricity and gross electricity produc-tion is 15% of the gross electricity production. Thus an end-use efficiency improvement of 2475 PJ would reduce gross electricity production by 2896 PJ. Here we assume that this will lead to a reduction in the building of new coal/oil fired power plants larger than 200 MW (see Table 7.1). As a result, greenhouse gas emissions are reduced by 43% rela-tive to the BAU scenario and sulphur emissions by 45% (Table 7.2).

343 With comments from Kornelis Blok and Joyeeta Gupta.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (231)

200

Table 7.1 Primary energy demand, gross electricity production, efficiency, total capacity and ca-pacity factors for power plants > 200 MW in China in 2020 in the Business-as-Usual scenario (BAU) and under the best practice assumptions for end-use efficiency im-provement (EEI).

Power plant lifetime class (building year)

Primary energy demand (PJ/y)1

Electricity produced (PJ/y)

Efficiency (fraction)

Capacity (GW) Cap. factor

(fraction) BAU EEI BAU EEI BAU EEI

<1990 672 672 228 228 0.34 14 14 0.53 1990-2000 2342 2342 890 890 0.38 40 40 0.70 2000-2010 3064 3064 1225 1225 0.40 56 56 0.70 2010-2020 8166 927 3267 371 0.40 173 20 0.60 Total 14243 7004 5610 2714 282 129 1 The demand for primary energy reflects primary energy equivalents. For fossil fuels and biomass these are

defined as the net calorific input of fossil fuels or biomass (equal to the input in tons multiplied by the net calorific value), expressed in PJ. An equivalent amount of primary energy for processes without direct fuel consumption (wind, geothermal, hydro, nuclear, etc.,) are in accordance with the convention adopted in United Nations Statistics. For electricity producing facilities (both grid connected and non-grid connected) this is: 1 PJ of primary energy equivalent = 0.38 PJ of gross electricity produced. For heat producing facilities, this is: 1 PJ of primary energy equivalent = 1 PJ of gross heat produced.

Table 7.2 Emissions of air pollutants from electricity production in China in 1990 and in 2020 in the Business-as-Usual scenario (BAU) and under the best practice assumptions for End-use Efficiency Improvement (EEI). Units: Tg CO2-equivalents per year for green-house gases (GHG) and Tg SO2-equivalents per year for sulphur emissions

1990 2020-BAU 2020-EEI CO2 471 1435 811 CH4 37 113 65 N2O 2 7 4 Total GHG 510 1554 880 SO2 5 14 8

7.2.2 Replacement of coal by renewables (REN)

In China, about 20% of the electricity generation is produced from renewables in the BAU scenario in 2020. Here, we investigate the potential impact of increased use of renewables on emissions of air pollutants. In our best practice option, we assume that future use of renewables will develop as projected in the “Policy” scenario described by TERI et al. (1999) and in Boudri et al. (2000a). This scenario reflects the potential use of renewables in China and India, as constrained by technical limits, supply limits and sustainability. This scenario does not take into account (all) institutional barriers, existing (short-term) policies and cost constraints (Table 7.3).

The electricity produced by these renewables is under the REN assumptions 1570 PJ higher than in the BAU 2020 case for China (Table 7.3). We assume that this electricity replaces coal/oil power plants larger than 200 MW and to be built after 2010. Thus for these power plants we assume that gross electricity production in 2020 is 1570 PJ lower than in the BAU scenario344. As a result, the total capacity and fuel input are also lower than in the BAU scenario (Table 7.4) and 37% of the electricity generation is produced from renewable energy.

344 We ignore differences between fuels in own electricity use by power plants

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (232)

201

Most of the renewables used have zero or low emissions of greenhouse gases and sul-phur dioxide. As a result, under the REN assumptions for renewables, the total emissions of greenhouse gases from the power sector in China are by 2020 23% lower than in the BAU scenario (Table 7.5). Sulphur emissions are calculated to be 22% lower.

Table 7.3 Primary energy demand and electricity production by renewables in China in 2020 in the Business-as-Usual scenario (BAU) and under the best practice assumptions for use of renewables (REN). Unit: PJ/year.

Demand for primary energy1 Gross electricity production BAU2 REN3 BAU2 REN3 Biomass Waste Fuel 75 937 17 211 Bagasse 150 176 4 5 Large Hydro 4743 5588 1802 2123 Other Renewables Geothermal4 13 1450 5 551 Wind 84 1331 32 506 Small hydro 788 881 300 335 Total 5855 10363 2160 3731 1 The demand for primary energy reflects primary energy equivalents. For fossil fuels and biomass these are

defined as the net calorific input of fossil fuels or biomass (equal to the input in tons multiplied by the net calorific value), expressed in PJ. An equivalent amount of primary energy for processes without direct fuel consumption (wind, geothermal, hydro, nuclear, etc.,) are in accordance with the convention adopted in United Nations Statistics. For electricity producing facilities (both grid connected and non-grid connected) this is: 1 PJ of primary energy equivalent = 0.38 PJ of gross electricity produced. For heat producing facilities, this is: 1 PJ of primary energy equivalent = 1 PJ of gross heat produced.

2 From TERI et al. (1999) and Boudri et al. (2000a). 3 This is the “Policy” scenario from TERI et al. (1999) and Boudri et al. (2000a). 4 The REN option assumes that all geothermal energy will be used for electricity generation, and none for heat

production

Table 7.4 Primary energy demand, electricity production, efficiency, total capacity and capacity factors for power plants > 200 MW in China in 2020 in the Business-as-Usual scenario (BAU) and under the best practice assumptions for renewables (REN).

Power plant lifetime class (building year)

Primary energy demand (PJ/y)1

Gross electricity produced (PJ/y)

Efficiency (fraction)

Capacity (GW) Cap. factor

(fraction) BAU REN BAU REN BAU REN <1990 672 672 228 228 0.34 14 14 0.53 1990-2000 2342 2342 890 890 0.38 40 40 0.70 2000-2010 3064 3064 1225 1225 0.40 56 56 0.70 2010-2020 8166 4240 3267 1696 0.40 173 90 0.60 Total 14243 10317 5610 4040 282 199 1 The demand for primary energy reflects primary energy equivalents. For fossil fuels these are defined as the

net calorific input of fossil fuels or biomass (equal to the input in tons multiplied by the net calorific value), expressed in PJ.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (233)

202

Table 7.5 Emissions of air pollutants from electricity production in China in 1990 and in 2020 in the Business-as-Usual scenario (BAU) and under the best practice assumptions for re-newables (REN). Units: Tg CO2-equivalents per year for greenhouse gases (GHG) and Tg SO2-equivalents peryear for sulphur emissions.

1990 2020-BAU 2020-REN CO2 471 1435 1096 CH4 37 113 87 N2O 2 7 6 Total GHG 510 1554 1190 SO2 5 14 11

7.2.3 Replacement of coal by natural gas (GAS)

In the BAU scenario the amount of gas consumed for electricity generation increases from 63 PJ (1.8 billion m3) in 1990 to 1006 PJ (28.7 billion m3) in 2020. In the BAU scenario, we assume that the conversion technology applied is Combined Cycle Gas Turbine (CCGT) with an electrical efficiency of 55%. The gross electricity generated in 2020 is therefore estimated at 553 PJ (154 TWh).

Here we investigate the impact on increased use of natural gas, replacing coal- and oil-fired power plants, on emissions of air pollutants. We analyse this for several assump-tions on gas use in 2020. Our assumptions are based on the results of the interviews pre-sented in other chapters, and on estimates from the literature.

From interviews we learned that the use of natural gas may amout to 3 – 4 EJ by the year 2020, from which 1 – 1.6 EJ electricity can be produced (Table 7.6).

Other estimates for future gas availability can be obtained from the literature. EIA, for instance sums natural gas, coal bed methane, imported pipeline gas and imported LNG to result in the following numbers: a total amount of 27 billion m3 yearly is available in 2000, 121 in 2010, and 193 in 2020; with accelerated policy the amount of gas available for power generation can be increased without conflicting the aim of reducing coal use in the residential and small industrial sectors. With accelerated policy, 30 billion m3 yearly is available in 2000, 180 in 2010, and 350 in 2020, of which for power generation, 5 billion m3 in 2000, 45 in 2010, and 90 in 2020 (Logan and Zhang 1998, derived from EIA, DoE). This would be sufficient to fuel 85 GW of combined cycle plants in 2020, generating 540 TWh (Logan and Zhang, 1998). Apparently, an efficiency of 56% and a capacity utilisation factor of 6,400 hours per year has been assumed in these studies.

China plans to build larg pipelines from west to east, to overcome the problem that most indigenous gas resources are mainly located in the West, while the highest consumption will take place in the eastern and southern coastal strips. Also planned are a number of north-south pipelines and storage capacity. If gas is used for power generation, considerable growth rates can be expected.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (234)

203

Table 7.6 Overview of projections for gas use in 2020 in China from interviews and literature and as assumed in the Best Practice Technology options, assuming that gas is used in co-generation (GAS-cogen) or in conventional power plants (GAS-no cogen).

Reference Gas input (billion m3/y)

Gas input (EJ/year)1

Gas based power

generation (Gwe)

Gross electrical efficiency

(%)

Heat efficiency

(%)

Gross electricity generation

(EJ)

Heat genera-

tion (EJ)

RAINS-Asia BAU2 28.7 1.0 55% 0.55 0 Interviews 80-100 3.1 – 3.9 38-76 26-39% 1-1.6 0 Logan and Zhang (1998)

90 3.5 85 56% 1.9

BPT Options GAS-cogen (low and high)

100 175

3.5 6.1

40% 45% 1.4 2.5

1.6 2.8

BPT Options GAS-no cogen (low and high)

100 175

3.5 6.1

55% 0% 1.9 3.4

0 0

1 assumed heating value of natural gas: 35 MJ/m3 2 TERI et al. (1999); Boudri et al. (2000a)

Table 7.6 shows the assumptions made in the BPT GAS options. A low (GAS-low) and a high (GAS-high) gas availability has been chosen, with 100 and 175 billion cubic meters annual availability for the power sector. In the higher availability scenario, it is assumed that an active government policy will result in a larger share of total available gas to be used in the power sector, where as in the low availability scenario, the largest share of gas is in the domestic and industrial sectors.

Furthermore, two cases are compared regarding gas use: conventional gas power generation (GAS, no cogen) and gas based cogeneration (GAS, cogen). For gas based cogeneration, different technologies exist, for different sizes and utilisation, and each have different electrical and heat efficiencies. Averages are: large scale combined cycle cogeneration 44% electrical and 34% heat (thermal) efficiency, small scale combined cycle 42% and 32% and small scale advanced gas turbines 35% and 48% respectively. Top hat technology involves the injection of water before the compressor and has a total efficiency of 62%. The large scale combined cycle is generally used for large industries such as the chemical and petroleum industries and for district heating with even higher electrical efficiency (48% electrical and 36% heat efficiency). The advanced gas turbines are used mainly for food and drugs industries since their focus is on heat production (higher temperature). In the BPT options assuming that gas is used in cogeneration, the average efficiency ratio is assumed at 40% electrical and 45% thermal efficiency for advanced, best practice technologies.

Summarising, we investigate four Best Practice Technology options (see also Annex 7.6):

­ GAS low, no cogen: In this option, we assume that by 2020, 3500 PJ of natural gas is used for electricity generation (as opposed to 1006 PJ in the BAU scenario). We as-sume that this gas is used in conventional power plants, reducing the need for new coal-fired power plants to be built after 2000.

­ GAS low, cogen: In this option, we assume that by 2020, 3500 PJ of natural gas is used for electricity generation (as opposed to 1006 PJ in the BAU scenario). We as-sume that this gas is used in cogeneration, reducing coal use in cogeneration as well as in conventional power plants.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (235)

204

­ GAS high, no cogen: In this option, we assume that by 2020, 6125 PJ of natural gas is used for electricity generation (as opposed to 1006 PJ in the BAU scenario). We assume that this gas is used in conventional power plants, reducing the need for new coal-fired power plants to be built after 2000.

­ GAS high, cogen: In this option, we assume that by 2020, 6125 PJ of natural gas is used for electricity generation (as opposed to 1006 PJ in the BAU scenario). We as-sume that this gas is used in cogeneration, reducing coal use in cogeneration as well as in conventional power plants.

We consider the “GAS low, no cogen” option as our base case. In this case the 2020 greenhouse gas emissions from electricity production are 11% lower than in the BAU scenario, and sulphur dioxide emissions 21%. For the other three cases we calculate re-ductions in greenhouse gas emissions of 7% (GAS low, cogen), 22% (GAS high, no co-gen), and 17% (GAS high, cogen) (Fig. 7.3; Table 7.7).

Table 7.7 Emissions of greenhouse gases from electricity production in China in 2020 in the Business-as-Usual scenario (BAU) and under the assumption on increased use of natu-ral gas (GAS) (see text). Units: Tg CO2-equivalents per year for greenhouse gases (GHG) and Tg SO2-equivalents per year for sulphur emissions.

2020-BAU GAS-low, no cogen

GAS-low, cogen

GAS-high, no cogen

GAS-high, cogen

Coal < 50 MW 0 0 0 0 0 Coal 50-125 MW 51 51 51 51 51 Coal 125-200 MW 41 41 41 41 41 Coal > 200 MW 1328 1008 1215 672 1015 Cogeneration (coal) 72 72 29 72 0 Cogeneration (gas) 0 0 103 0 171 Biomass 0 0 0 0 0 Large hydro 0 0 0 0 0 Other renewables 0 0 0 0 0 Nuclear 0 0 0 0 0 Natural Gas (PP) 63 218 0 381 20 Total 1554 1390 1439 1216 1298

7.2.4 Replacement of coal by nuclear power (NUC)

Nuclear energy was not yet included in energy supplies in 1990. While two nuclear plants have recently become operational, policy plans for building more have been scaled down conspired to the ambitions of the early 1980s for lack of investments (Foell et al., 1995)

In the BAU scenario, 46 PJ of electricity was produced by nuclear power plants in 1995, which is only 1% of the total national electricity capacity in that year. Nuclear energy is seen as a likely candidate for electricity production in the long-term in China as reflected in the BAU scenario. By the year 2010 the production is assumed to have increased nine-fold relative to the 1995 level. By 2020 the share of nuclear in total electricity production is assumed to be 8% (Table 7.8).

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (236)

205

Table 7.8 Nuclear energy development for China according to RAINS-Asia 2000 Business-as-Usual scenario (TERI et al., 1999; Boudri et al., 2000a)

Year 1990 1995 2000 2010 2020 Gross output (TWh) 0 13 16 117 235 Gross output (PJ/y) 0 46 56 423 847 Share of total power generation (%) 0% 1% 1% 8% 8% Input (PJ/y)* 0 122 147 1112 2228 * according to UN-conventions: 0.38 PJ of gross electricity output = 1 PJ of nuclear input.

In the Best Practice Technology option NUC it is assumed that the nuclear capacity will remain at the BAU level, but that the plant load factor will rise to 80%, meaning that the gross electricity output rises to 989 PJ in 2020. The primary energy equivalent is in that case 2602 PJ. We furthermore assume that this extra nuclear power will replace coal/oil-fired power plants of at least 200 MW and built after 2010 (Table 7.9). This reduces 2020 emissions of greenhouse gases and sulphur dioxide from the power sector in China by 2% relative to BAU (Table 7.10).

We refer to this option as NUC, or NUC-base. The NUC-base option may be considered conservative, because we do not consider an increase in the nuclear power capacity in China. On the other hand, there may be arguments against nuclear power because of concerns with respect to nuclear waste. In two alternative cases, we therefore explore the effects of alternative assumptions on nuclear power in China. In the first case we assume that electricity production in nuclear plants would amount to 0 PJ (NUC-low) in 2020, and in the second case that it would double to 1700 PJ (NUC-high). The calculated CO2-equivalent emissions are in the NUC-low case 13% higher than in the BAU scenario, while in the NUC-high case, they are 13% lower (Fig. 7.3).

Table 7.9 Primary energy demand, gross electricity production, efficiency, total capacity and ca-pacity factors for coal/oil-fired power plants > 200 MW in China in 2020 in the Busi-ness-as-Usual scenario (BAU) and under the assumption on increased nuclear power (NUC-base) (see text).

Power plant lifetime class (building year)

Primary energy demand (PJ/y)1

Electricity produced (PJ/y)

Efficiency (fraction)

Capacity (GW) Cap. factor

(fraction) BAU NUC BAU NUC BAU NUC <1990 672 672 228 228 0.34 14 14 0.53 1990-2000 2342 2342 890 890 0.38 40 40 0.70 2000-2010 3064 3064 1225 1225 0.40 56 56 0.70 2010-2020 8166 7811 3267 3124 0.40 173 165 0.60 Total 14243 13888 5610 5468 282 275 1 The demand for primary energy reflects primary energy equivalents. For processes without direct fuel

consumption (e.g. nuclear) these equivalents are in accordance with the convention adopted in United Nations Statistics. For electricity producing facilities (both grid connected and non-grid connected) this is: 1 PJ of primary energy equivalent = 0.38 PJ of gross electricity produced.

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (237)

206

Table 7.10 Emissions of air pollutants from electricity production in China in 1990 and in 2020 in the Business-as-Usual scenario (BAU) and under the assumption on increased nuclear power (NUC) (see text). Units: Tg CO2-equivalents per year for greenhouse gases (GHG) and Tg SO2-equivalents per year for sulphur emissions.

1990 2020-BAU 2020-NUC CO2 471 1435 1404 CH4 37 113 111 N2O 2 7 7 Total GHG 510 1554 1521 SO2 5 14 14

7.2.5 Closing small power plants (CSP)

In China, smaller power plants have in general lower electrical efficiencies than larger power plants (Table 7.11; Annex 7-1). It is therefore interesting to investigate the option of replacing small power plants by more efficient larger plants. However, in the BAU scenario we already see a clear trend in China to replace relatively inefficient small plants by more efficient large plants, in line with current policies. By 2020 about 95% of the electricity from coal/oil-fired power plants is produced in plants with capacities over 200 MW, while in 1990 this percentage was less than 50%. The BAU scenario reflects the effects of current policy plans. The Chinese government aims at closing all power plants with capacities below 50 MW. In the future, the government also plans to close power plants up to 100 MW, unless these plants convert to cogeneration of heat and power (Vlasblom, 2000: 17, 20). Realisation of these policy plans may be slowed down because of concerns about the loss of employment and tax income (Workshop China 2000) (Vlasblom 2000). Furthermore, if the demand for electricity suddenly increases, the closed plants may be opened again. The BAU scenario nevertheless assumes that small power plants will be closed as currently planned by the government.

In the CSP option, we investigate the impact of closing the remaining power plants with capacities of less than 200 MW and replace them by larger, more efficient, power plants (> 200 MW). As a result of the CSP assumptions, the electricity produced by >200 MW power plants in 2020 (5921 PJ) is 6% percentage higher than in the BAU scenario (Table 7.11). The emissions of air pollutants from electricity production are calculated to be 1% lower than in the BAU scenario (Table 7.12).

Table 7.11 Primary energy demand, gross electricity production, efficiency, total capacity and capacity factors for coal/oil-fired power plants in China in 2020 in the Business-as-Usual scenario (BAU) and under the assumption on closing small power plants (CSP) (see text).

Power plant capacity class

Primary energy demand (PJ/y)1

Electricity produced (PJ/y)

Efficiency (fraction)2

Capacity (GW) Cap. factor (fraction) 2

BAU CSP BAU CSP BAU CSP Coal/Oil < 50 MW 0 0 0 0 0.27-0.30 0 0 0.45-0.50 Coal/Oil 50-125 MW 543 0 164 0 0.30-0.34 8 0 0.50-0.70 Coal/Oil 125-200 MW

442 0 147 0 0.32-0.36 8 0 0.50-0.70

Coal/Oil > 200 MW 14243 15085 5610 5921 0.34-0.4 282 297 0.53-0.70 Total 15229 15085 5921 5921 - 298 297 -

1 The demand for primary energy reflects primary energy equivalents. For fossil fuels these are defined as the net calorific input of fossil fuels or biomass (equal to the input in tons multiplied by the net calorific value), expressed in PJ.

2 Differs by building year of power plant (see Annex 7-1).

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (238)

207

Table 7.12 Emissions of air pollutants from electricity production in China in 1990 and in 2020 in the Business-as-Usual scenario (BAU) and under the assumption on closing small power plants (CSP) (see text).. Units: Tg CO2-equivalents per year for greenhouse gases (GHG) and Tg SO2-equivalents per year for sulphur emissions.

1990 2020-BAU 2020-CSP CO2 471 1435 1422 CH4 37 113 112 N2O 2 7 7 Total GHG 510 1554 1541 SO2 5 14 14

7.2.6 Efficiency improvement in power plants (EFF)

In the BAU scenario, the electrical efficiencies345 of existing (built before 2000) and new (built after 2000) power plants depend on the building year and on the capacity of the plant (Annex 7-1). There are several options to increase the efficiencies of existing plants (retrofit) and new plants (by using advanced combustion techniques).

In the EFF option we assume a) the efficiencies of existing power plants can be improved by 2% points on top of their assumed BAU efficiencies in 2020, and b) the efficiency of new plants equals 45%.

Assumption a) We assume that the efficiencies of existing power plants can be improved by 2% points on top of their assumed BAU efficiencies in 2020. This efficiency increase can be reached through various measures, including improved operation and maintenance, reduction of exhaust gas temperature (should be 130 degrees but is often higher) (Vlasblom 2000: 20), installation of a cooling tower (most new plants have one), upgrading of electrostatic precipitators, on-site demand management (UNDDSMS 1996). Some plants reheat only once, but it is difficult to install additional re-heating, especially in the case of a low-pressure unit. It is possible to convert to cogeneration if there is sufficient heat demand nearby. Except for cogeneration and the few backpressure plants, almost all plants have a condenser. In sensitive regions plants have retrofit obligations or coal input quality regulations (Vlasblom 2000: 20). The BAU scenario assumes closure of small power plants, and replacement of these by new and more efficient plants. As a result, the BAU scenario already reflects a considerable efficiency improvement with time. The EFF option estimates an additional potential for improvement for China (2%) that is lower than for India (5%), where closing of small power plants is not current policy (see 7.3.5).

Assumption b) For capacity to be newly built, the Best Practice Technology option EFF reflects the construction of a high-efficiency coal-fired plant (based on clean coal technologies). In a country like Denmark with high coal quality and low temperature cooling water, net efficiencies can reach 48% (CERI and TERI 1995; MPS 1997; IEA Coal Research 1999). For China it is assumed that 45% (gross) can be reached. This is lower than in Denmark, because the cooling water might be of higher temperature than in Denmark and the operation and maintenance and quality of used materials might give a lower efficiency. Technologies that have to be adopted to reach 45% gross efficiency based on coal as a fuel, include: supercritical boilers, Integrated Gasification Combined

345 Electrical efficiency is defined here as 100 * (gross electricity output / primary fuel input)

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (239)

208

Cycle (IGCC)346, different types of fluidised bed combustion (FBC), fuels cells, and Integrated Gasification Humid Air Turbine (IGHAT). The Best Practice Technology option EFF assumes that it is technically possible to implement these techniques by 2020. This is confirmed by recent expectations about IGCC and pressurised fluidised bed combustion (workshop China 2000), and the fact that an IGCC demonstration plant is planned with a capacity of 200-400 MW (OECD/IEA 1999). Power plants in China exist with efficiencies of 39-40% (320-600 MW) (Vlasblom 2000: 17; IEA update 1998) or 37% (Vlasblom 2000: 20). A supercritical coal plant has been built in the beginning of the 1990s with a gross efficiency of 42%. Additional plans are underway (OECD/IEA, 1999).

The EFF assumptions would reduce the fuel input to the 2020 power sector in 2020 from 15229 PJ (BAU) to 13768 (EFF), while the electrical output is still 5921 PJ (Table 7.13). As a result, emissions of both greenhouse gases and SO2 are calculated to be 9% lower than in the BAU scenario in 2020 (Table 7.14).

Table 7.13 Primary energy demand, gross electricity production, efficiency, total capacity and capacity factors for coal/oil-fired power plants in China in 2020 in the Business-as-Usual scenario (BAU) and under the assumption on increased efficiencies of power plants (EFF) (see text).

Power plant capacity class

Primary en-ergy demand

(PJ/y)1

Electricity produced (PJ/y)

Efficiency (fraction)2

Capacity (GW) Cap. Fac-tor (frac-

tion) BAU EFF BAU EFF Plants built

before 2000 plants

built after 2000

BAU EFF

Coal/Oil < 50 MW 0 0 0 0 - - 0 0 0.45-0.50 Coal/Oil 50-125 MW 543 509 164 164 0.32-0.33 0.45 8 8 0.50-0.70 Coal/Oil 125-200 MW 442 417 147 147 0.34-0.36 0.45 8 8 0.50-0.70 Coal/Oil > 200 MW 14243 12841 5610 5610 0.36-0.40 0.45 282 282 0.53-0.70 Total 15229 13768 5921 5921 - - 298 298 -

1 The demand for primary energy reflects primary energy equivalents. For fossil fuels these are defined as the net calorific input of fossil fuels or biomass (equal to the input in tons multiplied by the net calorific value), expressed in PJ.

2 In the EFF option

Table 7.14 Emissions of air pollutants from electricity production in China in 1990 and in 2020 in the Business-as-Usual scenario (BAU) and under the assumption on increased efficien-cies of power plants (EFF) (see text). Units: Tg CO2-equivalents per year for green-house gases (GHG) and Tg SO2-equivalents per year for sulphur emissions.

1990 2020-BAU 2020-EFF CO2 471 1435 1304 CH4 37 113 103 N2O 2 7 6 Total GHG 510 1554 1418 SO2 5 14 13

346 IGCC has low emissions and solid waste and a high efficiency (above 45% possible). It can be built in smaller modules of 100-150 MWe. Waste heat and gases can be sold commercially (CERI and TERI 1995). Other impor-tant options include Fluidised Bed Gasification, fuel cells, and improved methods for conventional (subcritical) pulverised coal power plants. Thermal efficiencies of these options range from 43-48% (CERI and TERI 1995). The investment costs are around 1200-1400 US$/kW under western conditions and probably cheaper in China (Chen et al, 1997).

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (240)

209

7.2.7 Increased use of cogeneration (COG)

Chapter 6 shows that the potential for cogeneration in industry in China is larger than envisaged in the BAU scenario. Here we investigate two cases for increased cogeneration. In both cases, the heat production is 3818 PJ in 2020, as opposed to 2613 PJ in the BAU scenario. It should be noted that, in line with the information available on the scenarios, an increase in district heating has not been considered in this option.

The two Best Practice Technology cases we investigate are based on the following assumptions:

­ COG-coal: in this case we assume that all heat is produced in coal-fired cogeneration facilities, with electrical and thermal efficiencies of 15% and 65%, respectively. The additional electricity produced by cogeneration is assumed to reduce the need for conventional coal-fired power plants, that are planned to built after 2000 (Table 7.15).

­ COG-gas: in this case we assume that all heat is produced in gas-fired cogeneration facilities, with electrical and thermal efficiencies of 40% and 45%, respectively. The additional electricity produced by cogeneration is assumed to reduce the need for conventional gas- and coal-fired power plants in 2020 (Table 7.15).

In the COG-coal case, greenhouse gas and sulphur emissions from the electricity sector are in 2020 2% lower than in the BAU scenario. In the COG-gas case, the reduction in greenhouse gas emissions is 1% (see also chapter 6.7).

Table 7.15 Greenhouse gas emissions from the electricity sector, primary fuel input and gross elec-tricity output for the Business-as-usual scenario (BAU) for the year 2020 for China and for the Best Practice Technology options for cogeneration.

Greenhouse gas emissions

(Tg CO2-eq/y)

Primary fuel input (PJ/y)

Gross electricity production (PJ/y)

BAU COG-coal

COG-gas

BAU COG-coal

COG-gas

BAU COG-coal

COG-gas

Coal < 50 MW 0 0 0 0 0 0 0 0 0 Coal 50-125 MW 51 51 51 543 543 543 164 164 164 Coal 125-200 MW 41 41 41 442 442 442 147 147 147 Coal > 200 MW 1328 1263 1322 14243 13548 14186 5610 5332 5587 Cogeneration (coal) 72 105 92 4019 5873 5180 603 881 777 Cogeneration (gas) 0 0 30 0 0 1005 0 0 402 Biomass 0 0 0 226 226 226 21 21 21 Large hydro 0 0 0 4743 4743 4743 1802 1802 1802 Other renewables 0 0 0 886 886 886 337 337 337 Nuclear 0 0 0 2228 2228 2228 847 847 847 Natural Gas (PP) 63 63 0 1006 1006 0 553 553 0 Total 1554 1523 1537 28336 29495 29438 10084 10084 10084

7.2.8 Reducing transmission and distribution losses (T&D)

Among U.S. utilities, energy losses from transmission and distribution are typically in the range of 5 to 10% of the primary fuels used. In China, these losses are likely to be higher (see also chapter 4). China has 15 semi-autonomous power grids between which power exchange is low since they are only interconnected at a few points. The transmission lines have typical losses of over 8%. The distribution lines have much higher loss (responsibility of purchasing enterprise) resulting in total average losses of 16-20% (World Bank, 1995).

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (241)

210

T&D losses may result in under-utilisation of power generating capacity. The State Power Corporation therefore aims at upgrading the national grid network and a more evenly distributed power generation over the regions and current T&D networks. In addition, 500-1000 kV transmission lines and substation capacity is being enlarged in order to integrate regional and provincial power grids. Introducing efficiency improving technologies such as infrared and laser equipment, helicopter patrols and operating robotics is being suggested (Kennedy, 1997).

In the BAU scenario, gross electricity production in China amounts to 10084 PJ in 2020, while the end-use of electricity amounts to 8616 PJ. The difference (1468 PJ) includes electricity losses during transmission and distribution, as well as some own use of elec-tricity by power plants. In the BAU scenario, these losses amount to 15% of the gross electricity production in 2020. In the Best Practice Technology option T&D we tenta-tively assume that these losses can be reduced by one-third, so that the losses amount to 10%. This would imply that the total losses would be 489 PJ lower. This would reduce gross electricity production to 9595 (PJ), while the end-use stays at the BAU level. We assume that this will reduce the building of new coal/oil power plants larger than 200 MW, and envisaged to be built after 2010 (Table 7.16). This would reduce 2020 emis-sions of greenhouse gases from electricity production in China by 7% and sulphur diox-ide by 8% relative to the BAU scenario (Table 7.17).

Table 7.16 Primary energy demand, gross electricity production, efficiency, total capacity and ca-pacity factors for coal/oil-fired power plants > 200 MW in China in 2020 in the Busi-ness-as-Usual scenario (BAU) and under the assumption on reduced losses during transmission and distribution (T&D) (see text).

Power plant lifetime class (building year)

Primary energy demand (PJ/y)1

Electricity produced (PJ/y)

Efficiency (fraction)

Capacity (GW) Cap. factor

(fraction) BAU T&D BAU T&D BAU T&D <1990 672 672 228 228 0.34 14 14 0.53 1990-2000 2342 2342 890 890 0.38 40 40 0.70 2000-2010 3064 3064 1225 1225 0.40 56 56 0.70 2010-2020 8166 6943 3267 2777 0.40 173 147 0.60 Total 14243 13020 5610 5121 282 256 1 The demand for primary energy reflects primary energy equivalents.

Table 7.17 Emissions of air pollutants from electricity production in China in 1990 and in 2020 in the Business-as-Usual scenario (BAU) and under the assumption on reduced losses dur-ing transmission and distribution (T&D) (see text). Units: Tg CO2-equivalents per year for greenhouse gases (GHG) and Tg SO2-equivalents per year for sulphur emissions.

1990 2020-BAU 2020-T&D CO2 471 1435 1329 CH4 37 113 105 N2O 2 7 6 Total GHG 510 1554 1440 SO2 5 14 13

7.2.9 Technologies to reduce sulphur emissions (SR)

Emissions of sulphur dioxide from power plants can be reduced by a number of add-on technologies, including flue gas desulphurisation and fuel desulphurisation. In the RAINS-Asia model, the technical potential of these options to reduce sulphur emissions from fuel use has been investigated (Foell et al., 1995; Amann et al., 2000). For the

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (242)

211

power sector, these technologies include low sulphur fuels (coal, oil), limestone injection, wet flue gas desulphurisation, regenerative flue gas desulphurisation. The results indicate that it is technically possible to reduce SO2 emissions from the power sector by at least 90%. It should be noted, that several of these technologies may increase greenhouse gas emissions. We ignored these effects because these are likely small.

7.2.10 Overview of options for China

The analysis reveals the potential effect of a number of strategies to reduce emissions of greenhouse gases (CO2, CH4 and N2O) and sulphur dioxide from the power sector in China. The calculated potentials to reduce 2020 emissions relative to the BAU scenario range from 0 (sulphur reduction, SR) to 43% (end-use efficiency improvement, EEI) for greenhouse gases and from 1% (closing small power plants, CSP) to 90% (sulphur reduction, SR) for sulphur dioxide (Table 7.18). The options that have the largest potential in reducing both greenhouse gas and sulphur emissions include end-use efficiency improvement (43 and 45% lower than BAU), replacement of coal by renewables (23 and 22%) and natural gas (11 and 21%). Reducing electricity losses during transmission and distribution would reduce emissions by 7 (greenhouse gases) and 8% (SO2) and electrical efficiency improvement of power plants 9%. Closing small power plants has a small effect on emissions (1%), as does replacement of coal by nuclear power (2%). For increased cogeneration we calculate an emission reduction of 2%, but it should be noted that this estimate is for the electricity sector only, and ignores additional reductions in fuel use for heat production.

Table 7.18 The potential to reduce emissions CO2, CH4 and N2O (GHG) and SO2 from the power sector in China in 2020, by selected options relative to the Business-as-Usual scenario. Reduction options include end-use efficiency improvement (EEI), increased use of re-newables (REN), natural gas (GAS) or nuclear power (NUC), closing small power plants (CSP), efficiency improvement of power plants (EFF) increased cogeneration (COG), a reduction transmission and distribution losses (T&D), and sulphur reduction (SR). Unit: % of BAU 2020 emission.

BPT Option

Short description (difference with Business-as-Usual scenario for 2020)

Reduction in 2020 GHG emissions

(% relative to BAU)

Reduction in 2020 SO2 emissions

(% relative to BAU)

EEI Demand for electricity is reduced by 29% relative to BAU, reducing the need for new coal/oil fired power plants

43 45

REN Use of renewables is 77% higher than in BAU, reducing the need for new coal/oil fired power plants

23 22

GAS low, no cogen

Use of natural gas is 3500 PJ as opposed to 1006 PJ in BAU, reducing the need for new coal/oil fired power plants

11 21

NUC Nuclear electricity generation is 989 PJ as opposed to 847 PJ in BAU, due to an increased plant load factor; this reduces the need for new coal/oil fired power plants

2 2

CSP All power plants with a capacity smaller than 200 MW are replaced by plants with capacities of more than 200 MW

1 1

EFF Efficiency of existing power plants is increased by 2%, and of new power plants to 45%

9 9

COG-coal Heat production is maximized, increasing also electricity production in coal-based cogeneration, which reduces the need for new coal/oil fired power plants

2 2

T&D The difference between gross electricity production and end-use of electricity is reduced by one-third to 10% of the gross electricity production

7 8

SR Sulphur emissions are reduced by 90% by end-of-pipe technologies 0 90

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (243)

212

7.3 India

7.3.1 The impact of end-use efficiency improvement (EEI) on electricity supply

The potential for end-use efficiency improvement is considerable in India (see Chapter 4). In the BAU scenario, the total electricity use in India amounts to 4500 PJ in 2020 (end-use). Implementation of the best practice options described earlier is estimated to reduce the total demand for electricity by 1436 PJ (or 32%). The BAU scenario assumes that gross electricity production in India (5168 PJ) is higher than the end-use of electric-ity. This implies that an end-use efficiency improvement of 1436 PJ would reduce gross electricity production by 1651 PJ. Here we assume that this will lead to a reduction in the building of new coal-fired power plants built after the year 2000 (Table 7.19). As a re-sult, greenhouse gas emissions are reduced by 45% relative to the BAU scenario and sulphur emissions by 43% (Table 7.20).

Table 7.19 Primary energy demand, gross electricity production, and efficiency for coal-fired power plants in India in 2020 in the Business-as-Usual scenario (BAU) and under the best practice assumptions for End-use Efficiency Improvement (EEI).

Primary energy demand (PJ/y)2

Electricity produced (PJ/y)

Efficiency (fraction)

Power plant lifetime class (capacity class and building year)1

BAU EEI BAU EEI Built <2000 Other power plants 854 854 290 290 0.34 Built >2000 Other power plants 2628 2106 998 800 0.38 Built <1990 Large point sources 544 544 185 185 0.34 Built 1990-2000 Large point sources 551 551 209 209 0.38 Built 2000-2010 Large point sources 1065 0 405 0 0.38 Built > 2010 Large point sources 2759 0 1048 0 0.38 Total 8400 4054 3136 1485 1 Large Point Sources are defined in RAINS-Asia as electricity producing facilities with a capacity of more

than 500 MW 2 The demand for primary energy reflects primary energy equivalents. For fossil fuels and biomass these are

defined as the net calorific input of fossil fuels or biomass (equal to the input in tons multiplied by the net calorific value), expressed in PJ. An equivalent amount of primary energy for processes without direct fuel consumption (wind, geothermal, hydro, nuclear, etc.,) are in accordance with the convention adopted in United Nations Statistics. For electricity producing facilities (both grid connected and non-grid connected) this is: 1 PJ of primary energy equivalent = 0.38 PJ of gross electricity produced. For heat producing facilities, this is: 1 PJ of primary energy equivalent = 1 PJ of gross heat produced.

Table 7.20 Emissions of air pollutants from electricity production in India in 1990 and in 2020 in the Business-as-Usual scenario (BAU) and under the best practice assumptions for End-use efficiency improvement (EEI). Units: Tg CO2-equivalents per year for green-house gases (GHG) and Tg SO2-equivalents per year for sulphur emissions.

1990 2020-BAU 2020-EEI CO2 236 899 496 CH4 19 74 42 N2O 1 5 4 Total GHG 256 978 542 SO2 1 3 2

7.3.2 Replacement of coal by renewables (REN)

In the BAU scenario for India, about 17% of the future electricity generation is produced from renewables in the BAU scenario. These renewables include bagasse, wind and hydropower. Here, we investigate the potential impact of increased use of renewables on

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (244)

213

emissions of air pollutants. In our best practice option, we assume that future use of renewables will develop as projected in the “Policy” scenario described by TERI et al. (1999) and Boudri et al. (2000a). This scenario reflects the potential use of renewables in China and India, as constrained by technical limits, supply limits and sustainability. This scenario does not take into account (all) institutional barriers, existing (short-term) policies and cost constraints.

The electricity produced by these renewables is under the REN assumptions 538 PJ higher than in the BAU 2020 case for India (Table 7.21). We assume that the this elec-tricity replaces coal-fired power plants to be built after the year 2000. Thus for these power plants we assume that total electricity production in 2020 is 538 PJ lower than BAU. As a result, also the total capacity and fuel input are lower than in the BAU sce-nario (Table 7.22) and about 27% of the electricity generation is produced from renew-ables.

Most of the renewables used have low emissions of greenhouse gases and sulphur diox-ide. As a result, under the REN assumptions for renewables, the total emissions of greenhouse gases from the power sector in India are by 2020 14% lower than in the BAU scenario (Table 7.22). Sulphur emissions are calculated to be 11% lower.

Table 7.21 Primary energy demand and gross electricity production by renewables in India in 2020 in the Business-as-Usual scenario (BAU) and under the best practice assumptions for use of renewables (REN). Unit: PJ/year.

Demand for primary energy1 Electricity production BAU2 REN3 BAU2 REN3 Bagasse 1280 1567 35 43 Large hydro 2175 3225 827 1226 Wind + small hydro 145 490 55 186 Total 3600 5282 917 1455 1 The demand for primary energy reflects primary energy equivalents. For bagasse these are defined as the net

calorific input (equal to the input in tons multiplied by the net calorific value), expressed in PJ. An equivalent amount of primary energy for processes without direct fuel consumption (wind and hydropower) are in accordance with the convention adopted in United Nations Statistics. For electricity producing facilities (both grid connected and non-grid connected) this is: 1 PJ of primary energy equivalent = 0.38 PJ of gross electricity produced. For heat producing facilities, this is: 1 PJ of primary energy equivalent = 1 PJ of gross heat produced.

2 From TERI et al. (1999) and Boudri et al. (2000a)

3 This is the “Policy” scenario from TERI et al. (1999) and Boudri et al. (2000a)

An Asian Dilemma - COnnecting REpositories· 2015-09-22· iii Contents Acknowledgements vii Executive Summary xi 1. The Asian Dilemma 1 1.1 Background 1 1.2 The climate change - [PDF Document] (245)

214

Table 7.22 Primary energy demand, gross electricity production, and efficiency for coal-fired power plants in India in 2020 in the Business-as-Usual scenario (BAU) and under the best practice assumptions for use of renewables (REN).

Primary energy demand (PJ/y)2

Electricity produced (PJ/y)

Efficiency (fraction)

Power plant lifetime class (capacity class and building year)1

BAU REN BAU REN Built <2000 Other power plants 854 854 290 290 0.34 Built >2000 Other power plants 2628 2628 998 998 0.38 Built <1990 Large point sources 544 544 185 185 0.34 Built 1990-2000 Large point sources 551 551 209 209 0.38 Built 2000-2010 Large point sources 1065 1065 405 405 0.38 Built > 2010 Large point sources 2759 1343 1048 510 0.38 Total 8400 6985 3136 2598 1 Large Point Sources are defined in RAINS-Asia as electricity producing facilities with a capacity of more

than 500 MW. 2 The demand for primary energy reflects primary energy equivalents. For fossil fuels these are defined as the

net calorific input of fossil fuels or biomass (equal to the input in tons multiplied by the net calorific value), expressed in PJ.

Table 7.23 Emissions of air pollutants from electricity production in India in 1990 and in 2020 in the Business-as-Usual scenario (BAU) and under the best practice assumptions for renewables (REN). Units: Tg CO2-equivalents per year for greenhouse gases (GHG) and Tg SO2-equivalents per year for sulphur emissions.

1990 2020-BAU 2020-REN CO2 236 899 767 CH4 19 74 64 N2O 1 5 5 Total GHG 256 978 837 SO2 1 3 3

7.3.3 Replacement of coal by natural gas (GAS)

In the BAU scenario the amount of gas consumed for electricity generation increases from 140 PJ in 1990 to 1693 PJ in 2020, based on an electrical efficiency of 55%. The gross electricity generated in 2020 is therefore estimated at 931 PJ in 2020. Here we investigate the impact on further increases in the use of natural gas, replacing coal- and oil-fired power plants, on emissions of air pollutants. We analyse this for several assumptions on gas use in 2020.

We investigate four Best Practice Technology options:

­ GAS low, no cogen: In this option, we tentatively assume that by 2020, the natural gas use is has doubled relative to the BAU scenario. We assume that this gas is first used in cogeneration to meet heat demands; the remaining gas is used in conven-tional power plants. This reduces coal use in cogeneration as well as in conventional power plants.

­ GAS low, cogen: In this option, we tentatively assume that by 2020, the natural gas use is has doubled relative to the BAU scenario. We assume that all of this gas is used in cogeneration, reducing coal use in cogeneration as well as in conventional power plants.

­ GAS high, no cogen: In this option, we assume that by 2020, we tentatively assume that by 2020, the natural gas use is four times that of the BAU level. We assume that